KHAJA FEROZ JAMAL جمال, Site engineer

KHAJA FEROZ JAMAL جمال

Site engineer

Local contractor

البلد
الهند
التعليم
بكالوريوس, Civil engineer
الخبرات
14 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 6 أشهر

Site engineer في Local contractor
  • الهند
  • أشغل هذه الوظيفة منذ يناير 2016

Handle & managing Interior finishes like, setting out floor & wall tiles, setting out masonry work, block work, wooden & GI roofing, wooden ply ceiling, plastering, painting, roof water proofing with brick bats. Water proofing, fall ceiling, Digging of well & construction of well using 3 feet wide concrete pipe (size of well : 3feet in diameter, 18feet in length). Interior renovation work.

Site engineer في Bajaj Steel Industries uganda limited
  • اوغندا
  • أغسطس 2015 إلى ديسمبر 2015

Read & consider specification of the contract and working drawing, scope of the work before commencement of the work on the construction site..
Request the construction superintendent about the equipments and materials.
Computed the time and resources needed for achieving the targets.
Check the quality of work is carried out as per the contract specifications, best engineering practices, Quality Plan.
Received designs and blueprints of portion of construction to be accomplished from the Design Consultant.
Fully responsible for the work quality and achieved assign activity in the schedule timeline. Supervise the work flow must be as per the construction programme. Ensure the effective work force assigned on the construction site.
Maintain the activity delay record incase bad weather, lack of manpower, lack of material, late transportation of requested material on the project site.
Maintain the record of extra work done on the project site as per the change of drawing or as per the site instruction received from the client engineers. Reporting non-conformities to the project manager.
Maintain the material stock record on the site & trace the material for the future require material & preparing the material requisition on the project.
Co-coordinating with the sub-contractor if any working on the project.
Keeping record of as-build drawing on the work/activity completed on the project & submitting to the higher authority as per the received instruction.
Submitting daily/weekly or monthly activity report to the management or higher authority as per the received instruction.
consider the housekeeping activity on the construction site.
Follow up & ensure the construction program with best engineer practice, quality & technical specification of the executing project.
Maintain the HSE Record with the HSE Officer on the project site & submitting the HSE record report to the higher authority. Discuss regarding the HSE needs & requirement with the HSE Officer & project manager for the manpower safety, project safety.

Site engineer في Local contractor
  • الهند
  • مايو 2014 إلى مارس 2015

Received designs and blueprints of portion of construction to be accomplished from the Design Consultant.
Ensure Proper Housekeeping & managing manpower at site as per the requirement of the task.
Monitored consistently the actual progress of the assigned tasks.
Continues study and supervision on the project.
Study of technical specification, quantity survey of executed work and finalizing of monthly work done statement.
consider the housekeeping activity on the construction site.
Marking and leveling through line dori with basic trigonometry.
Site supervision and monitor the ongoing activities as per the drawing, ensure the effective manpower assign on the construction site.
.Follow up & record the construction program with best engineer practice, quality & technical specification of the executing project.

Self employed في Self employed
  • الهند
  • مايو 2013 إلى أبريل 2014
Site engineer في Saudi Binladin Group (ABCD)
  • المملكة العربية السعودية - الرياض
  • مارس 2010 إلى نوفمبر 2012

Led and Monitoring all the finishing activities (excluding MECHANICAL, ELECTRICAL & PLUMBING WORKS) With a team work (team size: 5 site engineer, 5 general foremen, 10 foremen, 300 skills/helpers ).
Handled FINISHING ACTICITIES (INTERIOR DECORATION particularly GYPSUM BOARD CEILING, ACCOUSTIC CEILING, GYPSUM BOARD PARTITION WALL, GYPSUM BOARD CLADDING, PLASTERING, MASONERY WORK, EPOXY PAINT, SCREED CONCRETE etc)
Read & consider specification of the contract and working drawing, scope of the work before commencement of the work on the construction site.
Prepared Bill of Quantity and reporting it to construction manager, cost control department.
Received designs and blueprints of portion of construction to be accomplished from the Design Consultant.
Maintain the material stock record on the site & trace the material for the future require material & preparing the material requisition on the project.
Co-coordinating with the sub-contractor if any working on the project.
Keeping record of as-build drawing on the work/activity completed on the project & submitting to the higher authority as per the received instruction.
Maintain the HSE Record with the HSE Officer on the project site & submitting the HSE record report to the higher authority. Discuss regarding the HSE needs & requirement with the HSE Officer & project manager for the manpower safety, project safety.
consider the housekeeping activity on the construction site.
If any changes on the site by the approval of client engineer prepare the change order, site instruction and informing to the project coordinator, construction manager, cost control department and billing department.
Reporting non-conformities to the project manager
Fully responsible for the work quality and achieved assign activity in the schedule timeline. Supervise the work flow must be as per the construction programme.
Site supervision and monitor the ongoing activities as per the drawing, quality, technical specification on the site. Ensure the effective manpower assign on the construction site.
Check the quality of work is carried out as per the technical specifications, best engineering practices, Quality Plan.
Maintain the activity delay record incase bad weather, lack of manpower, lack of material, late transportation of requested material on the project site.
Co-ordination with the project coordinator and construction manager time to time, work under the project coordinator and project manager.
Maintain the document received by the client site engineer such as, change order, site inspection request approved by the client engineer, etc. for the extra work done.
Co-ordination with the technical team, Billing department, planning engineer on the specific time to time and Submitting daily/weekly or monthly activity report to the management or higher authority as per the received instruction.

Site engineer في Talib & Shamsi construction Pvt Ltd
  • الهند - بونة
  • مارس 2009 إلى مارس 2010

Site supervision and monitor the ongoing activities as per the drawing, quality, technical specification on the site. Ensure the effective manpower assign on the construction site.
Check the quality of work is carried out as per the technical specifications, best engineering practices, Quality Plan.
Maintain the activity delay record incase bad weather, lack of manpower, lack of material, late transportation of requested material on the project site.
Co-ordination with the project coordinator and construction manager time to time, work under the project coordinator and project manager.
Maintain the document received by the client site engineer such as, change order, site inspection request approved by the client engineer, etc. for the extra work done.
Co-ordination with the technical team, Billing department, planning engineer on the specific time to time and Submitting daily/weekly or monthly activity report to the management or higher authority as per the received instruction.
Checking the Mivan & commercial formwork on the site as per the Approved drawing

الخلفية التعليمية

بكالوريوس, Civil engineer
  • في Khaja Banda Nawaz College of engineering
  • يناير 2009

Specialties & Skills

Finishing
On Site
Commercial awareness – an understanding of how your actions can affect profitability of a project Te

اللغات

الانجليزية
متوسط
العربية
مبتدئ
الأوردو
متمرّس

العضويات

The institution of engineers of india
  • AM162967-3
  • February 2016