Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Kaveh Hezaveh, Senior Production Engineer

Kaveh Hezaveh

Senior Production Engineer·Iranian Offshore Oil Company (IOOC)

Iran

Master's degree, Advanced Chemical Engineering

Work experience

Total years of experience: 20 years, 0 months

Senior Production Engineer

June 2013 - Present

Iranian Offshore Oil Company (IOOC)

Iran

June 2013 - Present

- Supervising and conducting the production engineering activities for oil wells stimulation and productivity condition improving e.g acid job, acid wash, nitrogen lift, ....
- Analyzing diversity kinds of data e.g. production test, pressure test survey (build-up, static, flowing) using Metrowin. Monitoring ESP daily condition report to predict or/and improve the production ability of wells and designing some plans to get reach the targets compatible with company production policies and based on comparing predicted vs. actual rates, water cuts, GORs and pressures. Use these to identify possible problems or bottlenecks and advise some practical solutions.
- Observing the daily well's inspection report and make needed activities to maintain the wells productivity on the best efficiency point.
- Recording the production data and preparing back allocation for each well, keep the database update and perform medium/long term decline analysis and forecasting.
- Performing the calculation and criteria analysis of pipeline design and selection using appropriate software and calculator besides of design and advise using correct flow meter equipment and calibrating transmitters.
- Selection and recommending for improving the pump performance especially focused on centrifugal ones, design and order brand new pumps according to projects needs and their future horizons getting help of performance curve and related softwares.
- Making PFD and P&ID drawings and doing corrections and get updating the drawings to be as-built versions.

Company industry:
Oil & Gas
Job role:
Engineering

Production & HSE Supervisor (Shift Controller)

July 2009 - June 2013

Iranian Offshore Oil Company (IOOC)

Iran

July 2009 - June 2013

BAHREGANSAR Offshore Oil Production Platform

- Supervising board men & power technicians for controlling all units (separation, crude oil stripping, exporting), processes and utilities, gas turbo generators… and conducting them in necessary situations to control the process.
- Reporting the mechanical and rotary equipment conditions to OIM (Offshore Installation Manager) for maintenance planning.
- Monitoring oil production rates and reporting to OIM and OFM (Offshore Field Manager) daily.
- Analyzing of oil wells status, documentation of laboratory results and preparing the comparison charts, BS&W and GOR trends, monitoring and preparing the analytic graphs and reports for OIM and OFM.
- Planning for daily and weekly visits of satellite wells by well service guys and maintenance programs if it is necessary.
- Supervising on permits issuing, morning HSE meetings and coordinates the sections for site-preparing activities before maintenance jobs.
- Observing and training the site men to prepare them for unexpected shut-down conditions and routine hourly/daily operational duties.
- Preparing the daily reports mainly included the production rate, rotary and mechanical equipment condition, PMR progress... for installation & field manager.

In 2011 we had involved to some challenges in BAHREGANSAR offshore complex due to BS&W and sand production mainly lead to export booster pumps failure. After some investigations and days discussion with co-workers in the plant, we decided acting in two different ways:
- Reducing the source of casualty that involved separation more brine in three-phase separators. Besides of operational improvements, redesign the separator internal focused on weir had considered. Neccessary calculations and maintenance hard workings made it successful.
- Injection a kind of chemical to inhibit producing scales in pumps' casing and therefore their failure. Some kind of sea water scale inhibitor with specified dozen selected.
Now our novel method works very well and the problem already disappears.

Company industry:
Oil & Gas
Job role:
Engineering

CRO (Control Room Operator)

May 2007 - July 2009

Iranian Offshore Oil Company (IOOC)

Iran

May 2007 - July 2009

BAHREGANSAR Offshore Oil Production Platform

- Membership in pre-commissioning and commissioning team for starting up the new installation facilities (OSBL) included three phase separators, bubble cap tray stripper columns, gas turbo generators (GTG), fuel gas compressors, export booster pumps, RO water maker plant ….
- As a CRO, controlling and monitoring all systems and units, process, utilities, power plant (gas turbines), HVAC, and solving any process problems happened during production and starting up again the plant after its probable shut-downs.
- Daily controlling the productive wells status in cooperation with outside operator and well service guys and report it to shift controllers (production heads),
- Monthly wells’ test to determine their productive status and phases condition.

Company industry:
Oil & Gas
Job role:
Engineering

Area Authority (Out-site Operator)

June 2006 - May 2007

Iranian Offshore Oil Company (IOOC)

Iran

June 2006 - May 2007

SOROOSH & NOWRUZ Integrated Offshore Field

- Site-check of all units, process and utility, chemical injection, hourly logging all rotary and mechanical equipment (pumps, compressors, reverse osmosis units, separators & de-salters, heat ex-changers).
- Site-starting up activities after shut-downs, daily controlling the productive wells status and report it to control room and monthly preparation of test separator for well testing procedure.

Company industry:
Oil & Gas
Job role:
Engineering

Education

Amirkabir University of Technology (Tehran Polytechnic)

September 2012

September 2012

Master's degree, Advanced Chemical Engineering

Iran

GPA (point): 17.17 out of 20

GPA (point): 17.17 out of 20

Final Project: Field H2S removal from crude oil using gas stripping process and study of effective variables. Supervisor: Prof. Habib Ale-Ebrahim http://www.chinarefining.com/EN/Y2013/V15/I1/78

AZAD University (Tehran-South Branch)

September 2003

September 2003

Bachelor's degree, Chemical Engineering - Petroleum Industry Processes Design

Iran

GPA (point): 15.84 out of 20

GPA (point): 15.84 out of 20

Final Project: Spinel Ceramics; Production and Applications. Supervisor: Dr. Leyla Torkian

Skills

Production
Expert
Production
Expert
Engineering
Expert
Engineering
Expert
CRO
Expert
CRO
Expert
Chemical
Expert
Chemical
Expert
Chemical Engineering
Expert
Chemical Engineering
Expert
Microsoft Office
Expert
Microsoft Office
Expert
Microsoft Windows
Expert
Microsoft Windows
Expert
PipeSim
Expert
PipeSim
Expert
Aspen Hysys
Expert
Aspen Hysys
Expert
Production
Expert
Production
Expert
Engineering
Expert
Engineering
Expert
CRO
Expert
CRO
Expert
Chemical
Expert
Chemical
Expert
Chemical Engineering
Expert
Chemical Engineering
Expert

Languages

English

Expert

Persian

Native Speaker

Training and Certifications

Certifications
Asphaltenes & Wax in oil industry
RIPI (Research Institute of Petroleum Industry)
Nov 2013 - Dec 2013
PSM (Process Safety Management)
IOOC (Iranian Offshore Oil Company)
Dec 2013 - Dec 2013
Pipeline pigging in oil industry
Pars-Hydrocarbon - BOC, Iran
Sep 2007 - Sep 2007
Worthington pumps type 4-UXH 104L and 4-UXH 105L
Worthington S.p.a. pump division - Kish island, Iran
Mar 2008 - Mar 2008
Basic, structure, documentation & auditing of health, safety and environmental management system, HS
TÜV Academy - Tehran, Iran
May 2010 - May 2010
PIPESIM (Schlemberger® Pipe-Line simulator software)
FARAGOSTARAN institute - Kish island, Iran
Dec 2008 - Dec 2008
CENTUM CS 3000 R3
YME (YOKOGAWA Middle-East) - Tehran, Iran
Sep 2007 - Oct 2007

Hobbies and interests

Music