Electrical Relays Company
Total des années d'expérience :7 years, 2 Mois
From April 2012 . Until now
Name of employer E.R.C (Electrical Relays Company)
Work Location: Saudi Arabia - Alriyadh
- Modification and upgrading for protection schemes in medium voltage substations (13.8KV, 33KV)
- -Installation and Commissioning of protection schemes (Stuck breaker, bus bar protection, Over current & earth fault)
- -Testing of Reyrolle, ABB, Siemens & AREVA protective relays using FREJA300 device &SVERKER.
- Applying all tests needed for CTS, Power Cable & Power Transformer.
- -Supervision of drilling and extension and testing medium voltage cables (single core & three cores)
1- Electricity Sector Qena - Upper Egypt Electricity Distribution Company
From March 2007 TO April 2012
Work Location: Qena - Egypt
- Training of engineers and technocracy employees of the company to operate and maintain and test transformers and kiosks.
- Training of engineers and employees of the company technocracy on the operation and maintenance of medium voltage distribution boards and low its components (C.T - V.T - Circuit Breakers - Batteries & Chargers)
- Installation, maintenance and test equipment protection against over current and ground leakage of various types.
- -Maintenance and testing of networks medium & low voltage in work place. -Installation and maintenance of distribution boards medium and low voltage.
- Installation and maintenance of distribution transformers.
- Supervise the installation of medium voltage cables and low.- - Test and identify faults electrical cable faults using the devices determine the tasks of network medium and low voltage.
- Experience in the use of cars tested cables kinds (HDW - SEBAKMT)
- Programming and installation of digital energy meters and calibration.- - Executive for power factor correction (LV)
(2) Testing & Commissioning Engineer for SEC (Saudi Electricity Company) as main contractor
مجال الوقاية والاختبارات
• Aswan South Valley University. • Faculty of Engineering. • Department of Electrical Engineering Machines and Power Section. • B.Sc. Grade: Excellent • Cumulative Grade: Good • Year: May 2003 • Project Grad: Excellent • Graduation Project: Three phase induction machine feet from single phase supply by capacitor bank