Project Engineer - Qatar Power Transmission System Expansion - Projects (GTC
MITSUBISHI CORPORATION
Total years of experience :11 years, 0 Months
Engineering
Degree: B.Sc. of Engineering
Major: Electrical Power and Machines
Project: Standalone Photovoltaic Power System
Company: MITSUBISHI CORPORATION - Qatar (December 2005 to June 2013)
Position: Project Engineer - Qatar Power Transmission System Expansion - Projects (GTC-241B & GTC-240A) 132kV/220kV/400kV Cables
RESPONSIBILITIES: - Responsible for communicating with the clients and consultants.
- Responsible for schedules of project development.
- Coordinates activities concerned with technical developments, scheduling, and resolving engineering design and test problems.
- Coordinates team activities and communicates project status through technical reports.
- Managing Projects from conception, pre-production through completion.
- Responsible for the completion of all documentation.
- Managing project budget and keeping costs to its minimum.
- Producing the site activities program and the progress reports.
- Responsible and accountable to ensure that all assigned personnel are coordinating their activities with other project participants and that the requirements of the Contract are being satisfied.
Position: Site Engineer - Qatar Power Transmission System Expansion - Projects (GTC-5 GTC 22 & GTC-142G) 132kV/220kV/400kV Cables
RESPONSIBILITIES: - Obtain the project permits from authorities.
- Supervising the site surveying works.
- Review and follow up the site drawings.
- Responsible for studying the drawings received from Authorities in order to expose the existing underground utilities.
- Managing and supervising the subcontractor's site works (Trenching -construction of the joint bays, road crossings and manholes)
- Arranging and attending all the site's inspections from both sides (consultant side and the client side)
- Handling and supervising cable pulling, jointing and termination works activities.
- Holding all the required client (KAHRAMAA-Qatar) permits to work inside the electrical substations.
- Coordinating and arranging for the electrical and high voltage tests for the installed circuits.
- Responsible for checking all the re-instatement works in order to get the site clearances.
PROFESSIONAL EXPERIENCE:
Company : MITSUBISHI CORPORATION - Qatar (December 2005 to June 2013)
Position : Project Engineer - Qatar Power Transmission System Expansion - Projects (GTC-241B & GTC-240A) 132kV/220kV/400kV Cables
RESPONSIBILITIES:
- Responsible for communicating with the clients and consultants.
- Responsible for schedules of project development.
- Coordinates activities concerned with technical developments, scheduling, and resolving engineering design and test problems.
- Coordinates team activities and communicates project status through technical reports.
- Managing Projects from conception, pre-production through completion.
- Responsible for the completion of all documentation.
- Managing project budget and keeping costs to its minimum.
- Producing the site activities program and the progress reports.
- Responsible and accountable to ensure that all assigned personnel are coordinating their activities with other project participants and that the requirements of the Contract are being satisfied.
Position : Site Engineer - Qatar Power Transmission System Expansion - Projects (GTC-5 GTC-22 & GTC-142G) 132kV/220kV/400kV Cables
RESPONSIBILITIES:
- Obtain the project permits from authorities.
- Supervising the site surveying works.
- Review and follow up the site drawings.
- Responsible for studying the drawings received from Authorities in order to expose the existing underground utilities.
- Managing and supervising the subcontractor’s site works (Trenching -construction of the joint bays, road crossings and manholes).
- Arranging and attending all the site`s inspections from both sides (consultant side and the client side).
- Handling and supervising cable pulling, jointing and termination works activities.
- Holding all the required client (KAHRAMAA-Qatar) permits to work inside the electrical substations.
- Coordinating and arranging for the electrical and high voltage tests for the installed circuits.
- Responsible for checking all the re-instatement works in order to get the site clearances.
Responsible for communicating with the clients and consultants.
- Responsible for schedules of project development.
- Coordinates activities concerned with technical developments, scheduling, and resolving engineering design and test problems.
- Coordinates team activities and communicates project status through technical reports.
- Managing Projects from conception, pre-production through completion.
- Responsible for the completion of all documentation.
- Managing project budget and keeping costs to its minimum.
- Producing the site activities program and the progress reports.
- Responsible and accountable to ensure that all assigned personnel are coordinating their activities with other project participants and that the requirements of the Contract are being satisfied.
- Responsible for communicating with the clients and consultants.
- Responsible for schedules of project development.
- Coordinates activities concerned with technical developments, scheduling, and resolving engineering design and test problems.
- Coordinates team activities and communicates project status through technical reports.
- Managing Projects from conception, pre-production through completion.
- Responsible for the completion of all documentation.
- Managing project budget and keeping costs to its minimum.
- Producing the site activities program and the progress reports.
- Responsible and accountable to ensure that all assigned personnel are coordinating their activities with other project participants and that the requirements of the Contract are being satisfied.
PROFESSIONAL EXPERIENCE:
Company : MITSUBISHI CORPORATION - Qatar (December 2005 to June 2013)
Position : Project Engineer - Qatar Power Transmission System Expansion - Projects (GTC-241B & GTC-240A) 132kV/220kV/400kV Cables
RESPONSIBILITIES:
- Responsible for communicating with the clients and consultants.
- Responsible for schedules of project development.
- Coordinates activities concerned with technical developments, scheduling, and resolving engineering design and test problems.
- Coordinates team activities and communicates project status through technical reports.
- Managing Projects from conception, pre-production through completion.
- Responsible for the completion of all documentation.
- Managing project budget and keeping costs to its minimum.
- Producing the site activities program and the progress reports.
- Responsible and accountable to ensure that all assigned personnel are coordinating their activities with other project participants and that the requirements of the Contract are being satisfied.
Position : Site Engineer - Qatar Power Transmission System Expansion - Projects (GTC-5 GTC-22 & GTC-142G) 132kV/220kV/400kV Cables
RESPONSIBILITIES:
- Obtain the project permits from authorities.
- Supervising the site surveying works.
- Review and follow up the site drawings.
- Responsible for studying the drawings received from Authorities in order to expose the existing underground utilities.
- Managing and supervising the subcontractor’s site works (Trenching -construction of the joint bays, road crossings and manholes).
- Arranging and attending all the site`s inspections from both sides (consultant side and the client side).
- Handling and supervising cable pulling, jointing and termination works activities.
- Holding all the required client (KAHRAMAA-Qatar) permits to work inside the electrical substations.
- Coordinating and arranging for the electrical and high voltage tests for the installed circuits.
- Responsible for checking all the re-instatement works in order to get the site clearances.
Company : POWER PROJECTS - Qatar (November 2004 to December 2005)
Position : Site Engineer
RESPONSIBILITIES:
- Responsible for supervising the power cable works (cable laying, jointing, termination and dressing inside electrical substation) 11kV/66kV/132kV/220kV
- Providing technical support to the site team.
- Preparing and reporting the daily site progress report to the project manager.
Company : BOGEST - Oman (July 2002 to October 2004)
Position : Electrical Engineer
RESPONSIBILITIES:
- Responsible for the internal wiring of different projects.
- Calculating the load distribution.
- Responsible for 11kV cable laying and termination works.
Company: POWER PROJECTS - Qatar (November 2004 to December 2005)
Position: Site Engineer
RESPONSIBILITIES: - Responsible for supervising the power cable works (cable laying, jointing, termination and dressing inside electrical substation) 11kV/66kV/132kV/220kV
- Providing technical support to the site team.
- Preparing and reporting the daily site progress report to the project manager.
Company: BOGEST - Oman (July 2002 to October 2004)
Position: Electrical Engineer
RESPONSIBILITIES: - Responsible for the internal wiring of different projects.
- Calculating the load distribution.
- Responsible for 11kV cable laying and termination works.
University: Al-Mansoura University
Five years study in the electrical power and machines section in the faculty of Engineering in Almansoura University in Egypt
A course of five years of electrical power and machines at the faculty of engineering of almansoura university-Egypt