HVAC Design Engineer
HTCO for eletromechanical works
Total years of experience :9 years, 4 Months
-Design HVAC systems, heat load calculation by software programmes as HAP, AHUs selection, FCUs selection, duct design and static pressure calculation
-Design and calculate energy recovery unit ERU and its selection.
-Design and calculate hydraulic calculation including water volume required, pipe sizing, pump head, expansion tank calculation and pump selection.
-Calculation of chiller capacity and its selection.
-Design energy transfer station (ETS room) for district cooling system as Qatar regulation and LUSSAIL development.
-Design and calculate mechanical ventilation and pressurization system.
- Technical office works including BOQ.
-Reviewing Design Drawings, combined services coordinated drawings & Shop Drawings in relation with MEP, Architectural & structural drawings
- Reviewing method statements for installations, for HVAC, smoke management system, Plumbing and Firefighting.
- Reviewing, Coordinating & finalizing field design changes.
-Site survey works.
- Technical office works including BOQ.
-Reviewing Design Drawings, combined services coordinated drawings & Shop Drawings in relation with MEP, Architectural & structural drawings
- Reviewing method statements for installations, for HVAC, smoke management system, Plumbing and Firefighting.
- Reviewing, Coordinating & finalizing field design changes.
-Site survey works.