Senior Land Surveyor
Gama Construction
Total years of experience :20 years, 0 Months
Responsible about all survey work as a Survey Manager and a Leader of The Surveyors Team.
check levels and location for all buildings.
adjust all buildings in the projects in the exactly location and levels from the original drownings and export to the survey instruments and construction in the site.
check the main control points and make the travers.
Excavate Buildings location and levels. Adjust foundations and columns.
controller of the casting items and embedded parts and fabrication store.
check the silos slip form and tunnels construction and substations and Cement packing buildings and pump Rooms in those coming projects ....
1-Project : up Gread for cement factory
Owner: South Valley Cement company.
Consultant: Cement Consultancy Assocites.
Contractor: Sinoma \{CDI\} ( Chengdu Design & Research Institute of Building Materials Industry
ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
2-Project :GOE Arish Cement Plant phase 2
line 3/5775) TPD
Owner: GOE.
Consultant: RHI ( Reliance heavy industries)
E ( cosmos-E / Engineers & consultant)
Contractor: Sinoma \{CDI\} ( Chengdu Design & Research Institute of Building Materials Industry CO.
*Responsible About All survey work and Team Leader to adjust all buildings in the project in the correct location with the coordinate and exactly level.
it's a water station and pipeline project construction
2 water tanks 10000M3
2 clarifier buildings
1 filter tanks
pump Room and electric substation.
mark and excavated the pipeline and adjust the pips ( 1400/17.50m)
in the location and levels according to the drawings.
Project: WATER TRANSMISSION PROJECT FROM HALI DAM TO SHUAIBA STATION(WTP
AND PIPE LINE 1400mm(80km)
OWNER : Kingdom of Saudi Arabia ( MINISTRY OF WATER & ELECTRICITY) Project Execution Department
Consultant : M. H.ALTAH NESPAK(ENGINEERING CONSULTANT
Contractor: ALISHAR contracting corp
* construction civil work for 5 Small Bridges spame 250 M on pills and pills cap between 2 Sides of the Lagoons.
Earth work and landscape...
1- Project: Sidi Abdel Rahman resort community Mediterranean -north coast, Egypt ( Bridges)
OWNER: Emaar Misr for development s.a.e
Consultant:ACE consulting Engineers ( Moharram. Bakhoum )
Contractor:TURNER international middle east
ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
2 -Project:CONTINUE ASSUIT CEMENT PLANT (BMIC CEMENT PLANT).1.5 MILLION TON ANNUAL
Owner:CEMENT PLAN BMIC
Consultant: ASEC HOLDING.
Contractor: ARESCO ASEC for Manufacturing & Industrial Projects
PROJECT: ASSUIT CEMENT PLANT (BMIC CEMENT PLANT) .1.5 MILLION TON
Owner : BMIC CEMENT PLANT
.
CONSULTANT: ASEC HOLDING
CONTRACTOR: ARESCO ASEC for Manufacturing & Industrial Projects
____________________________________
PROJECT : TITAN (BENI SUEF CEMENT PLANT) . 4000 TPD line II
-OWNER : LAFARGE TITAN CEMENT.
CONSULTANT : FIVES FCB CPT “Cement Process Technology.
CONTRACTOR : ESACO for manufacturing, contracting
_______________________________________
3- PROJECT : WNCC (WADI EL NILE CEMENT 6000 TPD line I
•OWNER : WADI EL NILE CEMENT COMPANY. CONSULTANT :RHI “Reliance heavy industries” .
•CONTRACTOR : ESACO for manufacturing, engineering and contracting.
_______________________________________
4- PROJECT : SINA WHITE CEMENT 5000 TPD LINE II
OWNER : SINA CEMENT CO.
•RHI Reliance heavy industries”.
• CONTRACTOR: ESACO for manufacturing, engineering and contracting.
Project: City Center Towers Doha.
Owner : AlFAISAL HOLDING CO.
• CONSULTANT: EHAF FOR CONSULTING ENGINE .
•CONTRACTOR: Al Habtoor Engineering Projects
1- Work at Alexandria Mineral Oils Company (AMOC ).
• Build and renovate the existing road network within the plant the first phase and the work misguidance wait internal and external company.
• Work the required adjustments and processing area tanks Created soda tanks.
• Maintenance and renovation of a building company foster wheeler inside the plant.
• The establishment of the outer wall for the fifty _acre fitted to plant equipment
2- Alexandria Company for refining and petrochemicals (ANRPC).
• Construction and work for the maintenance of the drainage system and rain streams inside the plant.
• Processing and work paving roads outer area and in front of the factory gates.
3- Al-Nasr cardboard in the Burj Al Arab Industrial Zone
• Construction and paving of the roads network and the required adjustments and drainage network and rain streams inside the plant.
4- General Nile Company for Constructions
• Construction and create a traffic point in the desert road ( cairo _ Alexandria) 92 k and make a full finishes works and fully processed and delivered to the main contractor .
60%
College Degree: License Degree in Arts-Survey Department (2004)
URL removed due to policy violation. Please contact support for further information.