kannan.t. Swamy, Document Controller

kannan.t. Swamy

Document Controller

QCON

البلد
قطر - الدوحة
التعليم
بكالوريوس, Computer Science
الخبرات
27 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :27 years, 1 أشهر

Document Controller في QCON
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ أبريل 2008

I have an extensive background and strong working experience in DOCUMENT CONTROL ACTIVITIES. Presently working in Qatar as document controller in a reputed organization.

EDMS Administrator or Document Control Supervisor في Follows Documentation
  • أبريل 2008 إلى أغسطس 2014

• Quality checking and preparing comments in the event of any discrepancies have been noted and submit to EDMS Administrator or Document Control Supervisor
• Follows Documentation activities to comply with Company standards and procedures.
PROFESSIONAL EXPERIENCE.
PRESENTLY WORKING WITH QATAR ENGINEERING AND CONSTRUCTION COMPANY (QCON) SINCE APRIL- 2008.

في QAFAC - Qatar Fuel Additives Company
  • يناير 2014 إلى أغسطس 2014

Client: QAFAC - Qatar Fuel Additives Company.
Project (A803): QAFAC Plant Turnaround Shutdown 2014 Maintenance Works.

QC Document Controller (SITE) SHUTDOWN في SHUTDOWN
  • مارس 2014 إلى مايو 2014

MAR 2014 TO MAY 2014
Position: QC Document Controller (SITE) SHUTDOWN

Project Document Controller (SITE) في LAFFAN REFINERY / SAMSUNG
  • ديسمبر 2013 إلى فبراير 2014

DEC 2013 TO FEB 2014
Position: Project Document Controller (SITE)
Client: LAFFAN REFINERY / SAMSUNG
Project (Q586): Project: Laffan Refinery Expansion Diesel Hydro Treater (DHT) Project as Document control (SAMSUNG FMCS- Field Material Control System operator)

QC Document Controller (SITE) SHUTDOWN في ORYX GTL
  • قطر
  • يناير 2013 إلى ديسمبر 2013

Position: QC Document Controller (SITE) SHUTDOWN
Client: ORYX GTL
Project (Q422): Replacement of Lateral Header and Diffusers pipes in FT Reactor
Project (Q595): MOL Sieves Vessel Prop Supports
Project (Q598): Shutdown Maintenance Services 2013

Project Document Controller (SITE) في QATAR GAS
  • قطر
  • يوليو 2013 إلى نوفمبر 2013

JULY 2013 TO NOV 2013
Position: Project Document Controller (SITE)
Client: QATAR GAS

QC Document Controller (Fabshop) في 2 - Refurbishment of Fire fighting systems
  • مايو 2013 إلى يونيو 2013

Project (A018): Project:1 - Replacement of Seawater Fire pumps Drivers in QG-1 & Project:2 - Refurbishment of Fire fighting systems at Jetty-2 in RLTO
Project (A022): EPIC for EPMP - flow line Tie-in for Two new QG-1 Wells.

MAY 2013 TO JUNE 2013
Position: QC Document Controller (Fabshop)

Welder Qualification Test Document Preparation في Qatar Petroleum Development Co
  • يناير 2013 إلى أبريل 2013
Project Document Controller (SITE) في QATAR GAS
  • قطر
  • يونيو 2012 إلى نوفمبر 2012

JUNE 2012 TO NOV 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q547): Brazed Aluminium Heat Exchangers (BAHX) Replacement (E0401, E0402, E0402, E0801 & E0803) In Train-4 & Train-5
Project (Q564): HCL Line modification in QG-3 & QG-4 (Project ID-800)
H2SO4 Line Modification in QG-2 (Project ID-414)
Permanent Steam Trap Provision on HHS Line in QG-2 (Project ID-415)

Project Document Controller (SITE) في Isolation Valve
  • أبريل 2012 إلى مايو 2012

Isolation Valve at Sultrap View Glass in QG-2 (Project ID-416)
Project (Q565): Upgrade Material of Piping and Valves for QG-II Offgas Compressor.

APRIL 2012 TO MAY 2012
Position: Project Document Controller (SITE)

QC Document Controller (FABSHOP) في QATAR GAS
  • قطر
  • مارس 2012 إلى أبريل 2012

Client: QATAR GAS
Project (Q488): EPIC for Sulfinol System Corrosion and Maintenance Services of 02-E0207 A/B/C/D and 02-E0206.

MARCH 2012 TO APRIL 2012
Position: QC Document Controller (FABSHOP)

Project Document Controller (SITE) في RAS GAS
  • الكويت
  • يناير 2012 إلى مارس 2012

• Reporting to the Project Quality Manager
• Documentation control in all respects including project final documentation.
• Assisting Welding Engineer to Preparing the Welding Procedures and Welder Matrix
• Preparation of Welder Performance.
• Preparing the Minutes of Meeting
• Controlling all the quality control procedures within the organization.
• Compilation, Review and updating of Project Procedures.
• Review and Compiling of overall Project Final Documentation.
• Co-ordination with auditing team during internal and surveillance audits
• Preparation and submission of all project QC deliverables to the Client.
• Assisting QC Engr. to raise NCRs and corrective actions where non conformities found.
• Controlling the Documents through Document control Centre (DCC) and Keeping the whole document in server as a Soft Copy
• Filing and Retrieval of Technical Documents.
• Preparing all type of QC Inspection Reports.
• Preparing the Transmittal for Project Deliverables and Keeping the record.
• Updating the Daily Welding Reports on the basis of Isometric Drawing.
• Preparation of Transmittals and maintenance of Transmittal records properly.
• Preparation of requisition for NDT after Visual Inspection of welding joints.

Project Document Controller (SITE) في QATAR GAS
  • قطر
  • نوفمبر 2011 إلى ديسمبر 2011
في Provision of Services Regarding Steam Condensate Line Leak
  • يناير 2011 إلى ديسمبر 2011

Project (R210): Provision of Services Regarding Steam Condensate Line Leak in QG-1 Trains (2011 Shutdown)
Project (R219): Provision of Services for Replacement of Piping Materials in Sulfinol System.
Project (R222): Provision of Services for NFB Offshore TEG Package Construction Material Modification.
Project (R227): Provision of Drainage Point for Deluge System.

في Piping Works
  • الهند
  • يناير 2011 إلى ديسمبر 2011

Project (R208): Piping Works for Implementation of HAZOP Recommendation and Maintenance Punch List Items for Temporary KHI Injection Package in Unit-100 FMP 218.
Project (R220): Task Order # 9 (FMP-114, FMP-169, FMP-240, FMP-345)
Project (Q392): Offshore Turnaround Shutdown 2011 (Dol-1 & Dol-2)


Client: RAS GAS
Project (Q373): Providing Depressurizing Valve (BDV) on Ethane Bullet (72-V002)
Project (R217): Low Nox Retrofit Boilers Project

Client: RLOC (Raslaffan Olefins Company Ltd.
Project (R212): Low Profile Flare Repair Project
Project (R216): Temporary Flare Line Project

Modification of Suction and Bypass Line and Spring Support for the Refrigerant Compressor 01K0602 في QATAR GAS
  • قطر
  • يناير 2011 إلى ديسمبر 2011

Client: QATAR GAS
Project (R210): Provision of Services Regarding Steam Condensate Line Leak in QG-1 Trains (2011 Shutdown Project)
Project (R211): Removal and Installation of Fall arrest Ladder System.
Project (R213): Modification of Suction and Bypass Line and Spring Support for the Refrigerant Compressor 01K0602.
Project (R219): Provision of Services for Replacement of Piping Material in Sulfinol System.

QA/QC Document Controller (Fabshop) في Sulfinol System Corrosion & Maintenance Services
  • سبتمبر 2011 إلى أكتوبر 2011

Project (Q488): EPIC for Sulfinol System Corrosion & Maintenance Services of 02-E0207 A, B, C&D and 02-E0206
Project (Q510): Piping Modification to Bypass FW20-V-3109A

SEPTEMBER 2011 TO OCTOBER 2011
Position: QA/QC Document Controller (Fabshop)
Client: QATAR PETROLEUM (QP)
Project (Q466): EPIC of Spiking facility from 12" RG condensate pipeline tie-in to 18" MOL pipeline within Dukhan Fields.

Project Document Controller (SITE) في DOLPHIN ENERGY LIMITED
  • قطر
  • مارس 2011 إلى أغسطس 2011

Client: DOLPHIN ENERGY LIMITED
Project (R245): Task Order # 19 - Re-routing of Drain Line and protection of Multi-core underground instrument cable in Unit 20.

MARCH 2011 TO AUGUST 2011
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (R211): Removal and Installation of Fall Arrest Ladder System

Project Document Controller (SITE) في HHP Steam Cooling for Spare Flare Stack
  • فبراير 2011 إلى مارس 2011

Project (R244): HHP Steam Cooling for Spare Flare Stack.

FEBRUARY 2011 TO MARCH 2011
Position: Project Document Controller (SITE)
Client: RAS GAS / CHIYODA ALMANA

QA/QC Document Controller في (BDV) on Ethane Bullet (72
  • سبتمبر 2010 إلى يناير 2011

Project (Q373): Providing Depressurizing Valve (BDV) on Ethane Bullet (72-V002)
Project (R217): Low Nox Retrofit Boilers Project

SEPTEMBER 2010 TO JANUARY 2011
Position: QA/QC Document Controller
Client: Dolphin Energy Ltd

في DOLPHIN ENERGY LTD
  • قطر
  • يناير 2010 إلى ديسمبر 2010

Client: DOLPHIN ENERGY LTD
Project (Q325): Dolphin Energy 2010 Train-II Shutdown

Project Document Controller (SITE) في Provision of Services
  • مايو 2010 إلى أغسطس 2010

Project (R222): Provision of Services for NFB offshore Teg Package Construction Material Modification.
Project (R227): Provision of Drainage Point for Deluge System.

MAY 2010 TO AUGUST 2010
Position: Project Document Controller (SITE)
Client: DOLPHIN ENERGY LTD
Project (R197): Plant Modification for Transferring Caustic from DSO Storage Tank to Unit-129.

Project Document Controller (SITE) في ORYX GTL
  • قطر
  • مارس 2010 إلى مايو 2010

MARCH 2010 TO MAY 2010
Position: Project Document Controller (SITE)
Client: ORYX GTL

Project Document Controller (SITE) في Stress Corrosion Cracking EPC Project Unit
  • يناير 2010 إلى مارس 2010

Project (Q308): Stress Corrosion Cracking EPC Project Unit 30 (Phase-II) -Replacement of 10" & 20" IRG Lines From CS to SS (Train-1 & Train-2)
Project (R193): Internal Maintenance of 130-VR-205 LTFT Reactor (Shutdown Work)

JANUARY 2010 TO MARCH 2010
Position: Project Document Controller (SITE)

QC Document Controller (Fabshop) في DOLPHIN ENERGY LTD
  • قطر
  • ديسمبر 2009 إلى يناير 2010

DECEMBER 2009 TO JANUARY 2010
Position: QC Document Controller (Fabshop)
Client: DOLPHIN ENERGY LTD
Project (Q201): Common Low Sulphur Condensate Storage and Export Facilities
Fabrication work of Platform and Pipe supports.

Project Document Controller (SITE) في ORYX GTL
  • قطر
  • سبتمبر 2009 إلى ديسمبر 2009

SEPTEMBER 2009 TO DECEMBER 2009
Position: Project Document Controller (SITE)
Client: ORYX GTL
Project (Q286): Installation and Commissioning of U 83 & 84 Fire suppression system

QC Document Controller (Fabshop) في DOLPHIN ENERGY LTD
  • قطر
  • يونيو 2008 إلى سبتمبر 2009

JUNE 2008 TO SEPTEMBER 2009
Position: QC Document Controller (Fabshop)
Client: DOLPHIN ENERGY LTD.
Project (Q201): Common Low Sulphur Condensate Storage and Export Facilities.
Fabrication work of Condensate Storage Drain Drum,
Fabrication work of Instrument Air Receiver and Metering Skid Drain Drum.

QC Document Controller (Fabshop) في QATAR GAS
  • قطر
  • أبريل 2008 إلى يونيو 2008

Client: QATAR GAS
Project (Q231): Common VOC Project Phase I
Fabrication of Piping Spools for VOC Project

APRIL 2008 TO JUNE 2008
Position: QC Document Controller (Fabshop)
Client (Q105) & (Q143): QAFCO
Project: Melamine Urea 1 Revamp Project.
Fabrication of Alloy and Stainless Piping Spools.

Computer Operator في SUBIX ELECTRICALS LTD
  • الهند
  • سبتمبر 2006 إلى مارس 2008

SEPTEMBER 2006 TO MARCH 2008
Position: Computer Operator
Company: SUBIX ELECTRICALS LTD, Kerala, India.

Computer Operator في FARSHA AGENCIES
  • الهند
  • مارس 2005 إلى يونيو 2006

MARCH 2005 TO JUNE 2006
Position: Computer Operator
Company: FARSHA AGENCIES (Distributor of Havells), Kerala, India.

Computer Operator في SHREE SUBHANANDA ENGINEERS
  • الهند
  • سبتمبر 2000 إلى يناير 2005

SEPTEMBER 2000 TO JANUARY 2005
Position: Computer Operator
Company: SHREE SUBHANANDA ENGINEERS (Venture of PEPSI), Sakinaka, Mumbai.

EDP Assistant في PRECOT MILLS LTD
  • الهند
  • فبراير 1997 إلى أغسطس 2000

FEBRUARY 1997 TO AUGUST 2000
Position: EDP Assistant
Company: PRECOT MILLS LTD (ISO 9002), Kerala, India.

EDMS Administrator or Document Control Supervisor في Follows Documentation
  • الهند
  • إلى

• Reporting to the Project Quality Manager
• Documentation control in all respects including project final documentation.
• Assisting Welding Engineer to Preparing the Welding Procedures and Welder Matrix
• Preparation of Welder Performance.
• Preparing the Minutes of Meeting
• Controlling all the quality control procedures within the organization.
• Compilation, Review and updating of Project Procedures.
• Review and Compiling of overall Project Final Documentation.
• Co-ordination with auditing team during internal and surveillance audits
• Preparation and submission of all project QC deliverables to the Client.
• Assisting QC Engr. to raise NCRs and corrective actions where non conformities found.
• Controlling the Documents through Document control Centre (DCC) and Keeping the whole document in server as a Soft Copy
• Filing and Retrieval of Technical Documents.
• Preparing all type of QC Inspection Reports.
• Preparing the Transmittal for Project Deliverables and Keeping the record.
• Updating the Daily Welding Reports on the basis of Isometric Drawing.
• Preparation of Transmittals and maintenance of Transmittal records properly.
• Preparation of requisition for NDT after Visual Inspection of welding joints.
• Alignment and Mechanical Punch List and preparing NDT Summary Sheets for Test Packs.
• Updating and filing records of Welders Qualifications.
• Preparation of Test Packs, Material Traceability Reports.
• Preparation of documents for commissioning the Project.
• Handling the Attendance Register of staff and preparing timesheet.
• Updating Index & latest approved drawings and keeping revised superseded drawings
• Assisting Central Document Control Centre (DCC) for handling Technical Documents.
• Preparation and Handover of Project Final Dossiers.
• Maintenance of Controlled Documents Register.

QC Document Controller (SITE) في SHUTDOWN
  • إلى

• Reporting to the Project Quality Manager
• Documentation control in all respects including project final documentation.
• Assisting Welding Engineer to Preparing the Welding Procedures and Welder Matrix
• Preparation of Welder Performance.
• Preparing the Minutes of Meeting
• Controlling all the quality control procedures within the organization.
• Compilation, Review and updating of Project Procedures.
• Review and Compiling of overall Project Final Documentation.
• Co-ordination with auditing team during internal and surveillance audits
• Preparation and submission of all project QC deliverables to the Client.
• Assisting QC Engr. to raise NCRs and corrective actions where non conformities found.
• Controlling the Documents through Document control Centre (DCC) and Keeping the whole document in server as a Soft Copy
• Filing and Retrieval of Technical Documents.
• Preparing all type of QC Inspection Reports.
• Preparing the Transmittal for Project Deliverables and Keeping the record.
• Updating the Daily Welding Reports on the basis of Isometric Drawing.
• Preparation of Transmittals and maintenance of Transmittal records properly.
• Preparation of requisition for NDT after Visual Inspection of welding joints.

QC Document Controller (SITE) SHUTDOWN في ORYX GTL
  • الهند
  • إلى

• Alignment and Mechanical Punch List and preparing NDT Summary Sheets for Test Packs.
• Updating and filing records of Welders Qualifications.
• Preparation of Test Packs, Material Traceability Reports.
• Preparation of documents for commissioning the Project.
• Handling the Attendance Register of staff and preparing timesheet.
• Updating Index & latest approved drawings and keeping revised superseded drawings
• Assisting Central Document Control Centre (DCC) for handling Technical Documents.
• Preparation and Handover of Project Final Dossiers.
• Maintenance of Controlled Documents Register.
• Quality checking and preparing comments in the event of any discrepancies have been noted and submit to EDMS Administrator or Document Control Supervisor
• Follows Documentation activities to comply with Company standards and procedures.
PROFESSIONAL EXPERIENCE.
PRESENTLY WORKING WITH QATAR ENGINEERING AND CONSTRUCTION COMPANY (QCON) SINCE APRIL- 2008.

MAR 2014 TO MAY 2014
Position: QC Document Controller (SITE) SHUTDOWN
Client: QAFAC - Qatar Fuel Additives Company.
Project (A803): QAFAC Plant Turnaround Shutdown 2014 Maintenance Works.

DEC 2013 TO FEB 2014
Position: Project Document Controller (SITE)
Client: LAFFAN REFINERY / SAMSUNG
Project (Q586): Project: Laffan Refinery Expansion Diesel Hydro Treater (DHT) Project as Document control (SAMSUNG FMCS- Field Material Control System operator)

JULY 2013 TO NOV 2013
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (A018): Project:1 - Replacement of Seawater Fire pumps Drivers in QG-1 & Project:2 - Refurbishment of Fire fighting systems at Jetty-2 in RLTO
Project (A022): EPIC for EPMP - flow line Tie-in for Two new QG-1 Wells.

MAY 2013 TO JUNE 2013
Position: QC Document Controller (Fabshop)
Project (Q586): Welder Qualification Test Document Preparation
Project (Q570): QAFAC CDR Project
Project (A002): Qatar Petroleum Development Co. (QPD) - Fabrication and Modification of High Pressure Vessels

JANUARY 2013 TO APRIL 2013

QA/QC Document Controller في QATAR PETROLEUM
  • الهند
  • إلى

• Alignment and Mechanical Punch List and preparing NDT Summary Sheets for Test Packs.
• Updating and filing records of Welders Qualifications.
• Preparation of Test Packs, Material Traceability Reports.
• Preparation of documents for commissioning the Project.
• Handling the Attendance Register of staff and preparing timesheet.
• Updating Index & latest approved drawings and keeping revised superseded drawings
• Assisting Central Document Control Centre (DCC) for handling Technical Documents.
• Preparation and Handover of Project Final Dossiers.
• Maintenance of Controlled Documents Register.
• Quality checking and preparing comments in the event of any discrepancies have been noted and submit to EDMS Administrator or Document Control Supervisor
• Follows Documentation activities to comply with Company standards and procedures.
PROFESSIONAL EXPERIENCE.
PRESENTLY WORKING WITH QATAR ENGINEERING AND CONSTRUCTION COMPANY (QCON) SINCE APRIL- 2008.

MAR 2014 TO MAY 2014
Position: QC Document Controller (SITE) SHUTDOWN
Client: QAFAC - Qatar Fuel Additives Company.
Project (A803): QAFAC Plant Turnaround Shutdown 2014 Maintenance Works.

DEC 2013 TO FEB 2014
Position: Project Document Controller (SITE)
Client: LAFFAN REFINERY / SAMSUNG
Project (Q586): Project: Laffan Refinery Expansion Diesel Hydro Treater (DHT) Project as Document control (SAMSUNG FMCS- Field Material Control System operator)

JULY 2013 TO NOV 2013
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (A018): Project:1 - Replacement of Seawater Fire pumps Drivers in QG-1 & Project:2 - Refurbishment of Fire fighting systems at Jetty-2 in RLTO
Project (A022): EPIC for EPMP - flow line Tie-in for Two new QG-1 Wells.

MAY 2013 TO JUNE 2013
Position: QC Document Controller (Fabshop)
Project (Q586): Welder Qualification Test Document Preparation
Project (Q570): QAFAC CDR Project
Project (A002): Qatar Petroleum Development Co. (QPD) - Fabrication and Modification of High Pressure Vessels

JANUARY 2013 TO APRIL 2013
Position: QC Document Controller (SITE) SHUTDOWN
Client: ORYX GTL
Project (Q422): Replacement of Lateral Header and Diffusers pipes in FT Reactor
Project (Q595): MOL Sieves Vessel Prop Supports
Project (Q598): Shutdown Maintenance Services 2013

JUNE 2012 TO NOV 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q547): Brazed Aluminium Heat Exchangers (BAHX) Replacement (E0401, E0402, E0402, E0801 & E0803) In Train-4 & Train-5
Project (Q564): HCL Line modification in QG-3 & QG-4 (Project ID-800)
H2SO4 Line Modification in QG-2 (Project ID-414)
Permanent Steam Trap Provision on HHS Line in QG-2 (Project ID-415)
Isolation Valve at Sultrap View Glass in QG-2 (Project ID-416)
Project (Q565): Upgrade Material of Piping and Valves for QG-II Offgas Compressor.

APRIL 2012 TO MAY 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q488): EPIC for Sulfinol System Corrosion and Maintenance Services of 02-E0207 A/B/C/D and 02-E0206.

MARCH 2012 TO APRIL 2012
Position: QC Document Controller (FABSHOP)
Client: RAS GAS
Project (Q502): Train5 Frame7 Turbine Controls upgrade & Selexol Carryover modifications (RGCP441, RFS071) Shutdown Work.

JANUARY 2012 TO MARCH 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q477): Kerojet Stripper Reboiler tube Replacement at Laffan Refinery.
Project (Q484): HCL Line material change QG-II development project at Laffan Refinery.
Project (Q510): Piping modification to Bypass 20-V3109A (Repair Work)
Project (Q488): EPIC for sulfinol system corrosion & maintenance service of 02-E0207 A/B/C/D and 02-E0206.
Project (Q486): Plateau maintenance project Technip Chiyoda joint venture.
Project (R252): Replacement of HP flare pipe (NFB Offshore)
Position: QA/QC Document Controller
Client: QATAR PETROLEUM (QP)
Project (Q466): EPIC of Spiking facility from 12" RG condensate pipeline tie-in to 18" MOL pipeline within Dukhan Fields.
Client: DOLPHIN ENERGY LIMITED
Project (R245): Task Order # 19 - Re-routing of Drain Line and protection of Multi-core underground instrument cable in Unit 20.
Project (Q392): Offshore Turnaround shutdown (DOL-1 & DOL-2)

(QG-II Development Project) at Laffan Refinery في HCL Line Material Change
  • إلى

• Reporting to the Project Quality Manager
• Documentation control in all respects including project final documentation.
• Assisting Welding Engineer to Preparing the Welding Procedures and Welder Matrix
• Preparation of Welder Performance.
• Preparing the Minutes of Meeting
• Controlling all the quality control procedures within the organization.
• Compilation, Review and updating of Project Procedures.
• Review and Compiling of overall Project Final Documentation.
• Co-ordination with auditing team during internal and surveillance audits
• Preparation and submission of all project QC deliverables to the Client.
• Assisting QC Engr. to raise NCRs and corrective actions where non conformities found.
• Controlling the Documents through Document control Centre (DCC) and Keeping the whole document in server as a Soft Copy
• Filing and Retrieval of Technical Documents.
• Preparing all type of QC Inspection Reports.
• Preparing the Transmittal for Project Deliverables and Keeping the record.
• Updating the Daily Welding Reports on the basis of Isometric Drawing.
• Preparation of Transmittals and maintenance of Transmittal records properly.
• Preparation of requisition for NDT after Visual Inspection of welding joints.

QA/QC Document Controller في Sulfinol System Corrosion & Maintenance Services
  • الهند
  • إلى

• Alignment and Mechanical Punch List and preparing NDT Summary Sheets for Test Packs.
• Updating and filing records of Welders Qualifications.
• Preparation of Test Packs, Material Traceability Reports.
• Preparation of documents for commissioning the Project.
• Handling the Attendance Register of staff and preparing timesheet.
• Updating Index & latest approved drawings and keeping revised superseded drawings
• Assisting Central Document Control Centre (DCC) for handling Technical Documents.
• Preparation and Handover of Project Final Dossiers.
• Maintenance of Controlled Documents Register.
• Quality checking and preparing comments in the event of any discrepancies have been noted and submit to EDMS Administrator or Document Control Supervisor
• Follows Documentation activities to comply with Company standards and procedures.
PROFESSIONAL EXPERIENCE.
PRESENTLY WORKING WITH QATAR ENGINEERING AND CONSTRUCTION COMPANY (QCON) SINCE APRIL- 2008.

MAR 2014 TO MAY 2014
Position: QC Document Controller (SITE) SHUTDOWN
Client: QAFAC - Qatar Fuel Additives Company.
Project (A803): QAFAC Plant Turnaround Shutdown 2014 Maintenance Works.

DEC 2013 TO FEB 2014
Position: Project Document Controller (SITE)
Client: LAFFAN REFINERY / SAMSUNG
Project (Q586): Project: Laffan Refinery Expansion Diesel Hydro Treater (DHT) Project as Document control (SAMSUNG FMCS- Field Material Control System operator)

JULY 2013 TO NOV 2013
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (A018): Project:1 - Replacement of Seawater Fire pumps Drivers in QG-1 & Project:2 - Refurbishment of Fire fighting systems at Jetty-2 in RLTO
Project (A022): EPIC for EPMP - flow line Tie-in for Two new QG-1 Wells.

MAY 2013 TO JUNE 2013
Position: QC Document Controller (Fabshop)
Project (Q586): Welder Qualification Test Document Preparation
Project (Q570): QAFAC CDR Project
Project (A002): Qatar Petroleum Development Co. (QPD) - Fabrication and Modification of High Pressure Vessels

JANUARY 2013 TO APRIL 2013
Position: QC Document Controller (SITE) SHUTDOWN
Client: ORYX GTL
Project (Q422): Replacement of Lateral Header and Diffusers pipes in FT Reactor
Project (Q595): MOL Sieves Vessel Prop Supports
Project (Q598): Shutdown Maintenance Services 2013

JUNE 2012 TO NOV 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q547): Brazed Aluminium Heat Exchangers (BAHX) Replacement (E0401, E0402, E0402, E0801 & E0803) In Train-4 & Train-5
Project (Q564): HCL Line modification in QG-3 & QG-4 (Project ID-800)
H2SO4 Line Modification in QG-2 (Project ID-414)
Permanent Steam Trap Provision on HHS Line in QG-2 (Project ID-415)
Isolation Valve at Sultrap View Glass in QG-2 (Project ID-416)
Project (Q565): Upgrade Material of Piping and Valves for QG-II Offgas Compressor.

APRIL 2012 TO MAY 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q488): EPIC for Sulfinol System Corrosion and Maintenance Services of 02-E0207 A/B/C/D and 02-E0206.

MARCH 2012 TO APRIL 2012
Position: QC Document Controller (FABSHOP)
Client: RAS GAS
Project (Q502): Train5 Frame7 Turbine Controls upgrade & Selexol Carryover modifications (RGCP441, RFS071) Shutdown Work.

JANUARY 2012 TO MARCH 2012
Position: Project Document Controller (SITE)
Client: QATAR GAS
Project (Q477): Kerojet Stripper Reboiler tube Replacement at Laffan Refinery.
Project (Q484): HCL Line material change QG-II development project at Laffan Refinery.
Project (Q510): Piping modification to Bypass 20-V3109A (Repair Work)
Project (Q488): EPIC for sulfinol system corrosion & maintenance service of 02-E0207 A/B/C/D and 02-E0206.
Project (Q486): Plateau maintenance project Technip Chiyoda joint venture.
Project (R252): Replacement of HP flare pipe (NFB Offshore)
Position: QA/QC Document Controller
Client: QATAR PETROLEUM (QP)
Project (Q466): EPIC of Spiking facility from 12" RG condensate pipeline tie-in to 18" MOL pipeline within Dukhan Fields.
Client: DOLPHIN ENERGY LIMITED
Project (R245): Task Order # 19 - Re-routing of Drain Line and protection of Multi-core underground instrument cable in Unit 20.
Project (Q392): Offshore Turnaround shutdown (DOL-1 & DOL-2)

NOVEMBER 2011 DECEMBER 2011
Client: QATAR GAS
Position: Project Document Controller (SITE)
Project (R247): Closed Drain System for Jet A1 drain from DBB valve on Jetty-2.
Project (Q477): Kerojet Stripper Reboiler tube replacement work at Laffan Refinery.
Project (Q484): HCL Line Material Change (QG-II Development Project) at Laffan Refinery.

الخلفية التعليمية

بكالوريوس, Computer Science
  • في Datapro
  • مارس 1997
بكالوريوس, Economics
  • في Calicut University
  • مارس 1995

Specialties & Skills

ALUMINUM
DOCUMENT CONTROL
ISO 9002
ISO CERTIFICATION
MAINTENANCE
OFFSHORE
QUALITY CHECKING

اللغات

الهندية
متمرّس
الملايام
متمرّس
الانجليزية
متمرّس
التاميلية
متمرّس