Finishing Engineer
Al-Thuriah
Total years of experience :17 years, 9 Months
• All Finishing works such as (block works, builders works, plaster works, screed works, tilling works, painting works ….).
• MEP plant rooms walls and flooring finishing works such as (water proofing and epoxy paints).
• FACAD finishing works such as (surface preparation, bitumen paints, rockwool, curtain wall, ACP cladding, GRC cladding, Marbel cladding, lamination glass...etc..).
• Daily progress report including all activities and man power distribution.
• Mock up works (completion finishing works for tow flat from A to Z).
• Join consultant during the inspections times in order to get approval for all above activities.
• Daily and weekly progress meetings.
• Landscaping works such as (paving, planter boxes, polar lights…etc.)
• Tasting and commissioning.
• Hand over building for facility management
UAE/Abu Dhabi/Fibrex Industrial and construction Group(Construction Department)
Project Engineer in: Najmat Project / High Tower 26 Floors with 3 basements (Reem Island)
12th of April 2014 - Up to present
Duties were following for:
• All Finishing works such as (block works, builders works, plaster works, screed works, tilling works, painting works ….).
• MEP plant rooms walls and flooring finishing works such as ( water proofing and epoxy paints).
• Facad finishing works such as ( surface preparation, bitumen paints, rock wool and GRC cladding).
• Daily progress report including all activities and man power distribution.
• Mock up works (completion finishing works for tow flat from A to Z).
• Join consultant during the inspections times in order to get approval for all above activities.
• Daily and weekly progress meetings.
UAE/Abu Dhabi/Fibrex Industrial and construction Group (Construction Department)
Site Engineer in: Najmat Project / High Tower 26 Floors with 3 basements (Reem Island)
1 May 2013 - 12th April 2014
Duties were following for: • All compaction soil, blinding, isolating, steel fixing, shuttering, and casting works for all
foundation up to raft level.
• Retaining walls and ramp walls works (isolating, steel fixing, shuttering, and casting)
• All columns works (steel fixing, shuttering, MEP services and casting)
• Basement slabs works (steel fixing, shuttering, MEP services and casting)
• Daily and weekly progress meetings.
• Preparing all time sheets of my stuff formans and labors.
Al-Rawda Palace Project/Tracks Road/Al-Ain/ (Internal Gypsum Decoration)
18 January 2013 - 30 April 2013.
Duties: • Following up for GRC cladding works fixing, alignment, and finishig
• Join weekly meetings with main contractor.
• Following planning program in order to finalize the works at the limited time.
• Dealing with main contractor for any mistakes or updating could be requested at the site.
• Preparing all time sheets of my stuff formans and labors.
• Coordinating between our design department and main contractor one for any new scope of works.
Doing weekly and monthly progress report in order to focus the productivity and weak points.
Central Market Project/Hamdan Road/Abu Dhabi/ (GRC Cladding).
12th of March 2011 - 22nd of August 2012
Duties:
• Following up for GRC cladding works fixing, alignment, and finishing.
• Join weekly meetings with main contractor.
• Following planning program in order to finalize the works at the limited time.
• Dealing with main contractor for any mistakes or updating could be requested at the site.
• Preparing all time sheets of my stuff formans and labors.
• Coordinating between our design department and main contractor one for any new scope of works.
• Doing weekly and monthly progress report in order to focus the productivity and weak points.
Marriot Hotel Project/Near of Grand Mosque /Abu Dhabi/ (GRC Cladding).
21st of August 2010 - 11th of March 2011
Duties:
• Following up for GRC cladding works fixing, alignment, and finishig .
• Join weekly meetings with main contractor.
• Following planning program in order to finalize the works at the limited time.
• Dealing with main contractor for any mistakes or updating could be requested at the site.
• Preparing all time sheets of my stuff formans and labors.
• Coordinating between our design department and main contractor one for any new scope of works.
Doing weekly and monthly progress report in order to focus the productivity and weak points.
Zaid University Project/Khalifa (A) City/Abu Dhabi/ (GRC Cladding).
18th of February 2010 - 20th of August 2010
Duties:
• Following up for GRC cladding works fixing, alignment, and finishig .
• Join weekly meetings with main contractor.
• Following planning program in order to finalize the works at the limited time.
• Dealing with main contractor for any mistakes or updating could be requested at the site.
• Preparing all time sheets of my stuff formans and labors.
• Coordinating between our design department and main contractor one for any new scope of works.
Doing weekly and monthly progress report in order to focus the productivity and weak points.
UAE/Abu Dhabi/Fibrex Industrial and construction Group (Construction Department)
Site Engineer in Al-Reef Villas Project /Al-Falah Area /Dubai Road.
12 January 2009 - 17 February 2010.
Duties: • Following up for substructure works at downtown zone (1) pilling, pile caps, and foundations.
• Following all structural works shuttering, steel fixing, MEP fixing, MEP fixing, and casting for post tension slabs.
• Dealing with precast cladding, precast stairs, and GRC toilets fixing.
UAE/Abu Dhabi/Fibrex Industrial and construction Group (Design Department)
Structural coordinator in Al-Reef Villas Project/Al-Falah Area/Dubai Road.
8 September 2007 - 11 January 2009.
Duties
• Structural shop drawing for villas and downtown.
• Bar pending schedules as per British standers.
• Following up for structural draftsmen team in the design room.
• Dealing with any updating or new requirement coming from the site and revise the drawing according to it.
• Structural shop drawings and as built drawings for some temporary building at the site.
• Join all design meetings.
Syria/Damascus/BENA Company (MEP Department)
Site Engineer in Al-Fadel Villa/Yafoor city
12 August 2006 - 5 September 2007
Duties: • Following up the plumping workshops.
• Shop drawing and as built drawing for plumping plans
• Organization of material at site warehouse.
My name is Khalid Fuad Kitmitto, and I am Palestinian. I had finished my education in Syria (Damasc