Total des années d'expérience: 15 Années, 4 Mois
juin 2019
A À présent
Senior mechanical engineer
à Sahra star
Lieu :
Arabie Saoudite
- Supervision of several projects: Plumbing, Fire fighting & HVAC.
- QS & Pricing for similar projects
- Prepare: Shop drawings and As-built drawings.
- QS & Pricing for similar projects
- Prepare: Shop drawings and As-built drawings.
octobre 2017
A juin 2019
Senior mechanical engineer
à First fix
Lieu :
Arabie Saoudite - Riyad
- Study and design of underground utility network: Plumbing, Fire fighting
Including: Hydraulic calculation, Heat load calculation, Mechanical equipment criteria.
- Prepare: MTS, Schematic drawings, Design drawings, Shop drawings and As-built
drawings.
Including: Hydraulic calculation, Heat load calculation, Mechanical equipment criteria.
- Prepare: MTS, Schematic drawings, Design drawings, Shop drawings and As-built
drawings.
juillet 2013
A octobre 2017
Mechanical engineer
à HAACS
Lieu :
Arabie Saoudite - Jeddah
-Construction manger for the following project:
- Water treatment plant in Alkhumra - Jeddah, including:
- Installation of GRP pipes vertically and horizontally
( range of diameter from 3.8 m to 1.2 m )
- Installation of 9 pumps ( each one 10.5 ton, 10'000 HP )
- Installation of check valves, reducers, dismantling joints and duck foots
( range of each piece weight from 0.7 ton to 3.5 ton)
- Organize work group ( 40 workers, cranes, shovel, bobcat and TCR )
- Many buildings ( services, power plant and warehouse ) in KAP
- King Salman International Conventional Center - Al Madinah Al Munawwarah
Our zone value is 6 millions Saudi riyal
- Project manager for project:
- Zahid Tabuk Facility ( workshop, warehouse and office building)
- Supervision and study of several projects ( Plumping, Firefighting & HVAC)
- Water treatment plant in Alkhumra - Jeddah, including:
- Installation of GRP pipes vertically and horizontally
( range of diameter from 3.8 m to 1.2 m )
- Installation of 9 pumps ( each one 10.5 ton, 10'000 HP )
- Installation of check valves, reducers, dismantling joints and duck foots
( range of each piece weight from 0.7 ton to 3.5 ton)
- Organize work group ( 40 workers, cranes, shovel, bobcat and TCR )
- Many buildings ( services, power plant and warehouse ) in KAP
- King Salman International Conventional Center - Al Madinah Al Munawwarah
Our zone value is 6 millions Saudi riyal
- Project manager for project:
- Zahid Tabuk Facility ( workshop, warehouse and office building)
- Supervision and study of several projects ( Plumping, Firefighting & HVAC)
septembre 2012
A juillet 2013
Mechanical Engineer
à Linaset
Lieu :
Arabie Saoudite - Jeddah
- Study, design and supervision of several projects( swimming pool, fountain and
waterfall )
- Study, design and supervision of firefighting networks and pump sets assembly
- QS & Pricing for similar projects
waterfall )
- Study, design and supervision of firefighting networks and pump sets assembly
- QS & Pricing for similar projects
octobre 2008
A juillet 2012
Mechanical Engineer
à Engineering Office
Lieu :
Syrie - Hums
- Study and supervision of several projects: Plumbing, Fire fighting & HVAC,
- Teaching at Mechanical & Electrical Engineering College
- Teaching at Mechanical & Electrical Engineering College
Partager sur Facebook
Partager sur Twitter
Partager via Email