Civil Engineer
Engineering Consultancy
مجموع سنوات الخبرة :5 years, 0 أشهر
A. Hydropower Project
• Detail Engineering Design of Radhi Hydroelectric Project (4.4MW), Lamjung, As working team (Alignment, Detailing of components, Estimating and Reporting)
(Running)
• Detail Engineering Design of Trisuli Hydroelectric Project (2.8MW), Dhunche As working team (Alignment, Detailing of components, Estimating and Reporting. (Completed 2069)
• Feasibility Preparation of Sabha Khola Hydropower Project (10 MW), Sakhuwasawa As working team.
(Completed 2069)
• Detail Feasibility Preparation of Kimtang Small Hydropower Project (580 KW), Lamjung As working team (Alignment, Detailing of components, Estimation and Reporting)
(Completed 2068)
B. Bridge Project
RCC/Steel Bridge Design /Estimation/Drawing/Report
preparation as Working Team
o RCC Cha-Khola Bridge, Kavre (span=21.0m)
- DDC, Kavre (Client) (2012)
o RCC Causeway, Rupandehi (Span=49.0m)
-Inclusive, Bhaktapur (Consultant) (2012)
o Parchhetta Steel Bridge, Dadeldhura (Span=140.0m)
-Inclusive, Bhaktapur (Consultant) (2011)
o Bhudera RCC Bridge, Parsa (span=24.0m)
-RIDC, Baneshower (consultant) (2011)
o Amdevi RCC Bridge, Parsa (span=24.0m)
-RIDC, Baneshower (consultant) (2011)
o Bhudera RCC Bridge Parsa (span=22.0m)
-RIDC, Baneshower (consultant) (2011)
o Sabaiya RCC Bridge Parsa (span=21.0m)
-RIDC, Baneshower (consultant) (2011)
C. Building Project
Sanitary Design & Estimation
A. National Projects
a) School Building
i. Tri-Judda School, Birjung (2010)
ii. Ridi School, Gulmi (2010)
iii. Muglin School, Muglin (2010)
iv. Janakpur School, Janakpur (2010)
v. Pratima School, ( Under Design) (2011
b) Office cum Residential
i. DUDBC Office cum Residential, Kavre(2010)
ii. CDO Office ( Jhapa, Sindhupalchowk, Lamjung, Gorakha, Dhangadi, Rupandhehi, Ilam so on) (2010)
iii. DTO office, Malpot, Public service commission, Barrack, and related more project.
c) Apartment
i. Karmachari Awas, Darchula (2011)
( As Sanitary consultant)
B. International Projects
a) Master Plan Preparation of Water Supply and Sanitary Projects of Aga Khan Foundation, Afaganisthan
a.1) Bharakha School, Bharakha
- Construction Completed (2010)
a.2) Public Health Building, Bharak
- Construction Completed (2010)
a.3) Kisim Regional Hospital, Kisim - Under Construction (2011)
a.4) Bharakha Regional Hospital, Bharakha
- Under Construction (2011)
a.5) Bharaakha Rustaq Hospital, Rustaq
- Under Construction (2011)
Master in Geo-Technical Engineering in Pulchowk Engineering Campus, Lalitpur (Continue from 20011 ) Tribhuvan University, Kathmandu Nepal Bachelor in Civil Engineering from Pulchowk Engineering Campus (2005 to 2009) Tribhuvan University, Kathmandu Nepal in First division. Diploma in Electrical Engineering from Tribhuvan University, Institute of Engineering , Western Region Campus Pokhara Nepal (2000 to 2003) in first division. School Leaving Certificate from Siddhartha Secondary School, Hetauda, Nepal (2000) in first division.