Kenneth McDonald, Instrument Engineer

Kenneth McDonald

Instrument Engineer

2017 EDG

Location
Australia
Education
Master's degree, Industrial Robotics
Experience
29 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 1 Months

Instrument Engineer at 2017 EDG
  • Australia
  • October 2017 to December 2017

Verification of Instrument datasheets by cross checking against all information available through documentum and Engineering portal, Work carried out in Perth office for Chevrons Gorgon Project. SIL rated instruments checked with greater rigour. Level and flow calculations performed from process information and deviations flagged back to site for investigation.

Functional Safety and Hazop Knowledge specialist at 2015 SKM Jacobs
  • Australia
  • April 2014 to January 2015

Controls and Instrumentation. Revalidation of the risks associated with instrument protective functions. Attended Process Hazard Assessment workshops for the Gorgon Barrow Island LNG project. Site visit to assess and report AS61511 roll out status. Presented as found status to site management and proposed remediation works to comply with AS61511.

Project Management Consultant at PetroVietnam, Worley Parsons
  • February 2011 to July 2011

Member of project management consultancy services team providing PMC services for automation design and construction of a polyester plant.
•Liaising between the designer (Hyundai) and the Client (Petro-Vietnam) in the role of client representative.
•Plant walk-rounds and final QC on instrumentation and control systems. Final sign off stages on control and safety systems through commissioning and handover.
•Provided safety, control and instrumentation expertise as required for construction issues

Project Engineer at Chevron Gorgon Projec
  • Australia
  • July 2010 to December 2010

Providing project and detailed Engineering design for the Gorgon Project, water treatment plant infrastructure.
•Responsibility for the integration of major control systems provided by three separate teams to culminating in FAT and SAT to ensure the systems worked together.
•Responsible for the co-ordination of the design schedule and design tasks and also direction of the design of the safety shut down systems.

Project Engineer at Petro-Vietnam Bio-Ethanol project WorleyParsons
  • March 2010 to June 2010

Member of project management consultancy services team for Petro-Vietnams bio-ethanol project.
•Worked between design offices in Pune India and Hanoi Vietnam.
•Provided expertise on project sequencing, technical input and quality.
•Provided system for non conformance reporting for procured items and for site installed systems, produced and managed system for tracking these NCRs. Signed off NCR issues.
•Also provided guidance on implementation of AS 61508 safety system implementation and vendor selection.

Control Systems Engineer at WorleyParsons
  • Egypt
  • January 2009 to November 2009

Principal instrument and control systems engineer responsible for EMS rollout, technical leadership and quality control on all projects in the Egypt office.
•Design of control and communication systems for Safety Instrumented Systems on a range of Greenfield and brownfield oil and gas facilities.
•Attended HAZOPs and LOPA reviews, set SIL targets and maintenance requirements.
•Set up training for WorleyParsons systems (EMS). Elected as mentor for WP’s Graduate Training Program.
•Set up framework for training systems for technical competency, evaluation and improvement across all departments including AS61508 and AS61511 requirements.

Project Engineer at Woodside NW Shelf oil and gas assets, Xodus
  • United Arab Emirates
  • July 2007 to September 2008

Safety Systems

•Writing performance standards for safety systems for Woodside NWS oil and gas assets.
•Setting standards and aligning safety case standards across all Woodside’s offshore and onshore facilities.
•Practical review of SIL classifications for environmental analysers.

Controls Engineer
  • Australia
  • August 2006 to June 2007

Responsible for the planning, engineering and procurement of the instrument and controls component for an A$130 million waste water upgrade project.
•Specified and procured the equipment, vendor progress and quality, site inspections carried; out equipment comparison to specification and exception reporting and change impact mitigations implemented.
•Managed alterations to specifications at commissioning stage
•Managing a team of four engineers with direct control of sub-contractors and sub consultants.

Controls Engineer at PMP
  • Ghana
  • August 2005 to July 2006

Responsible for hiring, building and training, a team of four engineers and 20 technicians working as pre-operations/ commissioning team on a Greenfield gold mine construction project for Newmont Ghana Gold.
•Included 4, 500 instrument and control points; planning of manning and resources; creation of workflow systems and liaising with construction crews to ensure coordinated installation and commissioning using

Design Manager at Serck Controls
  • Australia
  • April 2004 to July 2005

Alliance contract with Water Corporation creation and roll out of standard designs for telemetry and wide area SCADA control and WAN and LAN monitoring throughout Western Australia, where I was the client representative to the water corporation for control systems.
•Responsible for team of 17 engineers and all aspects of design and costing and budget through to installation and commissioning.
•Organised client and vendor liaison meetings

Control Systems Engineer at Western Power (Renewable Energy)
  • Australia
  • January 2003 to April 2004

Responsible for the design and installation of instrumentation and control (safety and process) systems; writing functional specification and ensuring overall plant design conforms to Australian standards; design registrations.
•Ensured AS61508 compliance with 1996 OSH regulations for the design of a prototype biomass gas burning renewable 1MW energy plant. Designed all instrumentation systems and became the client interface to the construction company.
•Creation of datasheets for the procurement of instrumentation equipment, verified correct specifications of equipment installed. Involved in commissioning plant through startup.

Controls Engineer at Halliburton KBR
  • Australia
  • July 2002 to December 2002

Feasibility study for the tender for expansion work for a nickel ore mine in North Western Australia, using documentum

Controls Engineer at Benchamas Project, Worley Engineering
  • United Arab Emirates
  • April 2001 to July 2002

Design and Engineering interfaces for various package control systems to oil and gas platform control and shutdown system. Wrote control narratives for burner management system for integration into the Yokogawa system. Specified SIL level and redundancy required and attended HAZOP
•Software and hardware design specification written; detailed design of instrumentation.

Controls Engineer at Clough Engineering
  • Australia
  • March 2000 to April 2001

Responsible for the design, specification and procurement of instrumentation systems for the Woodman Point waste water treatment plant upgrade.
•Wrote the Delta V DCS system specification, for Wesfarmers LPG Refinery plant expansion and designed the instrumentation systems

Project Manager at PMC: Saudi Aramco
  • Saudi Arabia
  • January 1999 to December 1999

Responsible for the planning, testing reporting and remediation of Armco’s Y2K project as the clients representative.
•This covered 18 Oil production facilities (refineries, pipelines, distribution etc.) across Saudi Arabia; co-ordination and technical direction of team of six Engineering teams across Saudi Arabia and Liaison with Aramco Management; control of $17 million budget for remediation of Instrumentation and Process Control systems.

Principal at Siemens Microelectronics
  • United Kingdom
  • November 1995 to December 1998

Siemens interface to Mac Alpines during construction of £1.4 billion microelectronics semiconductor wafer fabrication plant.
•Responsible for specifying installing and commissioning control systems.
•Moved into operation, maintenance and upgrade phases with an annual operations budget of £750, 000.
•Also responsible for specification and implementation for control of chemical and gas shutdown systems - phosphine, silane and fluorine.
•Programmed and network administered Unix based Bailey System 6 DCS and Siemens S5 and S7 PLCs.

Systems Engineer at Motorola,
  • United Kingdom
  • June 1994 to November 1995

Successfully designed, prototyped, installed and implemented vision inspection systems across production lines for final visual functional testing / inspection and statistical analysis of mobile phones coming off production lines.

Software Design Engineer at GemCo Limited
  • Australia
  • January 1994 to May 1994

Designed a Modicon PLC interfaced radio control system to automatically and remotely control five diesel electric locomotives pulling 200, 000 ton mass of iron ore, for loading terminal at Paraburdoo Iron Ore mine, North West Australia. Wrote control narrative.

Support Engineer at Woodside/Shell Pty Ltd, Karrath
  • Australia
  • July 1992 to January 1994

Providing Engineering support on platform instrument & control systems on North Rankin “A” gas production platform.
•Triple redundant fire and gas shutdown (GP Elliot), RB211 gas turbine & Dresser Instrumentation control system. Led and successfully planned shutdowns and supervised controls projects offshore.

Systems Design Engineer at BHP Engineering
  • Australia
  • July 1991 to July 1992

Successfully specified upgrade work on fire and safety systems at BHP Iron Ore mine site.
•Also designed installed and commissioned a combined telemetry -PLC control and monitoring system for a water supply system consisting of eight pump sites

Trainer at Argyle Diamond Mine, Kununurr
  • Australia
  • August 1990 to June 1991

Contracted to write a technical training package system for Argyle diamonds mine for Allen Bradley PLC5-250 Control system.
•Training courses conducted on site for technical personnel involved instruction on how to program and system fault-finding.

Systems Engineer at Electronic Automation Ltd
  • United Kingdom
  • January 1989 to July 1990

Contract for design and programming of computer vision systems for the measurement, inspection, identification and rejection of faulty components in real time, mass production manufacturing environments, programmed in assembler language using triple parallel 68030

Technician at North sea oil and gas platforms, AOCI/ Woodgroup
  • United Arab Emirates
  • April 1983 to June 1986

up, calibration, installation and inspection; fire & gas, system maintenance;
•Total MCP01; wellhead instrumentation shutdown system maintenance;
•Hydrocarbons Great Britain; commissioning of Morecambe Bay offshore gas platforms shutdown control systems;
•BP - Magnus, instrument and controls maintenance on Fire and Gas systems;
•Occidental Claymore platform; Refit after Piper Alpha event forced field shutdown
•St. Fergus (Shell) onshore gas plant, instrumentation control systems inspection and commissioning. Honeywell TDC 2000 system. Responsible for ensuring that installed instrumentation, fire and Gas and shutdown systems conformed to performance standards and specifications, hazardous area inspection. Supervised team of eight technicians.

R&D Engineer at UDI Ltd
  • United Kingdom
  • May 1980 to March 1983

Responsible within a multidiscipline team, for innovation of electronic and electro-hydraulic systems design, sonar, CCTV, communications. Prototype design of a remotely controlled 32 tonne, bottom crawling (SeaBug) robot on tank tracks. This was taken on trials into operation and maintenance of instrument systems.
•The vehicle pioneered the use of robotics in the North Sea oil industry for deep sea diver replacement, carried through to provide operational and Engineering support, trenching pipelines to satellite oil wells on Magnus field.

Safety Engineer at 2015 Chevron Gorgon Barrow Island LNG projec
  • United Arab Emirates
  • June 2015 to
Safety Engineer at CFSE-P
  • to

Produced design verification report using exSILentia from exida.
•Safety system design and 61508 lifecycle for Rio Tinto Iron Ore Cape Lambert port expansion project.
•Advising on design of machine safety systems and checking that systems conform to AS 61508 / 61511 and suitability for independent third party review. LOPA review, SIL selection and HAZOP re-verification.

Education

Master's degree, Industrial Robotics
  • at Cranfield University
  • August 1988
Master's degree, Subsea Engineering unit
  • at University of Western Australi
  • May 1988

courses: Passport to Safety Programme (psychological aspects of safety) •White Card •Advanced Unix Administrator •Elsag Bailey (ABB) symphony and System 6 DCS Basic Intermediate and advanced courses in Philadelphia •Fire & Rescue Team Training •Helicopter Underwater Escape Training •16th edition electrical wiring rules (UK) •EITB Technical Apprenticeship and ONC

High school or equivalent, Subsea Engineering unit
  • at University of Western Australi

courses: Passport to Safety Programme (psychological aspects of safety) •White Card •Advanced Unix Administrator •Elsag Bailey (ABB) symphony and System 6 DCS Basic Intermediate and advanced courses in Philadelphia •Fire & Rescue Team Training •Helicopter Underwater Escape Training •16th edition electrical wiring rules (UK) •EITB Technical Apprenticeship and ONC

Specialties & Skills

BUDGETING
CUSTOMER RELATIONS
DIRECTING
DOCUMENTUM
OIL PAINTING
REPORTS
TELEMETRY
UPGRADES

Languages

French
Expert