Welding Inspector
Bureau Veritas
مجموع سنوات الخبرة :14 years, 6 أشهر
• To assist the Site Superintendent & coordinate the supervisor’s activity, carry out & implement the QA/QC program, arrange & conduct meeting under the Site Superintendent direction.
• To visit the construction site daily to check whether all works, materials, equipment, are in accordance with QA/QC program, Project drawing & specification. When defective materials, equipment, or workmanship are found, immediate action to be taken to correct them, & to report the corrective action to the Site Superintendent.
• To conduct all required tests in accordance with contract documents and to prepare fill in & sign all reports & forms as necessary for the compliance with Contract Quality Standards.
• Carrying out preliminary inspection of materials of construction & reviewing the material mill certificate.
• Preparing the weld inspection & material traceability certificate & updating the same.
• Inspecting the weld fit-up of joints prior to root pass & visual inspection of final weld, conducting penetrant test on welding joints.
• Planning / organizing and checking of work progress & schedules to meet the deadlines/target dates & implementing QA/QC plans.
• To check the field welds & consumables comply with project qualifications.
• To check all repairs are perform correctly & nondestructive tests are regularly repeated.
• To keep a report file for all nondestructive tests.
• To obtain any necessary approval for changing as appropriate procedure & for reforming requiring special procedures.
• Identifying & issuing of non-conformity as observed during working.
• Coordinating with quality control departments & representing matters with the client.
• Planning work execution as per work vender specifications / requirements & work target.
• Supervising & coordinating with work force in executing job to completion on time as per work plan & with safety precautions/procedures.
• Conducting through stage-wise inspection as per procedures / codes as well as alignment & assembly of equipment at site during installation.
• Estimating of material requirements after study of vendor drawings & specifications.
• Carry out preliminary, on stage & final inspection (Hydrostatic Test).
• Witness and Inspect for Loading and off-loading products.
• To assist the Site Superintendent & coordinate the supervisor’s activity, carry out & implement the QA/QC program, arrange & conduct meeting under the Site Superintendent direction.
• To visit the construction site daily to check whether all works, materials, equipment, are in accordance with QA/QC program, Project drawing & specification. When defective materials, equipment, or workmanship are found, immediate action to be taken to correct them, & to report the corrective action to the Site Superintendent.
• To conduct all required tests in accordance with contract documents and to prepare fill in & sign all reports & forms as necessary for the compliance with Contract Quality Standards.
• Carrying out preliminary inspection of materials of construction & reviewing the material mill certificate.
• Preparing the weld inspection & material traceability certificate & updating the same.
• Inspecting the weld fit-up of joints prior to root pass & visual inspection of final weld, conducting penetrant test on welding joints.
• Planning / organizing and checking of work progress & schedules to meet the deadlines/target dates & implementing QA/QC plans.
• To check the field welds & consumables comply with project qualifications.
• To check all repairs are perform correctly & nondestructive tests are regularly repeated.
• To keep a report file for all nondestructive tests.
• To obtain any necessary approval for changing as appropriate procedure & for reforming requiring special procedures.
• Identifying & issuing of non-conformity as observed during working.
• Coordinating with quality control departments & representing matters with the client.
• Planning work execution as per work vender specifications / requirements & work target.
• Supervising & coordinating with work force in executing job to completion on time as per work plan & with safety precautions/procedures.
• Conducting through stage-wise inspection as per procedures / codes as well as alignment & assembly of equipment at site during installation.
• Estimating of material requirements after study of vendor drawings & specifications.
• To assist the Site Superintendent & coordinate the supervisor’s activity, carry out & implement the QA/QC program, arrange & conduct meeting under the Site Superintendent direction.
• To visit the construction site daily to check whether all works, materials, equipment, are in accordance with QA/QC program, Project drawing & specification. When defective materials, equipment, or workmanship are found, immediate action to be taken to correct them, & to report the corrective action to the Site Superintendent.
• To conduct all required tests in accordance with contract documents and to prepare fill in & sign all reports & forms as necessary for the compliance with Contract Quality Standards.
• Carrying out preliminary inspection of materials of construction & reviewing the material mill certificate.
• Preparing the weld inspection & material traceability certificate & updating the same.
• Inspecting the weld fit-up of joints prior to root pass & visual inspection of final weld, conducting penetrant test on welding joints.
• Planning / organizing and checking of work progress & schedules to meet the deadlines/target dates & implementing QA/QC plans.
• To check the field welds & consumables comply with project qualifications.
• To check all repairs are perform correctly & nondestructive tests are regularly repeated.
• To keep a report file for all nondestructive tests.
• To obtain any necessary approval for changing as appropriate procedure & for reforming requiring special procedures.
• Identifying & issuing of non-conformity as observed during working.
• Coordinating with quality control departments & representing matters with the client.
• Planning work execution as per work vender specifications / requirements & work target.
• Supervising & coordinating with work force in executing job to completion on time as per work plan & with safety precautions/procedures.
• Conducting through stage-wise inspection as per procedures / codes as well as alignment & assembly of equipment at site during installation.
• Estimating of material requirements after study of vendor drawings & specifications.
• Carry out preliminary, on stage & final inspection (Hydrostatic Test).