khalid obeidi, MEP Construction Manager .

khalid obeidi

MEP Construction Manager .

Al Futtaim Carillion

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
17 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 7 أشهر

MEP Construction Manager . في Al Futtaim Carillion
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ أغسطس 2012

MEP Construction Manager of, 2 High Rise Residential towers in the Burj downtown Dubai.

Responsibilities:

" Coordinate the MEP design and execution between design office and contractors/subcontractors.
" Provide the planning input for the MEP works and Monitor Planning vs. Progress on site.
" Able to review resource reports like (manpower histograms, plant and machinery schedule) and ascertain adequacy of resources deployed for timely completion of the project .
" Audit the performance of MEP subcontractors.
" Implement/follow proper QA/QC procedures by maintaining and following Project QA/QC Manual .
" adept in and aware of International and Local Building Codes of all MEP Systems.
" Have hands on experience on the procurement, installation and testing & commissioning of all MEP Systems.
" To ensure compliance of construction activity to best industry standards, international codes, planned
timelines, allotted budget, company strategy and goals.

Project Engineer. في Hastie International
  • الإمارات العربية المتحدة
  • يوليو 2010 إلى يونيو 2012

07.2010  6-2012

Designation: Mechanical & Plumbing Project Engineer MEP Division
Project: UAE University Al Ain (Abu Dhabi) 07-2010 6-2012


Designation: Mechanical & Plumbing Project Engineer MEP Division
Project: Arzanah Medical Hospital 08-201112-2011


Responsibilities:

" To establish method statements, material submittals and measures for successful and efficient working condition at site.
" To study the relevant international and local standards, regulations and practices and adopt the applicable standards, codes, regulation and local practices.
" Ensure that the quality of material and installation of works are in accordance with the project requirements, specifications, approved method statements and approved material etc.
" Day to day coordination with Consultant, Main contractor and the Client.
" Preparation of work schedule, Manpower schedules, bill of material and float the enquiries for subcontract works and Material suppliers etc.
" Review and reporting system performance, staffing, costs, incidents and emergencies, remedial and corrective actions and measures to avoid future incidents or accidents.
" Carry out necessary follow-ups with vendors, suppliers and sub-contractors for timely execution and delivery of the ordered items for the timely completion of the project.
" Respond to emergency conditions as and when the necessity occurs.

Project Engineer. في Eagle Electromechanical Co. LLC
  • الإمارات العربية المتحدة - دبي
  • أكتوبر 2006 إلى يونيو 2010

Designation: Mechanical Project Engineer
MEP Division
Project:Duja Tower, Sheikh Zayed Roadm 8-2009 - 06-2010
50 storey residential tower with ground level and basement parking, served by district cooling system.

Project:Dubai Maritime City, Labor Accommodation Complex 01-2008 -08-2009

12 storey residential building with 3 podiums (comprising retail, food and beverage outlets and commercial leasable spaces), separate parking building and mosque.

Designation: HVAC Site Engineer MEP Division
Project: Palm Jumeira Shoreline Apartments - Package 2 10-2006 - 01-2008
Complex of 6 luxuries residential buildings (comprising 9, 10 and 11 storey), ground floor, basement parking.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Applied Science University - Jordan
  • يناير 2006

Mechanical Engineering

الثانوية العامة أو ما يعادلها,
  • في Latin Patriarchate School
  • يناير 2000

Specialties & Skills

Preventive Maintenance
MEP Engineering
Building Materials
Building Services
Construction Safety
Construction Engineering
Preventive Maintenance

اللغات

العربية
متمرّس
الانجليزية
متمرّس