khursheed Akhtar Sheikh, Superintendent

khursheed Akhtar Sheikh

Superintendent

Arabian BEMCO Contracting Co. Ltd

Location
Saudi Arabia - Jeddah
Education
Diploma, Subject Electrical
Experience
16 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 8 Months

Superintendent at Arabian BEMCO Contracting Co. Ltd
  • Saudi Arabia
  • June 2009 to June 2009
Electrical Supervisor at Al Hafiz Crysto Plast Co. AHCP. (PET Bottling Plant )
  • Pakistan
  • July 2007 to January 2009

Supervision of Electrical system Operation LT room & HT room (Operating Metering & VCB Panels LT room operating switch Gear, MDBs, SDB and Distribution panels
• Supervision of preventive maintenance of PLC controlled” HUSKY “Injection machines, (hypet 225 &hypet 400), Made in Canada, Krones S-10, Blowing machine Germany made.Supervision of Running Electrical Project LT ant HT work
• 3.5MW Power supply complete installation HT cables, 2x1500 KVA Transformers, MV and VCB panels,
• LT work installation of new machines, Cabling for machines
• Installation of SDB, MDB, panels, Termination of Power cables
• Installation of 01 MW Gas Gen set Caterpillar CAT“ 3516 B
• Installation& Operation of synchronizing MCCB panels

Electrical Assistant at RED SEA CO
  • Saudi Arabia
  • March 2002 to January 2007

Supervision of Electrical work in Fabrication
Construction of Multipurpose Modular Units.
•Installation and termination of MDP, SDP, MTS, and GEN SET,
•Installation, Termination & Testing of Portable Hospital Buildings, accommodationFacilities, Commercial kitchens Equipment’s installation, testing of motor pumps control centers.
•Installed Fire alarms System (NOTIFIRECO, LIFCO), FACP SYSTEM with optical smoke detector, heatdetector, manual call point, strobe flashing light/ horn, installation, testing and commissioning with Saudi Armco inspectors.
Projects Completed with RED SEA

Supervisor at Saudi Armco Sites, Haradh ,Hayiha, Kohrise Gas Plant •BGP Chinese Company in Uhdalyia •Saudi Special Forces Dhahran •Saudi Chevron Chemical Plant Jubail •SAMSUNG ARABIA CO. Projects ,Al Sharq Expansion Plant , Tasneeh Chemical •Plant , SIPCHEM JUBAIL •Arabian Drilling Company ADC. Near AL HAFOOF Area •DALMA RAWABI Drilling Company , AINDAR , HAFOOR
  • United Arab Emirates
  • January 2000 to January 2002

Maintenance of Electro-Mechanical IndustrialMachines, Preventive Maintenance as per schedule.Repairing and maintenance of AC DCMotors Control System, pneumatic controls, sensors, proximity switches, LT Switchgears, and Control Panels Activities.

Team Leader at Bazy Trading & Contracting Co. DC Power Solution
  • United Arab Emirates
  • January 1998 to January 2000

Supervision for Installation & Commissioning Of DC power System, UPS, Inverters and installation of DC Batteries Banks, charging and Discharging Of Batteries Banks at different sites

Team Leader at Saudi Aramco, • STC Saudi Telecom Company • SEC Saudi Electricity
  • United Arab Emirates
  • January 1994 to January 1998

Installation & Commissioning Of Lights, Power Distribution Panels, External Lighting, Land Escaping Lighting, Garden Lighting & fountain, swimming pool lighting Etc.
•Installation of Cable Trays H.T.& L V Switch Board Cable’s Terminations
•Installation of Motors, Cable’s Termination, and Control Cables Installation, MotorControl Centers and Disconnect Switches
•Fire alarm system, CCTV

Electrical Supervisor at Eco Pac Ltd. Pakistan ( PET Bottling Plant)
  • January 1992 to January 1994

Latest PLC controlled Machines Erection, Installation cable Termination, testing & commissioning with German & American Engineers.Supervision of Operation and Preventive maintenance Multifunction’smachines. Repairing and Maintenance of AC DC Motors

Man Management

•Directing, leading & motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency.
•Working on succession planning of workforce, appraising the member’s performance & providing feedback.

•Leading a team of workers/Foremen/GLs to achieve optimum performance of the system and equipment.

Project at BK 5190813
  • Saudi Arabia
  • to

Construction of Substation 110/13.8

Superintendent
  • to
Area
  • Saudi Arabia
  • to

To carry out Site works at Power Plant. Erection & Commissioning of all equipment’s related to Power Plant

Superintendent at Arabian BEMCO Contracting Co. Ltd
  • Saudi Arabia
  • to

Power Plant #10 4600 MW Riyadh
Power Plant #12 2175 MW Riyadh
Substation 110 /13.8 KV Jeddah Saudi Arabia
“It would be the World’s Largest Combined Cycle Power Plant”.

•MAJOR JOB RESPONSIBILITIES ARE SUMMARIZED BELOW:


To carry out Supervision of Electrical Erection and Commissioning works for

• 62.5MW GE make Gas Turbines based generator units
• GE- Generator Units, Turbine accessory compartment
• GSU & distribution transformers(13.8kV, 4.16kV, 480 V)
• MCC’s-GE Make, 13.8kV segregated bus duct,
• HVAC Units, AC/DC DB’s, Non-segregated Bus Ducts
• TCP and GCP-(Turbine and Generator ControlPanels)
• All Aux. System motors, Cooling water and Fan Motors
• GNAC and GLAC, Cooling Water modules
• Wash Water skids, CO2 Skids
• Fuel Management system, Misc. Systems & Equipments
• Battery charger and discharger, Grounding grid System
• Duct banks installations, GE make AC & DC MCC’s,
• GE Make Mark Vie
• Water Treatment Areas, Tank Farm Areas, All BOP’s
• High Masts, Generator and GSU transformer protection & control panels,
• Aux. transformer protection panels,
• GEDAC and Power con make 13.8kV Unit switchgears,
• 13.8kV/4.16kV/480V switchgears,
• ABB make LV switchgears, LV DB’s
• Ex-heat make crude oil heater panels
• Cable Termination (Torqueing and Meggering)
• To supervise the changes implementation in panels and red-mark drawings
• Installation of Ladder and Cable trays, conduits (RGS, EMT & PVC coated RGS) PVC, Junction boxes & Distribution Boxes
• Installation of Pit, network, joint (CAD welding) equipment’s
• Supporting and Arranging Material for all Sub-Contractors i.e. Truba Arabia, Al JORAID, HUNDAI, BEMCO SERVICES, CHLORIDE,
• Documentation of Site work, SIF, SMRF, SLMF, after work completion
• Arranging Work permit for subcontractor for Energization and Punch List activities.

Education

Diploma, Subject Electrical
  • at Government Poly Technic Institute Haripur , Peshawar Board Pakistan
  • January 1991

Specialties & Skills

Languages

German
Expert