Document Controller
QCON
مجموع سنوات الخبرة :27 years, 1 أشهر
I have an extensive background and strong working experience in DOCUMENT CONTROL ACTIVITIES. Presently working in Qatar as document controller in a reputed organization.
• Quality checking and preparing comments in the event of any discrepancies have been noted and submit to EDMS Administrator or Document Control Supervisor
• Follows Documentation activities to comply with Company standards and procedures.
PROFESSIONAL EXPERIENCE.
PRESENTLY WORKING WITH QATAR ENGINEERING AND CONSTRUCTION COMPANY (QCON) SINCE APRIL- 2008.
Client: QAFAC - Qatar Fuel Additives Company.
Project (A803): QAFAC Plant Turnaround Shutdown 2014 Maintenance Works.
MAR 2014 TO MAY 2014
Position: QC Document Controller (SITE) SHUTDOWN
DEC 2013 TO FEB 2014
Position: Project Document Controller (SITE)
Client: LAFFAN REFINERY / SAMSUNG
Project (Q586): Project: Laffan Refinery Expansion Diesel Hydro Treater (DHT) Project as Document control (SAMSUNG FMCS- Field Material Control System operator)
Position: QC Document Controller (SITE) SHUTDOWN
Client: ORYX GTL
Project (Q422): Replacement of Lateral Header and Diffusers pipes in FT Reactor
Project (Q595): MOL Sieves Vessel Prop Supports
Project (Q598): Shutdown Maintenance Services 2013
JULY 2013 TO NOV 2013
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (A018): Project:1 - Replacement of Seawater Fire pumps Drivers in QG-1 & Project:2 - Refurbishment of Fire fighting systems at Jetty-2 in RLTO
Project (A022): EPIC for EPMP - flow line Tie-in for Two new QG-1 Wells.
MAY 2013 TO JUNE 2013
Position: QC Document Controller (Fabshop)
JUNE 2012 TO NOV 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q547): Brazed Aluminium Heat Exchangers (BAHX) Replacement (E0401, E0402, E0402, E0801 & E0803) In Train-4 & Train-5
Project (Q564): HCL Line modification in QG-3 & QG-4 (Project ID-800)
H2SO4 Line Modification in QG-2 (Project ID-414)
Permanent Steam Trap Provision on HHS Line in QG-2 (Project ID-415)
Isolation Valve at Sultrap View Glass in QG-2 (Project ID-416)
Project (Q565): Upgrade Material of Piping and Valves for QG-II Offgas Compressor.
APRIL 2012 TO MAY 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q488): EPIC for Sulfinol System Corrosion and Maintenance Services of 02-E0207 A/B/C/D and 02-E0206.
MARCH 2012 TO APRIL 2012
Position: QC Document Controller (FABSHOP)
• Reporting to the Project Quality Manager
• Documentation control in all respects including project final documentation.
• Assisting Welding Engineer to Preparing the Welding Procedures and Welder Matrix
• Preparation of Welder Performance.
• Preparing the Minutes of Meeting
• Controlling all the quality control procedures within the organization.
• Compilation, Review and updating of Project Procedures.
• Review and Compiling of overall Project Final Documentation.
• Co-ordination with auditing team during internal and surveillance audits
• Preparation and submission of all project QC deliverables to the Client.
• Assisting QC Engr. to raise NCRs and corrective actions where non conformities found.
• Controlling the Documents through Document control Centre (DCC) and Keeping the whole document in server as a Soft Copy
• Filing and Retrieval of Technical Documents.
• Preparing all type of QC Inspection Reports.
• Preparing the Transmittal for Project Deliverables and Keeping the record.
• Updating the Daily Welding Reports on the basis of Isometric Drawing.
• Preparation of Transmittals and maintenance of Transmittal records properly.
• Preparation of requisition for NDT after Visual Inspection of welding joints.
Project (R210): Provision of Services Regarding Steam Condensate Line Leak in QG-1 Trains (2011 Shutdown)
Project (R219): Provision of Services for Replacement of Piping Materials in Sulfinol System.
Project (R222): Provision of Services for NFB Offshore TEG Package Construction Material Modification.
Project (R227): Provision of Drainage Point for Deluge System.
Project (R208): Piping Works for Implementation of HAZOP Recommendation and Maintenance Punch List Items for Temporary KHI Injection Package in Unit-100 FMP 218.
Project (R220): Task Order # 9 (FMP-114, FMP-169, FMP-240, FMP-345)
Project (Q392): Offshore Turnaround Shutdown 2011 (Dol-1 & Dol-2)
Client: RAS GAS
Project (Q373): Providing Depressurizing Valve (BDV) on Ethane Bullet (72-V002)
Project (R217): Low Nox Retrofit Boilers Project
Client: RLOC (Raslaffan Olefins Company Ltd.
Project (R212): Low Profile Flare Repair Project
Project (R216): Temporary Flare Line Project
Client: QATAR GAS
Project (R210): Provision of Services Regarding Steam Condensate Line Leak in QG-1 Trains (2011 Shutdown Project)
Project (R211): Removal and Installation of Fall arrest Ladder System.
Project (R213): Modification of Suction and Bypass Line and Spring Support for the Refrigerant Compressor 01K0602.
Project (R219): Provision of Services for Replacement of Piping Material in Sulfinol System.
Project (Q488): EPIC for Sulfinol System Corrosion & Maintenance Services of 02-E0207 A, B, C&D and 02-E0206
Project (Q510): Piping Modification to Bypass FW20-V-3109A
SEPTEMBER 2011 TO OCTOBER 2011
Position: QA/QC Document Controller (Fabshop)
Client: QATAR PETROLEUM (QP)
Project (Q466): EPIC of Spiking facility from 12" RG condensate pipeline tie-in to 18" MOL pipeline within Dukhan Fields.
Client: DOLPHIN ENERGY LIMITED
Project (R245): Task Order # 19 - Re-routing of Drain Line and protection of Multi-core underground instrument cable in Unit 20.
MARCH 2011 TO AUGUST 2011
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (R211): Removal and Installation of Fall Arrest Ladder System
Project (R244): HHP Steam Cooling for Spare Flare Stack.
FEBRUARY 2011 TO MARCH 2011
Position: Project Document Controller (SITE)
Client: RAS GAS / CHIYODA ALMANA
Project (Q373): Providing Depressurizing Valve (BDV) on Ethane Bullet (72-V002)
Project (R217): Low Nox Retrofit Boilers Project
SEPTEMBER 2010 TO JANUARY 2011
Position: QA/QC Document Controller
Client: Dolphin Energy Ltd
Client: DOLPHIN ENERGY LTD
Project (Q325): Dolphin Energy 2010 Train-II Shutdown
Project (R222): Provision of Services for NFB offshore Teg Package Construction Material Modification.
Project (R227): Provision of Drainage Point for Deluge System.
MAY 2010 TO AUGUST 2010
Position: Project Document Controller (SITE)
Client: DOLPHIN ENERGY LTD
Project (R197): Plant Modification for Transferring Caustic from DSO Storage Tank to Unit-129.
MARCH 2010 TO MAY 2010
Position: Project Document Controller (SITE)
Client: ORYX GTL
Project (Q308): Stress Corrosion Cracking EPC Project Unit 30 (Phase-II) -Replacement of 10" & 20" IRG Lines From CS to SS (Train-1 & Train-2)
Project (R193): Internal Maintenance of 130-VR-205 LTFT Reactor (Shutdown Work)
JANUARY 2010 TO MARCH 2010
Position: Project Document Controller (SITE)
DECEMBER 2009 TO JANUARY 2010
Position: QC Document Controller (Fabshop)
Client: DOLPHIN ENERGY LTD
Project (Q201): Common Low Sulphur Condensate Storage and Export Facilities
Fabrication work of Platform and Pipe supports.
SEPTEMBER 2009 TO DECEMBER 2009
Position: Project Document Controller (SITE)
Client: ORYX GTL
Project (Q286): Installation and Commissioning of U 83 & 84 Fire suppression system
JUNE 2008 TO SEPTEMBER 2009
Position: QC Document Controller (Fabshop)
Client: DOLPHIN ENERGY LTD.
Project (Q201): Common Low Sulphur Condensate Storage and Export Facilities.
Fabrication work of Condensate Storage Drain Drum,
Fabrication work of Instrument Air Receiver and Metering Skid Drain Drum.
Client: QATAR GAS
Project (Q231): Common VOC Project Phase I
Fabrication of Piping Spools for VOC Project
APRIL 2008 TO JUNE 2008
Position: QC Document Controller (Fabshop)
Client (Q105) & (Q143): QAFCO
Project: Melamine Urea 1 Revamp Project.
Fabrication of Alloy and Stainless Piping Spools.
SEPTEMBER 2006 TO MARCH 2008
Position: Computer Operator
Company: SUBIX ELECTRICALS LTD, Kerala, India.
MARCH 2005 TO JUNE 2006
Position: Computer Operator
Company: FARSHA AGENCIES (Distributor of Havells), Kerala, India.
SEPTEMBER 2000 TO JANUARY 2005
Position: Computer Operator
Company: SHREE SUBHANANDA ENGINEERS (Venture of PEPSI), Sakinaka, Mumbai.
FEBRUARY 1997 TO AUGUST 2000
Position: EDP Assistant
Company: PRECOT MILLS LTD (ISO 9002), Kerala, India.
• Reporting to the Project Quality Manager
• Documentation control in all respects including project final documentation.
• Assisting Welding Engineer to Preparing the Welding Procedures and Welder Matrix
• Preparation of Welder Performance.
• Preparing the Minutes of Meeting
• Controlling all the quality control procedures within the organization.
• Compilation, Review and updating of Project Procedures.
• Review and Compiling of overall Project Final Documentation.
• Co-ordination with auditing team during internal and surveillance audits
• Preparation and submission of all project QC deliverables to the Client.
• Assisting QC Engr. to raise NCRs and corrective actions where non conformities found.
• Controlling the Documents through Document control Centre (DCC) and Keeping the whole document in server as a Soft Copy
• Filing and Retrieval of Technical Documents.
• Preparing all type of QC Inspection Reports.
• Preparing the Transmittal for Project Deliverables and Keeping the record.
• Updating the Daily Welding Reports on the basis of Isometric Drawing.
• Preparation of Transmittals and maintenance of Transmittal records properly.
• Preparation of requisition for NDT after Visual Inspection of welding joints.
• Alignment and Mechanical Punch List and preparing NDT Summary Sheets for Test Packs.
• Updating and filing records of Welders Qualifications.
• Preparation of Test Packs, Material Traceability Reports.
• Preparation of documents for commissioning the Project.
• Handling the Attendance Register of staff and preparing timesheet.
• Updating Index & latest approved drawings and keeping revised superseded drawings
• Assisting Central Document Control Centre (DCC) for handling Technical Documents.
• Preparation and Handover of Project Final Dossiers.
• Maintenance of Controlled Documents Register.
• Reporting to the Project Quality Manager
• Documentation control in all respects including project final documentation.
• Assisting Welding Engineer to Preparing the Welding Procedures and Welder Matrix
• Preparation of Welder Performance.
• Preparing the Minutes of Meeting
• Controlling all the quality control procedures within the organization.
• Compilation, Review and updating of Project Procedures.
• Review and Compiling of overall Project Final Documentation.
• Co-ordination with auditing team during internal and surveillance audits
• Preparation and submission of all project QC deliverables to the Client.
• Assisting QC Engr. to raise NCRs and corrective actions where non conformities found.
• Controlling the Documents through Document control Centre (DCC) and Keeping the whole document in server as a Soft Copy
• Filing and Retrieval of Technical Documents.
• Preparing all type of QC Inspection Reports.
• Preparing the Transmittal for Project Deliverables and Keeping the record.
• Updating the Daily Welding Reports on the basis of Isometric Drawing.
• Preparation of Transmittals and maintenance of Transmittal records properly.
• Preparation of requisition for NDT after Visual Inspection of welding joints.
• Alignment and Mechanical Punch List and preparing NDT Summary Sheets for Test Packs.
• Updating and filing records of Welders Qualifications.
• Preparation of Test Packs, Material Traceability Reports.
• Preparation of documents for commissioning the Project.
• Handling the Attendance Register of staff and preparing timesheet.
• Updating Index & latest approved drawings and keeping revised superseded drawings
• Assisting Central Document Control Centre (DCC) for handling Technical Documents.
• Preparation and Handover of Project Final Dossiers.
• Maintenance of Controlled Documents Register.
• Quality checking and preparing comments in the event of any discrepancies have been noted and submit to EDMS Administrator or Document Control Supervisor
• Follows Documentation activities to comply with Company standards and procedures.
PROFESSIONAL EXPERIENCE.
PRESENTLY WORKING WITH QATAR ENGINEERING AND CONSTRUCTION COMPANY (QCON) SINCE APRIL- 2008.
MAR 2014 TO MAY 2014
Position: QC Document Controller (SITE) SHUTDOWN
Client: QAFAC - Qatar Fuel Additives Company.
Project (A803): QAFAC Plant Turnaround Shutdown 2014 Maintenance Works.
DEC 2013 TO FEB 2014
Position: Project Document Controller (SITE)
Client: LAFFAN REFINERY / SAMSUNG
Project (Q586): Project: Laffan Refinery Expansion Diesel Hydro Treater (DHT) Project as Document control (SAMSUNG FMCS- Field Material Control System operator)
JULY 2013 TO NOV 2013
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (A018): Project:1 - Replacement of Seawater Fire pumps Drivers in QG-1 & Project:2 - Refurbishment of Fire fighting systems at Jetty-2 in RLTO
Project (A022): EPIC for EPMP - flow line Tie-in for Two new QG-1 Wells.
MAY 2013 TO JUNE 2013
Position: QC Document Controller (Fabshop)
Project (Q586): Welder Qualification Test Document Preparation
Project (Q570): QAFAC CDR Project
Project (A002): Qatar Petroleum Development Co. (QPD) - Fabrication and Modification of High Pressure Vessels
JANUARY 2013 TO APRIL 2013
• Alignment and Mechanical Punch List and preparing NDT Summary Sheets for Test Packs.
• Updating and filing records of Welders Qualifications.
• Preparation of Test Packs, Material Traceability Reports.
• Preparation of documents for commissioning the Project.
• Handling the Attendance Register of staff and preparing timesheet.
• Updating Index & latest approved drawings and keeping revised superseded drawings
• Assisting Central Document Control Centre (DCC) for handling Technical Documents.
• Preparation and Handover of Project Final Dossiers.
• Maintenance of Controlled Documents Register.
• Quality checking and preparing comments in the event of any discrepancies have been noted and submit to EDMS Administrator or Document Control Supervisor
• Follows Documentation activities to comply with Company standards and procedures.
PROFESSIONAL EXPERIENCE.
PRESENTLY WORKING WITH QATAR ENGINEERING AND CONSTRUCTION COMPANY (QCON) SINCE APRIL- 2008.
MAR 2014 TO MAY 2014
Position: QC Document Controller (SITE) SHUTDOWN
Client: QAFAC - Qatar Fuel Additives Company.
Project (A803): QAFAC Plant Turnaround Shutdown 2014 Maintenance Works.
DEC 2013 TO FEB 2014
Position: Project Document Controller (SITE)
Client: LAFFAN REFINERY / SAMSUNG
Project (Q586): Project: Laffan Refinery Expansion Diesel Hydro Treater (DHT) Project as Document control (SAMSUNG FMCS- Field Material Control System operator)
JULY 2013 TO NOV 2013
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (A018): Project:1 - Replacement of Seawater Fire pumps Drivers in QG-1 & Project:2 - Refurbishment of Fire fighting systems at Jetty-2 in RLTO
Project (A022): EPIC for EPMP - flow line Tie-in for Two new QG-1 Wells.
MAY 2013 TO JUNE 2013
Position: QC Document Controller (Fabshop)
Project (Q586): Welder Qualification Test Document Preparation
Project (Q570): QAFAC CDR Project
Project (A002): Qatar Petroleum Development Co. (QPD) - Fabrication and Modification of High Pressure Vessels
JANUARY 2013 TO APRIL 2013
Position: QC Document Controller (SITE) SHUTDOWN
Client: ORYX GTL
Project (Q422): Replacement of Lateral Header and Diffusers pipes in FT Reactor
Project (Q595): MOL Sieves Vessel Prop Supports
Project (Q598): Shutdown Maintenance Services 2013
JUNE 2012 TO NOV 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q547): Brazed Aluminium Heat Exchangers (BAHX) Replacement (E0401, E0402, E0402, E0801 & E0803) In Train-4 & Train-5
Project (Q564): HCL Line modification in QG-3 & QG-4 (Project ID-800)
H2SO4 Line Modification in QG-2 (Project ID-414)
Permanent Steam Trap Provision on HHS Line in QG-2 (Project ID-415)
Isolation Valve at Sultrap View Glass in QG-2 (Project ID-416)
Project (Q565): Upgrade Material of Piping and Valves for QG-II Offgas Compressor.
APRIL 2012 TO MAY 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q488): EPIC for Sulfinol System Corrosion and Maintenance Services of 02-E0207 A/B/C/D and 02-E0206.
MARCH 2012 TO APRIL 2012
Position: QC Document Controller (FABSHOP)
Client: RAS GAS
Project (Q502): Train5 Frame7 Turbine Controls upgrade & Selexol Carryover modifications (RGCP441, RFS071) Shutdown Work.
JANUARY 2012 TO MARCH 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q477): Kerojet Stripper Reboiler tube Replacement at Laffan Refinery.
Project (Q484): HCL Line material change QG-II development project at Laffan Refinery.
Project (Q510): Piping modification to Bypass 20-V3109A (Repair Work)
Project (Q488): EPIC for sulfinol system corrosion & maintenance service of 02-E0207 A/B/C/D and 02-E0206.
Project (Q486): Plateau maintenance project Technip Chiyoda joint venture.
Project (R252): Replacement of HP flare pipe (NFB Offshore)
Position: QA/QC Document Controller
Client: QATAR PETROLEUM (QP)
Project (Q466): EPIC of Spiking facility from 12" RG condensate pipeline tie-in to 18" MOL pipeline within Dukhan Fields.
Client: DOLPHIN ENERGY LIMITED
Project (R245): Task Order # 19 - Re-routing of Drain Line and protection of Multi-core underground instrument cable in Unit 20.
Project (Q392): Offshore Turnaround shutdown (DOL-1 & DOL-2)
• Reporting to the Project Quality Manager
• Documentation control in all respects including project final documentation.
• Assisting Welding Engineer to Preparing the Welding Procedures and Welder Matrix
• Preparation of Welder Performance.
• Preparing the Minutes of Meeting
• Controlling all the quality control procedures within the organization.
• Compilation, Review and updating of Project Procedures.
• Review and Compiling of overall Project Final Documentation.
• Co-ordination with auditing team during internal and surveillance audits
• Preparation and submission of all project QC deliverables to the Client.
• Assisting QC Engr. to raise NCRs and corrective actions where non conformities found.
• Controlling the Documents through Document control Centre (DCC) and Keeping the whole document in server as a Soft Copy
• Filing and Retrieval of Technical Documents.
• Preparing all type of QC Inspection Reports.
• Preparing the Transmittal for Project Deliverables and Keeping the record.
• Updating the Daily Welding Reports on the basis of Isometric Drawing.
• Preparation of Transmittals and maintenance of Transmittal records properly.
• Preparation of requisition for NDT after Visual Inspection of welding joints.
• Alignment and Mechanical Punch List and preparing NDT Summary Sheets for Test Packs.
• Updating and filing records of Welders Qualifications.
• Preparation of Test Packs, Material Traceability Reports.
• Preparation of documents for commissioning the Project.
• Handling the Attendance Register of staff and preparing timesheet.
• Updating Index & latest approved drawings and keeping revised superseded drawings
• Assisting Central Document Control Centre (DCC) for handling Technical Documents.
• Preparation and Handover of Project Final Dossiers.
• Maintenance of Controlled Documents Register.
• Quality checking and preparing comments in the event of any discrepancies have been noted and submit to EDMS Administrator or Document Control Supervisor
• Follows Documentation activities to comply with Company standards and procedures.
PROFESSIONAL EXPERIENCE.
PRESENTLY WORKING WITH QATAR ENGINEERING AND CONSTRUCTION COMPANY (QCON) SINCE APRIL- 2008.
MAR 2014 TO MAY 2014
Position: QC Document Controller (SITE) SHUTDOWN
Client: QAFAC - Qatar Fuel Additives Company.
Project (A803): QAFAC Plant Turnaround Shutdown 2014 Maintenance Works.
DEC 2013 TO FEB 2014
Position: Project Document Controller (SITE)
Client: LAFFAN REFINERY / SAMSUNG
Project (Q586): Project: Laffan Refinery Expansion Diesel Hydro Treater (DHT) Project as Document control (SAMSUNG FMCS- Field Material Control System operator)
JULY 2013 TO NOV 2013
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (A018): Project:1 - Replacement of Seawater Fire pumps Drivers in QG-1 & Project:2 - Refurbishment of Fire fighting systems at Jetty-2 in RLTO
Project (A022): EPIC for EPMP - flow line Tie-in for Two new QG-1 Wells.
MAY 2013 TO JUNE 2013
Position: QC Document Controller (Fabshop)
Project (Q586): Welder Qualification Test Document Preparation
Project (Q570): QAFAC CDR Project
Project (A002): Qatar Petroleum Development Co. (QPD) - Fabrication and Modification of High Pressure Vessels
JANUARY 2013 TO APRIL 2013
Position: QC Document Controller (SITE) SHUTDOWN
Client: ORYX GTL
Project (Q422): Replacement of Lateral Header and Diffusers pipes in FT Reactor
Project (Q595): MOL Sieves Vessel Prop Supports
Project (Q598): Shutdown Maintenance Services 2013
JUNE 2012 TO NOV 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q547): Brazed Aluminium Heat Exchangers (BAHX) Replacement (E0401, E0402, E0402, E0801 & E0803) In Train-4 & Train-5
Project (Q564): HCL Line modification in QG-3 & QG-4 (Project ID-800)
H2SO4 Line Modification in QG-2 (Project ID-414)
Permanent Steam Trap Provision on HHS Line in QG-2 (Project ID-415)
Isolation Valve at Sultrap View Glass in QG-2 (Project ID-416)
Project (Q565): Upgrade Material of Piping and Valves for QG-II Offgas Compressor.
APRIL 2012 TO MAY 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q488): EPIC for Sulfinol System Corrosion and Maintenance Services of 02-E0207 A/B/C/D and 02-E0206.
MARCH 2012 TO APRIL 2012
Position: QC Document Controller (FABSHOP)
Client: RAS GAS
Project (Q502): Train5 Frame7 Turbine Controls upgrade & Selexol Carryover modifications (RGCP441, RFS071) Shutdown Work.
JANUARY 2012 TO MARCH 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q477): Kerojet Stripper Reboiler tube Replacement at Laffan Refinery.
Project (Q484): HCL Line material change QG-II development project at Laffan Refinery.
Project (Q510): Piping modification to Bypass 20-V3109A (Repair Work)
Project (Q488): EPIC for sulfinol system corrosion & maintenance service of 02-E0207 A/B/C/D and 02-E0206.
Project (Q486): Plateau maintenance project Technip Chiyoda joint venture.
Project (R252): Replacement of HP flare pipe (NFB Offshore)
Position: QA/QC Document Controller
Client: QATAR PETROLEUM (QP)
Project (Q466): EPIC of Spiking facility from 12" RG condensate pipeline tie-in to 18" MOL pipeline within Dukhan Fields.
Client: DOLPHIN ENERGY LIMITED
Project (R245): Task Order # 19 - Re-routing of Drain Line and protection of Multi-core underground instrument cable in Unit 20.
Project (Q392): Offshore Turnaround shutdown (DOL-1 & DOL-2)
NOVEMBER 2011 DECEMBER 2011
Client: QATAR GAS
Position: Project Document Controller (SITE)
Project (R247): Closed Drain System for Jet A1 drain from DBB valve on Jetty-2.
Project (Q477): Kerojet Stripper Reboiler tube replacement work at Laffan Refinery.
Project (Q484): HCL Line Material Change (QG-II Development Project) at Laffan Refinery.