Partial discharge testing team leader
Abu Dhabi Distribution Company
مجموع سنوات الخبرة :17 years, 3 أشهر
Online Partial Discharge testing for power cables up to 33 kv
Offline Partial Discharge testing for power cables up to 33 kv
Tan Delta test
Cable fault location
Cable testing 11 & 33 kv, fault location, tracing and identifications
• Installing, testing and energizing distribution substation 11/.415 kv .
• Installing, testing and energizing medium voltage cables 33 and 11 kv .
• Testing with migger and VLF.
• Cable tracing and identification (Power/Pilot cable).
.
• Supervision of cable works, laying, jointing and terminations.
• Cable faults repairs.
• Operation of different switchgears 33 and 11 kv.
- G.P.A: (3.39/4) with rating: very good, the second in my specialization. Practical Training: o N.E.P.Co (National Electric Power Company) Graduating Project: o Corona phenomena on overhead lines.