karunesh kumar, Electrical Consultant

karunesh kumar

Electrical Consultant

Air liquide

Lieu
Inde - New Delhi
Expérience
19 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :19 years, 11 Mois

Electrical Consultant à Air liquide
  • Inde - New Delhi
  • Je travaille ici depuis août 2019

Working as Electrical Design Engineer for Liquid Hydrogen Plant in Las Vegas, Nevada.
Job includes design for electrical system for Power Distribution system, MV & LV switchgear, Cable sizing, Layouts, MTO preparation, Vendor drawing review for electrical packages.

à Bechtel India Pvt. Ltd. (Through Sarvatara Integrated Management Services)
  • juillet 2016 à novembre 2018

Worked in Bechtel through Sarvatara Integrated Management Services and responsibility included:
ALBA Line 6, Bahrain: Started with FEED engineering and converted to detailed engineering.
•Preparation and finalization of SLD, typical schematic diagrams
•Design criteria
•Material requisition for MV & LV switchgear, Power and distribution transformer, MV & LV cable, DC & UPS systems
•Service requisition for HV electrical & instrumentation work for plant wide area.
•Rectiformer package and responsible for all its auxiliaries.

BP West Nile Delta Project, Alexandria, Eygpt: Job responsibility included:
•Walkdown for electrical system and punchlist preparation and closure.
•Turnover/completion to Client
•Checking of electrical ITR’s.
•Supervision of construction activities

à SKE&C
  • Inde
  • décembre 2010 à mars 2016

KOC Elevated Substation, Kuwait: Deputed to Seoul for one year and worked for KOC Elevated Substation work which is having 30 new substations and also includes revamping work.
•Preparation of Single line diagrams
•Electrical Design Criteria
•Electrical installation details
•Material Requisition for HV, LV Switchgear, Transformers, Diesel Generator sets and DC system.
•Substation Layouts
•Short circuit, load flow & Motor Starting calculations using ETAP software
•MV & LV cable sizing
•Cable schedule
•Earthing calculations
•DC & UPS sizing
•Vendor print review of transformers, MV & LV switchgear.
•Coordination with Client and interaction with Client’s consultant for approval of design related documents.


ISPRL Padur, Mangalore (Proposal Work):
•Preparation of Material Requisition for all the Electrical equipment
•110 kV Switchyard & Transmission Line
•Bill of Material
•Technical Bid Evaluation of all the Electrical Packages, Cable Schedule, Coordination with Vendors.

Hanam 450 MW CHP, Korea:
•Preparation of SLD, metering & Protection Diagrams
•Material Requisition for MV Switchgear, LV Switchgear. Review of Vendor prints and squad check for mechanical packages.
•Preparation of power & control cable connections
•Supervision of 3D Modeling work.

Fort Hills Secondary Extraction (Suncor), Canada :
•Checked Lighting & Grounding Layout drawings w.r.t 3D Model using Navisworks
• Review of cable Schedule for EHT area.

Other works included Proposal for Power plants and coordination with Seoul Office for different power projects and proposal work

à IDOM
  • Espagne
  • décembre 2008 à novembre 2010

Banglore deputed to Madrid, Spain and worked for IDOM on Thermosolar power plant of 50 MW in Granada, spain. Job responsibility included design of complete power plant electrics.
•Single line diagram,
•Generator Metering & Protection diagram
•MV & LV metering & protection diagram
•Specifications and data sheets for transformers, 220kV GIS(Gas Insulated Substation), Variable Frequency Drives, DC and UPS system, motors, MV and LV switchgear.
•Schematic diagrams
•Cables sizing calculation.
•Vendor drawing review for the complete electrical system
•Technical Bid evaluation for the different packages
•Layout for electrical rooms
•DG set specification and sizing

à Alstom Projects India Limited
  • Etats Unis
  • mars 2007 à décembre 2008

360 MW Combined cycle power plant in Utran district of Gujrat.
•Finalization of SLD
•Specification and data sheets for all the electrical equipments
•Metering & Protection diagram
•Vendor drawing review
•Calculation for earthing, battery sizing and other components,
•Design and responsible engineer for complete LV switchgear which included complete design, manufacturing and testing
•Deputed to Utran site for supervision of Electrical activities during commissioning.

27/02/06 - 29.03.07 : Bechtel India Private Limited

Elm Road Power Generating Station (2x615 MW)

  • mars 2005 à février 2006

TCE Consulting Engineers

Worked for Gujrat Ambuja (100 MW) in Gujrat and 30 MW captive power plant for TATA Steel. Job involved complete power plant design i.e SLD, specification and data sheets for all the electrical equipments, protection, vendor drawing review, schemes, calculation for earthing, battery sizing and other components, short circuit sizing, Load flow studies on ETAP.
Also deputed at site as precommisioning engineer for the 30 MW power plant. Job involved checking of control schemes from MCC end and DCS, supervision activities for insulation resistance test, dielectric test, secondary injection test etc

à Mecon Limited
  • Inde
  • juillet 2002 à février 2005

Worked for steel plants and assisted my senior in the design of power plant electrics i.e SLD, specification and data sheets for all the electrical equipments, protection, vendor drawing review, schemes, calculation for earthing, battery sizing and other components

Specialties & Skills

CABLING
CONSULTING
SUPERVISORY SKILLS
3D MODELING
CUSTOMER RELATIONS
GRAPHIC DESIGN
LAYOUT DESIGN
LIGHTING

Langues

Anglais
Expert
Hindi
Expert
Espagnol
Expert