Khalid Mahmood, Senior Project Controls Engineer

Khalid Mahmood

Senior Project Controls Engineer

Jacobs ZATE

Location
Saudi Arabia - Dammam
Education
Master's degree, Mechanical Engineering (Production Engineering, Logistics and Project management)
Experience
19 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 4 Months

Senior Project Controls Engineer at Jacobs ZATE
  • Saudi Arabia - Eastern Province
  • My current job since September 2015

 Development of project integrated schedule on the basis of client summary milestones schedule in close coordination with project team for Project Proposal (FEED) and Detailed Engineering Schedules with Primavera 6.0 (level-III) to meet project objectives providing execution strategy of project
 Organize Interactive Planning Sessions to build-up WBS and structure of Level-III baseline schedule
 Assigning weight factor, preparation & leveling of S-curves, resource histogram preparation along with generation of weekly & monthly progress reports
 Preparation and updating DCL (Document Control Log) as per approved budget
 Responsible to update schedule and track deviations from baseline schedule with mitigation plan to achieve forecasted milestone for timely completion of the project
 Preparation of weekly & monthly progress reports, critical path analysis, variance analysis, impact analysis for better project progress visibility
 Trending and forecasting of all current cost, productivity, quantities and schedule data in order to identify cost variances from budget
 Setting-up gross margin targets by establishing bill rates and raw & burden cost in MPP (Manpower Staffing Plan) and calculation of To-Date Revenue, To-Date Raw & Burden Cost, To-Date Gross Margins and subsequently forecast the same at completion of project
 Elaborate the consolidated Cost Breakdown Structure on the basis of commercial budget as per procedure
 Preparation of Variation Notes as required for additional SOW, followed by submission of Change Notes to client
 Responsible for preparation of cost control deliverables, including the standard Total Installed Cost (TIC) report that summarizes the contract’s financial position, taking into consideration the impact of potential change notices, forecast manhours (Estimate To Complete) Provide planning and cost controlling support including variation notes (VNs), monitoring of milestones progress to prepare customer billing etc.
 Control and monitor project total expenditure including verifying and checking of invoices (labor and non-labor) and claims from suppliers, vendors and subcontractors ensuring all project expenditures are captured and properly recorded
 Analyze all cost components i.e. quantities, pricing, work hours, unit rates and schedule-related impacts
 Trending and forecasting of all current cost, productivity, quantity and schedule data in order to isolate and identify cost variances from budget
 Preparation of weekly expended man hours and chargeability reports
 NTPs (notice to proceed) preparation with back-up documents for monthly invoices
 Development of Work-In-Progress (WIP) & Estimate-at-Completion (EAC) forecasts
 Preparation of staffing plan with recent employee rates to produce balance cost to complete
 Preparation of weekly dashboard reports for higher management
 Monitoring & control of detailed schedule with gap analysis advising mitigation plans as needed. Additionally, considering the schedules from finish to start clearly determining the activities affecting the project duration
 Assessment of anticipated cost to assist in financial, schedule analysis and project cost flow forecasting
 Ensuring the issuance of Project Controls’ deliverables to project team & management with a high standard of quality
 Coordinate and develop project spend cost, reconciliation and variance analysis
 Preparation of Home Office Project Status Reporting (HOPSRs) and Operational Project Reviews (OPRs)
 Change Management with NTP logs, VN logs and S.O. summary tracking sheet thus updating DCLs accordingly
 Develop project close-out plans

Senior Planning Engineer at SNC Lavalin Fayez Engineering
  • Saudi Arabia - Eastern Province
  • October 2013 to September 2015

 Planning, scheduling & monitoring Project Proposal (FEED) and Detailed Engineering Schedules for GES+ Projects for Saudi Aramco with Primavera 6.0 (level-III)
 Prepare and organize Interactive Planning Sessions for gathering information from all discipline leads to prepare the structure of Level-III Baseline schedule
 Determining project scope with evaluation of milestones according to allocated man hours
 Segregation of discipline wise work loaded values reflecting project milestones & assigning respective area work load during WBS preparation
 Duration evaluation of project deliverables & their impact on milestones while generating relationships among activities
 Allocation of work with respect to studies / 3rd party and in-house scope
 Assigning weight factor (weightage) by preparing percentages for each workable item
 Preparation & leveling of S-curves based on loaded resources in terms of man hours
 Resource histogram preparation along with generation of weekly & monthly progress reports
 Prepare CPN (Commitment Package Reports) for proper traceability of TQs from MR’s preparation till Issuance of PO
 Identification of critical activities & critical path by applying CPM (critical path method) through PERT
 Periodically monitoring of project progress and performance through Primavera 6.0 & Earned Value Management reports (EVM) to analyze project index, CPI, SPI, TCPI, FTEs
 Revision of schedules by creating recovery / mitigation plans to arrest progress slippage or in case of a certain change in scope with particular addition or deletion of quantities through change management procedure
 Identification of delayed tasks by making delay analysis reports in light of comparison sheets
 Monthly scheduling of project schedules to analyze slippage
 Rebaselining of project schedules as per requirement i.e. deletion / addition of scope, catch-up schedule, fast tracking etc
 Active participation in Constructability sessions
 Preparation of complete resource loaded EPC Schedules in synchronization with ER Estimate package
 Follow-up with the procurement department to segregate long lead and other items while preparing matrix with lead delivery times which have an impact on their respective construction activities
 Prepare a logical relationship between Engineering, Procurement & Construction activities and manage total float as per the provided milestones in DBSP (Design Basis & Scoping Paper) documents provided by the steak holder
 Preparing the constructability studies with What-if scenarios i.e. EPCM, LSTK, LSPB, Hybrid Models etc.
 Preparation of final close out report at project completion with complete analysis & lessons learned
 Delivering presentations internally and externally (to client) for progress updating and project bottlenecks
 Preparation of MFL (Manpower Forecasting & Leveling)
 Working as a Change Management coordinator for all of the business lines to prepare Trends and PCN (Project Change Notice) if incase any change happens in the project’s nomenclature to calculate the schedule and cost impact.
 Updating the deviation logs for the mentioned changes accordingly
 Active participation in Monthly Progress Reports for the executive management while calculating budget & actual hourly rates trend, project dashboard, saudization report, KPI’s, project summary and achievements, quality and risk highlights

Lead Planning Engineer at M.S. Al-Suwaidi Industrial Services CO. Ltd.
  • Saudi Arabia - Jubail
  • September 2009 to August 2013

 Planning, scheduling and monitoring of construction and maintenance / overhauling projects
 Preparation of project deliverables for Kick-off Meetings of newly awarded project like baseline schedule with Primavera 6.0 (level-III), organization chart (OBS), manpower and equipment planning with resources mobilization schedule
 Determining project scope and finalizing activities as per work sequence, allocated cost and man hours
 Preparation of level-IV schedule reflecting milestones, constraints, floats, leads, lags and relationships development
 Assigning weight factor (weight age) by preparing percentages for each workable item
 Preparation and leveling of S-Curves based on loaded resources in terms of man hours or cost
 Resource histogram preparation along with daily and weekly progress reports consolidation
 Periodic monitoring of project progress and cost performance through Primavera 6.0 and Earned Value Management reports (EVM) to analyze Project Index (PI), CPI, SPI, TCPI, Earned Value (BQWP) and Actual Cost (AQWP) against Planned Value (BQWS)
 Direct involvement in execution activities with area engineers, supervisors, sub-contractors for achieving targets as planned and committed in schedule
 Revision of schedules by creating recovery and mitigation plans to arrest progress slippage in case of certain change in scope of work with particular addition or deletion of quantities through Change Orders
 Identification of delayed jobs by making delay analysis reports in light of comparison sheets, discussion of scenarios with execution team and actual site conditions
 Tracking and follow-up of material for a smooth progress flow by monitoring procurement progress
 Regularly performing critical path analysis; anticipating bottlenecks and highlights
 Preparation of final close-out report at project completion with complete analysis and lessons learnt
 Managing teams and mentoring junior professionals

Planning and Cost Engineer at Descon Engineering Limited
  • Pakistan - Lahore
  • January 2007 to August 2009

 Coordination in overall project activities by taking steward ship of assigned projects right from the pre-mobilization stage till final close-out related to planning and costing matters
 Preparation of project schedules from level-II till level-IV with Primavera 6.0 while obtaining concurrence from estimation and execution departments; budget preparation (BAC) followed by their revisions as per requirement
 Development and leveling of S-Curves based on loaded resources in terms of man hours or cost
 Liaising with and directing the work of sub-contractors assigned to the project
 Tracking, monitoring and updating project progress and material status by submitting weekly and monthly progress reports to the client along with cost controlling through Earned Value Management (EVM)Technique
 Prepare check lists for project invoices by ensuring release of all payments from the client through IPC (Interim Payment Certificate) and material claims through Comparative Statements
 Future forecasting like Balance Cost To Complete (BCTC) and Estimate at Completion (EAC)
 Assistance in negotiating contracts with the sub-contractors
 Evaluation and analysis of critical path by anticipating bottlenecks and main highlights for the Senior Management on weekly and monthly basis
 Preparation of final close-out report at the end of project with complete project analysis and lessons learnt

Simulation Engineer at Paper Technology Specialists
  • Germany
  • October 2005 to September 2006

 Involved in simulation activities along with completion of Master Thesis having title “Development of a Methodology for Standardized Evaluation and Optimization of Stock Preparation in Process Plants (Fast Moving Consumer Goods)” with evaluation of different process specimens with the help of Simulation Software i.e. IDEAS
 Optimization of the whole running plant by giving various solutions and suggestions to reduce energy losses

Project Engineer at Bulleh Shah Paper Mill Ltd, Packages Limited
  • Pakistan - Lahore
  • July 2003 to July 2004

 Working with consultant to develop feasible process design with reference to submitted scope of work, technical design, drawings and specifications, scope of work determination, proposal preparation and participation in selection of vendors and sub-contractors, supervision of various erection activities like work scope preparation, resource estimation and installation of rotary equipment, hydraulic and pneumatic systems etc.
 Preventive and pro-active maintenance of various mechanical parts (like shafts, bearings, mechanical seals, glands, couplings, pumps, filters etc.)

Education

Master's degree, Mechanical Engineering (Production Engineering, Logistics and Project management)
  • at Universität Duisburg-Essen
  • October 2006

Achieved maximum GPA in the masters thesis while having the title as "Best student of the year".

Bachelor's degree, Mechanical Engineering
  • at University of Engineering & Technology-Lahore
  • March 2003

Specialties & Skills

Projects Coordination
MS Office
Primavera 6
Primavera 3

Languages

English
Expert
Urdu
Expert
German
Intermediate

Memberships

Pakistan Engineering Council
  • Professional Engineer
  • April 2004
Saudi Engineering Council
  • Professional Engineer
  • January 2012

Training and Certifications

Primavera Advanced Training (Training)
Training Institute:
Oracle University
Date Attended:
October 2014
Duration:
40 hours

Hobbies

  • Travelling, net surfing