KHAJA FEROZ JAMAL, Site engineer

KHAJA FEROZ JAMAL

Site engineer

Local contractor

Location
India
Education
Bachelor's degree, Civil engineer
Experience
14 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 5 Months

Site engineer at Local contractor
  • India
  • My current job since January 2016

Handle & managing Interior finishes like, setting out floor & wall tiles, setting out masonry work, block work, wooden & GI roofing, wooden ply ceiling, plastering, painting, roof water proofing with brick bats. Water proofing, fall ceiling, Digging of well & construction of well using 3 feet wide concrete pipe (size of well : 3feet in diameter, 18feet in length). Interior renovation work.

Site engineer at Bajaj Steel Industries uganda limited
  • Uganda
  • August 2015 to December 2015

Read & consider specification of the contract and working drawing, scope of the work before commencement of the work on the construction site..
Request the construction superintendent about the equipments and materials.
Computed the time and resources needed for achieving the targets.
Check the quality of work is carried out as per the contract specifications, best engineering practices, Quality Plan.
Received designs and blueprints of portion of construction to be accomplished from the Design Consultant.
Fully responsible for the work quality and achieved assign activity in the schedule timeline. Supervise the work flow must be as per the construction programme. Ensure the effective work force assigned on the construction site.
Maintain the activity delay record incase bad weather, lack of manpower, lack of material, late transportation of requested material on the project site.
Maintain the record of extra work done on the project site as per the change of drawing or as per the site instruction received from the client engineers. Reporting non-conformities to the project manager.
Maintain the material stock record on the site & trace the material for the future require material & preparing the material requisition on the project.
Co-coordinating with the sub-contractor if any working on the project.
Keeping record of as-build drawing on the work/activity completed on the project & submitting to the higher authority as per the received instruction.
Submitting daily/weekly or monthly activity report to the management or higher authority as per the received instruction.
consider the housekeeping activity on the construction site.
Follow up & ensure the construction program with best engineer practice, quality & technical specification of the executing project.
Maintain the HSE Record with the HSE Officer on the project site & submitting the HSE record report to the higher authority. Discuss regarding the HSE needs & requirement with the HSE Officer & project manager for the manpower safety, project safety.

Site engineer at Local contractor
  • India
  • May 2014 to March 2015

Received designs and blueprints of portion of construction to be accomplished from the Design Consultant.
Ensure Proper Housekeeping & managing manpower at site as per the requirement of the task.
Monitored consistently the actual progress of the assigned tasks.
Continues study and supervision on the project.
Study of technical specification, quantity survey of executed work and finalizing of monthly work done statement.
consider the housekeeping activity on the construction site.
Marking and leveling through line dori with basic trigonometry.
Site supervision and monitor the ongoing activities as per the drawing, ensure the effective manpower assign on the construction site.
.Follow up & record the construction program with best engineer practice, quality & technical specification of the executing project.

Self employed at Self employed
  • India
  • May 2013 to April 2014
Site engineer at Saudi Binladin Group (ABCD)
  • Saudi Arabia - Riyadh
  • March 2010 to November 2012

Led and Monitoring all the finishing activities (excluding MECHANICAL, ELECTRICAL & PLUMBING WORKS) With a team work (team size: 5 site engineer, 5 general foremen, 10 foremen, 300 skills/helpers ).
Handled FINISHING ACTICITIES (INTERIOR DECORATION particularly GYPSUM BOARD CEILING, ACCOUSTIC CEILING, GYPSUM BOARD PARTITION WALL, GYPSUM BOARD CLADDING, PLASTERING, MASONERY WORK, EPOXY PAINT, SCREED CONCRETE etc)
Read & consider specification of the contract and working drawing, scope of the work before commencement of the work on the construction site.
Prepared Bill of Quantity and reporting it to construction manager, cost control department.
Received designs and blueprints of portion of construction to be accomplished from the Design Consultant.
Maintain the material stock record on the site & trace the material for the future require material & preparing the material requisition on the project.
Co-coordinating with the sub-contractor if any working on the project.
Keeping record of as-build drawing on the work/activity completed on the project & submitting to the higher authority as per the received instruction.
Maintain the HSE Record with the HSE Officer on the project site & submitting the HSE record report to the higher authority. Discuss regarding the HSE needs & requirement with the HSE Officer & project manager for the manpower safety, project safety.
consider the housekeeping activity on the construction site.
If any changes on the site by the approval of client engineer prepare the change order, site instruction and informing to the project coordinator, construction manager, cost control department and billing department.
Reporting non-conformities to the project manager
Fully responsible for the work quality and achieved assign activity in the schedule timeline. Supervise the work flow must be as per the construction programme.
Site supervision and monitor the ongoing activities as per the drawing, quality, technical specification on the site. Ensure the effective manpower assign on the construction site.
Check the quality of work is carried out as per the technical specifications, best engineering practices, Quality Plan.
Maintain the activity delay record incase bad weather, lack of manpower, lack of material, late transportation of requested material on the project site.
Co-ordination with the project coordinator and construction manager time to time, work under the project coordinator and project manager.
Maintain the document received by the client site engineer such as, change order, site inspection request approved by the client engineer, etc. for the extra work done.
Co-ordination with the technical team, Billing department, planning engineer on the specific time to time and Submitting daily/weekly or monthly activity report to the management or higher authority as per the received instruction.

Site engineer at Talib & Shamsi construction Pvt Ltd
  • India - Pune
  • March 2009 to March 2010

Site supervision and monitor the ongoing activities as per the drawing, quality, technical specification on the site. Ensure the effective manpower assign on the construction site.
Check the quality of work is carried out as per the technical specifications, best engineering practices, Quality Plan.
Maintain the activity delay record incase bad weather, lack of manpower, lack of material, late transportation of requested material on the project site.
Co-ordination with the project coordinator and construction manager time to time, work under the project coordinator and project manager.
Maintain the document received by the client site engineer such as, change order, site inspection request approved by the client engineer, etc. for the extra work done.
Co-ordination with the technical team, Billing department, planning engineer on the specific time to time and Submitting daily/weekly or monthly activity report to the management or higher authority as per the received instruction.
Checking the Mivan & commercial formwork on the site as per the Approved drawing

Education

Bachelor's degree, Civil engineer
  • at Khaja Banda Nawaz College of engineering
  • January 2009

Specialties & Skills

Finishing
On Site
Commercial awareness – an understanding of how your actions can affect profitability of a project Te

Languages

English
Intermediate
Arabic
Beginner
Urdu
Expert

Memberships

The institution of engineers of india
  • AM162967-3
  • February 2016