Work Experience

Total years of experience :25 years, 10 Months

Head of QS/Contracts at Consolidated Contractors International Company (CCIC)
  • Saudi Arabia - Jizan
  • My current job since November 2018

Sulfur Recovery Unit
Saudi Oil & Gas Company - ARAMCO
1- Major approximate Quantities for both packages:
2- Concrete work 21, 873 M3
3- Buildings 2, 796 M2
4- Piping 598, 610 ID
5- E/I Cables 431 Kms
6- Pipe Support 636 Ton
7- Equipment 6, 239 Ton
8- Painting 88, 666 M2
9- Insulation 91, 012 M2
Soot Ash removal Unit

Total Original Contract value US$ 587 Million

Saudi Oil & Gas Company - ARAMCO
1- Major approximate Quantities for both packages:
2- Concrete work 17, 331 M3
3- Buildings 4002 M2
4- Piping 411, 816 ID
5- E/I Cables 905 Kms
6- Pipe Support 306 Ton
7- Equipment 11, 496 Ton
8- Painting 94, 433 M2
9- Insulation 40, 977 M2

Total Original Contract value US$ 599 Million

• Prepare changes requests and follow-up with client as per client change procedure taking into consideration company policy.
• Attend commercial meeting with client to discuss and clarify any commercial issues related to changes, interim payment
• Prepare and Submit Project monthly invoice to client ( SAIPEM) and follow up till payment effected
• Prepare and coordinate the required information related to claims (prolongation, change in low, disruption, etc.)
• Coordinate with claim expert company in preparation of reliable claim by using the best claim method and the related data from all related departments.

Head of QS/Contracts MEICA (Mechanical-E&I) at Consolidated Contractors International Company (CCIC)
  • Qatar - Doha
  • May 2015 to October 2018

Water Mega Reservoirs project (Package A & C)
Qatar General Electricity & Water Corporation (KAHRAMAA - Qatar)Due to the continues growth and development in Qatar KAHRAMAA is implementing a water security Mega Reservoirs project which will provide a minimum 7 days strategic water storage within its network, the project is consisting of 5 packages, CCIC awarded two of them (Package A 4no. reservoirs - Package C 5no. reservoirs) each reservoir is 500, 000 m3 capacity, the work includes a considerable MEP work (Pumping station, Surge system, Chlorination System, Generators (MV & LV), SCADA system, Ductile Iron & Carbone steel pipes)
Major approximate Quantities for both packages:
1- Concrete work 1, 300, 000 M3
2- Buildings 40, 800 M2
3- Rebar 340, 000 Ton
4- Piping 65.7 KM (Ductile iron& Carbone steel (Diameter from 0.6 M up to 2.2M D)
5- E/I Cables 410 Kms
6- 2 Pumping stations
Total Package A US$ 575 Million
Mechanical + E&I (MEP) Scope 202 US$ Million
Total Package C US$ 604 Million
Mechanical + E&I (MEP) Scope 139 US$ Million

In additional to Duties as senior QS Mechanical I take the responsibility of Subcontract Manager with Leading a team of QSs, material engineers to arrange the following related to Mechanical, I&E scope of work
• Preparation of Procurement, subcontract planes and repair the related Suppliers and subcontractors list to get the necessary PMO approvals.
• Coordination to Prepare RFQs as per procurement and Subcontracting plan agreed by PMO.
• Arrange and review Subcontract Package and purchase orders.
• Preparation of bid evaluation and comparison reports for both subcontractors and suppliers
• Arrange and preform price negotiations rounds to get the best prices in line with project budget.
• Arrange pre-award / kick off meeting
• Preparation subcontract agreement, Service Order and Purchase Order package and process the contract signature cycle as per company policy and level of authority
• Communication with LTSC / Suppliers related to contractual matters.
• Review and approve Subcontractors/Suppliers invoices.
• Follow with account Department the statues of Subcontractors/Suppliers payment to insure it’s affected within the contractual time frame.
• Retain all records related to subcontracting procedure or material purchasing.
• Make sure that all work processes are complying with company quality management procedures.
• Provide the necessary information to Project Contract Manager related to subcontractors and Suppliers work progress to be included in project invoice to Client.
• Monitor the activities and performance of the QSs, Material Engineers and Control Engineers providing technical advice and support, recommending the suitable training programs.

Head of Qs Mechanical at Consolidated Contractors International Company
  • Qatar - Doha
  • January 2012 to May 2015

Barzan Onshore project
JGC Corporation
To develop an integrated project to produce market with Natural gas derived from the Qatar Barzan will - North Field. The project is required to secure increased Local market demand
Major approximate Quantities:
1- Concrete work 16, 000 M3
2- Structure Steel 18, 317 Ton
3- Piping 1, 627, 870 ID
4- Pipe Support 1876 Ton
5- Equipment Ton
6- Painting 450, 790 M2
7- Insulation 152, 000 M2
US$ 300 Million
•Duties:
• In additional to Duties as senior QS Mechanical I take the responsibility of Subcontract Manager with the below duties
• Preparation of preliminary Bidder’s list.
• Arrange and review Subcontract Package.
• Preparation of bid evaluation and comparison reports
• Preparation of Subcontract Agreements
• Arrange pre-award and kick off meeting
• Arrange for subcontract agreements to be signed
• Communication with LTSC related to contractual matters
• Retain all records related to subcontracting procedure

Senior Quantity surveyor at Consolidated Constractors International Company (CCIC)
  • Qatar - Doha
  • March 2008 to December 2011

RasGas Company -RGX-II Project in Qatar (Train 6&7 project )
Chiyoda - Technip Joint Venture (CTJV)
To develop an integrated project to produce, export and market LNG derived from the Qatar North Field. The expansion is required to meet the market demand
Major approximate Quantities:
1- Concrete work 182, 000 M3
2- Buildings 18, 400 M2
3- Structure Steel 22, 000 Ton
4- Piping & Supports 60, 000 Ton
5- Equipment 72, 000 Ton
6- Painting 950, 000 M2
7- Insulation 260, 000 M2
8- Fireproofing 35, 000 M2
9- E/I Cables 3, 500 Kms
US$ 450 Million

RasGas Company-Al-Khaleej Gas Project, Phase 2 in Qatar (AKG2 project )
Chiyoda - Technip Joint Venture (CTJV)
To develop an integrated project to produce, Gas derived from the Qatar North Field. to meet the local market increased demand
Major approximate Quantities:
1- Earth Work 120, 000 M3
2- Concrete work 56, 000 M3
3- Buildings 3, 400 M2
4- Structure Steel 8, 200 Ton
5- Piping & Supports 20, 000 Ton
6- Equipment 23, 000 Ton
7- Painting 250, 000 M2
8- Insulation 130, 000 M2
9- E/I Cables 1, 500 Kms
US$ 350 Million
• Obtains quotations for specialist subcontractors and for the materials required for the direct works by preparing bid packages of drawings, technical specifications Etc. to insure accurate specification of CCIC requirements.
• Establishes procedures for implementation of, control over, monitoring and payments to specialist subcontractors.
•Establish for measurement all work carried out under the contract and preparation of detailed and accurate applications for monthly payments.
•Establishes the implementation of the variation procedures in line with the contract requirements ensuring that all variation are accurately estimated, authorized and processed with relevant supporting documentation.
•Maintains constant contact with project team to ensure the flow of information and identification of work outside the original scope of the contract.
•Implements a final account procedure and ensure that it is effectively pursed as the project progresses.
•Advice project manager on the all contractual maters promptly produces correct correspondence and advice appropriate courses of action to ensure CCIC’s contractual positions protected and profitability on contract is optimized.
•Ensures re-measurement of subcontract work, including agreeing variation orders, payments certificates.
•Recommend for approval, and implement, training and development programs to meet identified needs with the department and ensure that capable personnel with the relevant skills staff activities.
•Monitor the activities of junior quantity surveyors providing technical guidance and support as necessary.
•Monitor the subcontractors’ payment and prepare monthly payment certificates against work done and insure that the quantities are matching with the re-measuring quantities of the main contract.
•Hot tap Coordination between client (RasGas), contractor (CTJV), Subcontractor (CCIC) and specialist subcontractor (TDW Or Furmanite) with total Number of 30 hot tapes ranging from 1” up to the biggest stainless steel which is 36”
-Attending coordination meetings ( Client, Contractor, Subcontractor and specialist subcontractor) to follow up all arrangement and required documentation preparation for approval of Hot Tap Dossiers ( MS, JSA, ….etc)
-Following all technical and commercial issues with contractor as well as specialist sup contractor.
-Following up specialist subcontractor activity in preparation for performing Hot Tap.
-Monitoring specialist subcontractor payment and preparation of payment certificate.

Estimator (Mechanical) at KHARAFI NATIONAL (The National Company For Mechanical and Electric Works Ltd)
  • Kuwait - Al Kuwait
  • September 2006 to March 2008

• To review draft tender documents to insure all systems and components of the tender are included.
• To prepare tender documentation queries to consultants/clients to confirm and collect any missing data including; shipping costs, insurance, and any regional requires.
• To prepare reports and supporting documents to submit to proposal coordinator to identify area requiring more information to ensure the company is positional to win and secure bids
• To develop tender cost summaries including equipment, material, and labours calculations for final approval
• To interpret & review system drawings to identify any difference to tender requirements and rise queries against specification
• To review and generate bill of quantities against system drawings to insure alignment and to identify materials types & quantities and prepare equipment lists and rough drawings for cost estimation.
• To interpret and follow company tendering processes and procedures to ensure all aspects of tender are met including relevant discipline codes and sanders.
To prepare specification documents to submit to vendors for quotations of cost/price of materials and equipment and evaluate same against tender specifications to include in final tender documentation.

Proposal Engineer at PETROJET
  • Egypt
  • March 2002 to September 2006

• Studying tender documents, preparing technical & commercial proposals, attending clarification meeting with client, review and negotiate contract drafts with client during contracting period up to final signature of the contract
• Make the necessary and active coordination between the various divisions participating in studying and preparation of proposals (Civil, E&I and equipment fabrication…)
• Preparation of budget report and cost estimation Related to mechanical activities for construction (Above and underground piping, steel structure, equipment erection, spherical & cylindrical tanks) including preparation of material requisition if required for bedding stage.
• Make the necessary studies to determine and divine all cost breakdown items (direct and indirect including cost of accommodation, over heads…)
- The following list of some major projects studied by myself and awarded to PETROJT

Project Name Clint Contract Total value
1 Portsaide UGD process Facilities United Gas Derivatives ( UGD ) 90 Million US$
2 Damietta Export Facilities United Gas Derivatives ( UGD ) 30 Million US$
3 LNG Export Marin Jetty At Edco For Egyptian LNG project Technimont 20 Million US$
4 Fabrication, Transportation and installation of DUBA permanent Berth Aramco Overseas Company (Aramco Saudi Arabia) 9 Million US$
5 Smart Village Cold & Hot water Air Conditioning Network Egyptian Company for Natural Gas ( GASCO ) 5 Million US$
6 Maximization Of C2 & C3 Egyptian Company for Natural Gas ( GASCO ) 50 Million US$
7 Four (4) Grain Silo Complexes Egyptian Holding Company For Silos and Storage 32 Million US$
8 Fauom Grains Silo Complex Egyptian Holding Company For Silos and Storage 30 Million L.E.
9 Minia Grains Silo Complex Egyptian Holding Company For Silos and Storage 45 Million L.E.
10 Bany sowif Grains Silo Complex Egyptian Holding Company For Silos and Storage 40 Million L.E.

Technical Office Engineer (Mechanical) at PETROJET
  • Egypt
  • August 1998 to March 2002

• Study contract documents very carefully to define the scope of work and responsibilities.
• Make QTY's surveying for all project activities
• Prepare work progress invoices.
• Attend all meetings with client to clear any technical clarifications related to work progress and invoices.
• Preparing & checking monthly invoices for sub contractor's activities.
• Cost control for all mechanical activities in the project including the preparation of monthly cost reports to highlight the cost items have been done and the remaining items measured to project budget
• Check all drawings, quantity surveying, site follow-up and Document control.
- The following are the project which I have the position of technical office engineer

Jan. 2001 - To March 2002 PETROJET
Title: Technical Office Engineer - Mechanical
Project Name: Pipe rack In front of petroleum companies
Owner Company : El- Nasr Petroleum Company.
Project Description Procure & construct of 3000 pipe rack -construction of 18, 000 Inch diameter carbon steel pipes.
Contract Value US$ 3.5 Million

October 2000 - To Jan. 2001 PETROJET
Title: Technical Office Engineer - Mechanical
Project Name: Idku Abu-homos 24" Gas pipe line ( 24 Km )
Owner Company : Rashid petroleum Company ( Rashpetco)
Project Description Construction of 24 " gas pipe line including water crossings.
Contract Value US$ 24 Million

August 1998 - To Oct. 2000 PETROJET
Title: Technical Office Engineer - Mechanical
Project Name: Polyethylene project plant
Owner Company : Samsung
Project Description: Construction of the following:
1-pipng 300, 000 inch diameter Carbon steel, alloy steal and stainless steel including painting and insulation.
2- Erection of 3000 ton of equipment
3-Fabrication & erection of 3000 ton of steel structure including painting.
Contract Value: US$ 32 Million

Education

Bachelor's degree, Mechanical
  • at Mechanical Engineering - Alexandria University
  • May 1995

Specialties & Skills

Quantity Surveying
Subcontracting
Proposal Coordination
Proposal Review
Tender Preparation
study and preparing commercial and technical offers
Primavera
microsoft package

Languages

Arabic
Native Speaker
English
Expert

Memberships

PMI
  • 2790604
  • June 2013

Training and Certifications

Advanced Project Management (Training)
Training Institute:
PMI - Madras Management Training Intitute
Date Attended:
September 2013

Hobbies

  • Reading
  • Squash
  • Football