خالد عبد الكريم محمود, Civil Qc Manager

خالد عبد الكريم محمود

Civil Qc Manager

Petrojet

البلد
مصر
التعليم
بكالوريوس, water purification
الخبرات
15 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 10 أشهر

Civil Qc Manager في Petrojet
  • المملكة العربية السعودية - الهفوف
  • أغسطس 2018 إلى فبراير 2022
Civil QA/QC Manager في Petrojet
  • العراق - البصرة
  • نوفمبر 2016 إلى يونيو 2018

 Ensure implementation of the Quality Management System.
 To establish Company Quality Plan including Quality Policy and continually improve it.
 Responsible for ensuring that Company Quality Management policy, plans and procedures are implemented effectively and are suitable for the their purposes and use for which they are intended.
 Initiating the inspection and test plans for the project.
 Develops the existing Quality Management System as necessary with additional procedures/instructions for station-specific aspects.
 Establish Project Quality audit program & schedule and perform the Project Quality Audit within the project organization.
 Monitor Company Quality System activities such as Site Quality activities based on Companies Management system and Project requirements.
 Coordinate and communicate with Client on Project Quality issues.
 Report the performance status of Project Quality activities and relevant issues to the Corporate QHSE Team Leader and Project Manager.
 Ensure that Quality Management is applied in line with the Project Design Criteria to the Engineering, Procurement, Construction and Pre Commissioning/Commissioning phases of the Project.
 Ensure that the Project meets international standards.
 Perform root cause analysis and resolve problems.
 Supervising technical or laboratory staff.
 Recording, analyzing and distributing statistical information.
 Specifying quality requirements of raw materials with suppliers.
 Ensuring that manufacturing processes comply with standards at both national and international level.

Civil QA/QC Manager في THE PETROLEUM PROJECTS & TECHNICAL CONSULTATIONS CO.
  • المملكة العربية السعودية - ينبع
  • يونيو 2013 إلى مارس 2016

 Manage and oversee project quality to ensure compliance to codes, standards, regulations, equipment specific specifications, and QMS requirements.
 Planning duties within the QA/QC staff and related work schedules.
 Identifying and developing QA/QC personnel certification requirements and continuing education/training needs.
 Managing inspection, NDE, and testing plans for new construction, repair work
 Identify and develop solutions to correct inspection function deficiencies.
 Manage construction processes, plant equipment, inspection and NDE personnel certification and QMS internal audits.
 Respond to customer complaints putting in containment actions.
 Auditing all the report submitted to the client by the discipline supervisor.
 Supervising technical or laboratory staff.
 Attend various meetings and action/communicate instructions.
 Specifying quality requirements of raw materials with suppliers.
 Initiating the inspection and test plans for the project.
.

Civil Quality control Engineer. في THE PETROLEUM PROJECTS AND TECHNICAL CONSULTATIONS COMPANY
  • المملكة العربية السعودية - الجبيل
  • ديسمبر 2011 إلى يونيو 2013

 Monitoring and reviewing codes, specifications, drawings, procedures and material to ensure compliance with both client and code specifications as well as monitoring the procedure and performance of all consultants.
 Responsibility for complying the content as well as implementing quality control procedure manual as it relates to day to day operations, review cycles and design execution to evaluate quality and performance per client specifications.
 Monitoring the Materials delivered to site for compliance with Engineering approved documents and specifications.
 Attending Materials testing and verification laboratory testing sessions.
 Provide daily/weekly/Monthly reports.
 Evaluation and testing of all construction materials to ensure they comply with the contractual requirements and advising approvals and corrective action as appropriate.
 Attend activities on site and ensure their compliance with QA/QC and conduct audits as required.

Civil Quality Control Engineer. في THE PETROLEUM PROJECTS AND TECHNICAL CONSULTATIONS COMPANY
  • مصر - القاهرة
  • يونيو 2010 إلى ديسمبر 2011

 Monitoring the concrete batch plant.
 Supervising the concrete tests in-situ.
 Attending the concrete samples compressive test.
 Reviewing the test results complying with the project specifications.
 Monitoring the Materials delivered to site for compliance with Engineering approved documents and specifications.
 Conducting inspections for the batch plant material receiving.
 Reviewing the batch plant material test reports.
 Auditing all the earthwork inspections by the third party.

Civil Construction Engineer. في THE PETROLEUM PROJECTS AND TECHNICAL CONSULTATIONS COMPANY
  • مصر - القاهرة
  • فبراير 2007 إلى يونيو 2010

 Provide complete study for design drawings implementation.
 Prepare and issue as built drawings.
 Coordinate with material engineers to make sure that materials are available on site before starting of activities.
 Monitoring the Materials delivered to site for compliance with drawings.
 Following up the site activities
 Planning the interfering of more than one sub-contractor.
 Preparing shop drawings for the reinforced steel to be manufactured.
 Checking all the formwork and steel activities.
 Monitoring all the finishing activities.

Civil Construction engineer في THE PETROLEUM PROJECTS AND TECHNICAL CONSULTATIONS COMPANY
  • مصر - القاهرة
  • سبتمبر 2005 إلى فبراير 2007

 Provide complete study for design drawings implementation.
 Follow up all the site activities.
 Follow up subcontractor's rates.
 Coordination between different activities.
 Prepare and issue as built drawings.
 Coordinate with material engineers to make sure that materials are available on site before starting of activities.

الخلفية التعليمية

بكالوريوس, water purification
  • في 10th of ramadan
  • سبتمبر 2005

(Feb. 2014): Final approval as civil quality control Engineer (SAMSUNG) (Aug. 2013): Final approval as civil quality control Engineer (LUBEREF) (Feb. 2013): RTR pipes quality control certificate (SAUDI ARABIAN AMIANTIT) (Sep. 2012): Final approval as civil quality control inspector (ARAMCO) (Sep. 2014): High strength concrete course (AUC) (Sep. 2010): Concrete repair course (AUC) (Sep. 2008): Soil mechanics course (AUC) (Mar. 2005): Civil Diploma (AutoCAD-Sap2000-Primavera 3.0- Excel) (YAT INSTITUTE) (Jan.2005): Bachelor degree in engineering – Civil Dep. Higher Technological Institute (10th of Ramadan). Graduation Project: Water Purification & Sanitary setting up. (Sep.1997): Secondary school from Victory Collage in Maadi

Specialties & Skills

Quality Control
civil engineer
QA QC Engineering
Language Skills
ACad 2D
Microsoft Office

اللغات

الانجليزية
متمرّس
العربية
متمرّس

التدريب و الشهادات

Soil mechanics course (AUC) (الشهادة)
تاريخ الدورة:
August 2008
صالحة لغاية:
September 2008
Civil Diploma (AutoCAD-Sap2000-Primavera 3.0- Excel) (YAT INSTITUTE) (الشهادة)
تاريخ الدورة:
May 2005
صالحة لغاية:
July 2005
Concrete repair course (AUC) (الشهادة)
تاريخ الدورة:
November 2010
صالحة لغاية:
December 2010

الهوايات