Mustafa Kocak, qa qc electrical engineering expert

Mustafa Kocak

qa qc electrical engineering expert

Assystem Engineering

البلد
تركيا - قيصري
التعليم
بكالوريوس, Electrical Engineering
الخبرات
14 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 5 أشهر

qa qc electrical engineering expert في Assystem Engineering
  • تركيا - مرسين
  • أشغل هذه الوظيفة منذ يوليو 2022

Akkuyu Nuclear Power Plant Electrical engineering expert in Assystem Company.

Electromechanical Project Manager في TÜMAŞ AŞ
  • تركيا - قيصري
  • أكتوبر 2020 إلى يوليو 2023

TÜMAŞ is the first state owned Construction &Consulting Company in TR located in capital city Ankara. It has several offices based on nation-wide construction sites and abroad sites. In Kayseri Light Rail Transportation Project, we are building tram line having 5.5kms length and 3 substation&control buildings. I am working as Electromechanical Works Control Chief. This is a FIDIC contract. www.tumas.com.tr • Examining and revising engineering calculations and electromechanical drawings • Inspecting and determining of Electrical materials and equipment to be used in the project. • Guiding contractor for site work and project planning. • Electrical work done on substation buildings: HV installation, commissioning, and testing of power transformers • Setting up and fine adjusting of catenary lines • Checks and audits of the tram line signaling system's design • Feeder lines from 31, 5 kV AC to 750 VDC, point devices, signaling cabinets, and AC & DC relays—SEPCOS
TÜMAŞ, Konya, TR October 2020- March 2021
Electrical Control Engineer I worked in Konya New Train Station Building and Surroundings project. This project included a vast building and 5 new platforms which has separate train lines extending 6 kms. • I participated in the construction of the Konya New Train Station building and its surroundings. This project featured a sizable structure as well as five new platforms with distinct train lines that extend 6 kilometers. • Controlling a project includes calculations for electricity, short circuits, lighting, etc. • Examination and approval of the project's intended usage of electrical materials • TCDD and national regulations are followed for the control of electrical systems. • Followed the displacement work of the catenary line on the operational Konya-Ankara railway. • Platform installations for controlled catenary lines

Electrical Engineer في ELSITEL Elektromekanik Insaat Proje Ticaret ve Sanayi A.S.
  • تركيا - كونيا
  • أكتوبر 2018 إلى أبريل 2020

The Elsitel Company is based in Ankara and has offices throughout Turkey. The company specializes in the engineering and construction of railroads. I was employed at a maintenance facility for the Konya-Ankara railway. www.elsitel.com.tr
• Leading the maintenance crew and supervising maintenance activities.
• Planning site activities. Organizing labor.
• Reporting to the project manager
• Working on the site throughout the day and night shifts
• Repairing 27500-volt railway high-voltage lines
• Measuring catenary line deviations with high-tech components

Sales Technical Manager في Wayne Company part of Dover Corporation
  • تركيا - اسطنبول
  • سبتمبر 2014 إلى أبريل 2018

Founded in 1891, Wayne Company is a leading maker of petroleum solutions for fleet and retail use worldwide. Wayne offers technology advancements across a range of sectors, including railway project solutions, security that complies with regulations, multimedia marketing, and site control systems. As a Technical Manager for ME projects, I adhered to local project criteria. • Work with the sales team to coordinate reciprocal site visits and technical briefings for clients. Ensure ASO contractors follow Wayne requirements (contractual quality, safety, response, repair, and reporting standards). • Review tender requirements, offer assistance with product configuration in light of customer expectations • Provide technical assistance for Wayne products, such as automation systems and electrical design. Prepare cost reports for customer technical claims. • Working with multinational software development teams to test and ensure the quality of desktop and web-based commercial application software for petroleum automation on a global scale. • Examine the requirements, specifications, and technical design documentation. • Track bugs until they are eliminated in accordance with quality assurance guidelines. • Keep an eye on metrics for quality assurance, like defect leakages, defect trends, etc., and contribute to process improvements. • Work together with the product's consumers and stakeholders to resolve any software issues • On-site testing of payment systems coupled with Wayne Automation Systems • Examining real-world issues (initial site visits, problem documentation, bug reports, etc). Gather all relevant data regarding field issues so that you may look for trends and identify the underlying causes. • Oversee the process for fixing ongoing problems (develops update and roll-out plans using reputable project management techniques).

Technical Support Engineer في Mepsan Petroleum Equipment , Turkey
  • تركيا - كونيا
  • يناير 2012 إلى سبتمبر 2014

Based in Konya, Turkey, Mepsan Petroleum Equipment manufactures fuel dispensers and automation systems. For retail stations, Mepsan offers automation systems and engineering projects (such as fuel piping systems, site maintenance activities, and environmental projects). The business exports to more than 30 nations and is among those in this sector with the fastest growth rates. I serviced international clients while working in the after-sales department. Technical support for Mepsan Fuel and LPG/CNG dispensers • Project management tools for managing petrol station automation systems projects; planning for materials and manpower • Commissioning of petrol station automation system; resolving automation system problems • Conduct distributor training at the factory or on-site (for example, in Ethiopia, Spain, Jordan, Libya, Tunis, Iraq, Ghana, Sudan, Albania, Georgia, Azerbaijan, Egypt or any other country) • Present ideas to the production and R&D departments based on feedback from the site

Electrical Engineer في Tekfen Construction
  • ليبيا - الجوف
  • يونيو 2008 إلى يوليو 2010

A famous 500 M$, 383 KM water pipe project was involved, and it was intended to transport about 100 MGD from the Libyan desert to coastal towns. I was in charge of planning and managing Cathodic Protection system site operations.
• Scheduled and planned site activities
• Pre-commissioning tests were conducted, and organized labor was used to monitor site operations in accordance with project specifications, check materials for anodes, header cables, permanent reference electrodes, test boxes, and chemical backfill.
• Repairing LV generators, electrical instruments, circuits, electrically controlled cranes, and the batching plant system; maintaining the camp's electrical system
• I suggested changing the cable margins in accordance with the pipeline's cover depth, and I was able to save about 2000 meters of cables as a result.

Electrical Engineer في Fernas Construction
  • قطر - أم سعيد
  • أغسطس 2007 إلى أبريل 2008

I contributed to the $100 million Mesaieed SR2 LNG Station construction project for Qatar Petroleum. My duties included: Grounding station operations (laying cables and joining with earth rods); and Communication operations between two stations.I created as-built drawings in AutoCAD and separate drawings detailing technical specifics to help improve the team's installation quality. Power & Instrumentation wire laying, preparing electrical infrastructure before installation.I got a great deal of expertise in interpreting and adhering to instructions, schematics, and other specifications.

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Istanbul University
  • يوليو 2007

اللغات

العربية
متوسط
الانجليزية
متمرّس
التركية
اللغة الأم

التدريب و الشهادات

English as a Second Language, KBCC, New York in class- Not online (الشهادة)
تاريخ الدورة:
April 2011