Construction Manager
Dodsal Engineering and Construction Pte Ltd
Total years of experience :24 years, 0 Months
A highly accomplished and dynamic Project Management and
Construction Management professional with a successful career spanning 18 years,
managing diverse functions like Construction works, Project Executions, QA&QC, Site
Inspections, HSE practices, Site Coordination. Currently associated with Dodsal
Engineering and Construction Pte Ltd (UAE) spearheading functions in the Construction
Manager, Client (Abu Dhabi Company for Onshore Oil Operation (ADCO)
Habshan -Maqta -Taweelah Gas Pipeline Project. (Onshore)
Inter Refinery Pipeline Project (IRP-2) (Onshore Project)
Asab lean Gas Pipeline Project. (Onshore)
Replacement of NGL Pipelines Network Project. (Onshore)
Doha Urban Pipeline Relocation Project, (Onshore)
Client: Qatar Petroleum Engineering Department.
TPI: Velosi Certification LLC,
Engineering Consultants: Middle East Tebodin
Project Details : Laying of MPL gas pipeline network 8” 12’’&36’’, construction of valve
station, Control room building, MCC generator room, Air compressor building, Anchor
Block, Closed Vessel drain Pit, Impact wall, High security Fencing work, Heavy earth fill
for terminals and Pipelines, Infrastructure development work for Terminals, Jib Crane
foundations, Pre cast activities for Pipe support and Sleepers .
Baladia Onaiza Kingdom of Saudi Arabia
Construction of Lean Concrete Base Course, Portland cement
Concrete pavement and Asphalt Pavement.
Job Responsibilities Handled
• Supervision of work according to project - technical scope of work with applicable
codes and industries standards such as SASO, American Standard and BS
• Reviewing projects, drawings, documents and specifications to ensure the scope of
works and contract requirements.
• Responsible to check the reinforcement details precast elements.
• Updating of test reports on daily/weekly/monthly basis and visual inspection of project
materials.
• Conducting and testing of soils, Aggregates, Asphalts and all other construction
materials.
• A complete responsible and witness of all testing of soil, concrete, bitumen and mix
design etc as per MORCEL, ASTM and BS Standards.
• Calibration of measuring and testing equipments such as cube testing machine,
batching plant, weigh balance etc as per approved standard specifications.
• Major responsibilities are making monthly testing schedule, monitoring daily
progress, planning of constructional material
Chennai - Trichy- Madurai -Sangagiri Pipeline Project
Sourashtra branch Canal Pumping Scheme Project, Gujarat
Metro pollution City sewage pipeline Treatment,
Client: M.P.P.W.D,
Job Responsibilities Handled
• Construction of pumping main station, Control Building at ICE House.
• Layout given for various type of manholes and Pipeline alignments,
• Construction of main pumping hole and checking the pipe invert level as per
drawings.
• Co- ordinate with clients and sub contractors
• Preparation monthly programmed and progress report.
• Given the Steel structural measurement as per approved drawings.
TPI: Velosi Ltd
• Project Details - Two (2) Nos. new 52” pipelines from Habshan to Maqta
premises (approx. 125 km.each) with Scraper Launcher, Scraper Receiver
and intermediate Block Valve Stations 6nos.
• One (1) No. new 52” pipeline from Maqta to Taweelah KM42 point (approx. 42
km.) with Scraper Launcher, Scraper Receiver and intermediate Block Valve
Stations 3 nos.
• One (1) No. new (42”) pipeline from Taweelah KM42 point to ADWEC CRS
(approx. 11 km.) with Scraper Launcher and Receiver Stations. Scraper
Consultants and Engineers)
TPI: Moody International.
GS Engineering Scope is Engineering, procurement, Construction works and providing
Commissioning assistance
Project Details (EPC Work) -Hydro carbon pipe lines, Terminals, Pipe rack foundation,
Pipe support, Sub Stations, Control Buildings, Block Valve station along with 16" twin pipe
lines to supply from Ruwais to Abu Dhabi via Mussafah, 10” twin pipeline from Mandina
Zayed to Adnoc pipeline corridor, Fire water tank, oil storage tanks, LBG bullet vessels,
LPG hall building, Industrial Buildings, Fire Shelter foundation, GRE pipeline 4’’& 8 ‘’
(Approximate;8 Km) Expansion of ADIA, Ruwais, Mussafah and Madinazayed Terminals
PMTC: Worley Parsons, Abu Dhabi,
TPI: GL Noble Denton,
Engineering Consultants: Tebbodin Ltd, Abu Dhabi.
Dodsal Scope is Engineering, procurement, Construction works and providing
Commissioning assistance
Project Details (EPC Work) - This Project Covered From Thammama “C” to Asab I / II
Plants for 36 “Pipeline network around 89 km and Lean Gas Compressor Station to Asab II
for 20” pipeline network 7 km. Extension of Thammama c manifold Station, Block Valve
Stations (4 no’s), Extension Asab I and II and Lean Gas Compressor station
PMTC: Engineers India LTd, Abu Dhabi,
TPI: Moody International,
Engineering Consultants: Nama Mott McDonalds, Abu Dhabi.
Project Details: Replacement of NGL pipeline network from ASAB to BAB - 24” line (89
kms), BUHASA to MP21 - 16” LINE (34 kms), RUWAIS to BAB -30” line (110 kms) and
related on plot activities. Construction New valve stations 7nos, Bab manifold, Extension of
MP-21, Buhasa Launcher Area, Ruwais Launcher Area and Asab launcher Area. Laying of
6” GRE pipeline for fire water supply
Job Responsibilities Handled
• Construction of Diesel storage tanks, closed drain vessel, Control valve station,
pipeline pedestal, thrust blocks, minor structure of river crossing and road crossing.
• Reviewing projects, drawings, documents and specifications to ensure the scope of
works and contract requirements.
• Preparation of bar bending and form works details as per drawings.
Job Responsibilities Handled
• Construction of Pumping station (3 and 4) involves 7000 cum of concrete and 3000
Attested by India and UAE Government
Duly attested by India and UAE Government.