SITE SUPERVISOR'
EMIRATES TECHNICAL ASSOCIATES
مجموع سنوات الخبرة :21 years, 7 أشهر
EMIRATES TECHNICAL ASSOCIATES, (M&E DIVISION)
ABU DHABI, UAE
'SITE SUPERVISOR' from 4 May 2010 to till date.
RESPONSIBILITY
SUPERVISING THE FOLLOWING WORK FIELDS INDEPENDENTLY
• L.V & H.V Panel Board Erection and Termination & L V Cable.
• Installation & Commissioning of BMS, CCTV, PA System.
• Installation of fire alarm system.
• Power & control cable cladding termination.
• Erection and commissioning of All type of security system.
• Pre-plans the daily work schedule for the workforce to check that the equipment, material & manpower employed by the management are adequate to implement jobs, handling methods,
principles, practice and equipment of fire prevention.
• Perform technical reviews of drawings, material inspection reports, delivery schedules, instruction
manuals & Contractors shop drawings, Writes completed job reports and sends mails on related
subjects
PROJECTS INVOLVED:
• JW MARRIOT ABU DHABI RESORT HOTEL AND SPA,
A seven star Hotel Consisting of 10-Hotel buildings, 85-chalets, Marina building and
Spa building, Located in the Abu Dhabi, UAE
Client: Abu Dhabi National hotel
COMPANY NAME:
MKO FACILITES MANAGEMENT, DUBAI UAE
'FACILITIES FOREMAN' From April 2006- May 2009.
RESPONSIBILITY
• Operation and maintenance of electrical equipments.
• 2500 amps ACB, Main LT Panels 360 KVA DG Set, operator maintenance.
• Maintain the common area
• Attending all kinds of complaint.
• Maintain the chillers chiller pumps as well as the garbage chute, sauna and steam bath.
PROJECT INVOLVED: Mercato Town center (DUBAI),
Garhoud Views (DUBAI),
Mall of Emirates & Marina crown (DUBAI)
COMPANY NAME:
JONES LONG LASALLA, Bangalore, INDIA
'EXECUTIVE SUPERVISOR' From April 2005- May 2006.
RESPONSIBILITY
• Operation and maintenance of Electrical equipments in the facility i.e. 2 × 1600 kva Universal
transformer, out door H.T Kiosk, ACCP, main LT Panel, MCC Panel.
• 2500 amps ACB, Main LT Panels 360 KVA DG Set, operator maintenance.
• Diesel generators operate and maintenance of 2 × 1250 kva and 600 kva Sets maintenance of S.T.P and W.T.P.
• Maintenance of common area
• Attending all kinds of complaint.
• Taking down all electrical parameters.
COMPANY NAME: S.K. ENTERPRISES, BANGLORE, INDIA
'Supervisor' From 2002- 2005.
Site: INDIAN INSTITUE OF INFORMATION TECHNOLOGY, B' LORE
JOB RESPONSIBILITY
• Operate and Electrical maintenance of 65 kva and 300 kva D.G. Set
Site: DELL WHITE FIELD, BANGLORE
JOB RESPONSIBILITY
• Operation and maintenance of all electrical, D.G Set 2 × 750 kva
Site: RMZ TITANIUM, AIR PORT ROAD, BANGALORE
JOB RESPONSIBILITY
• Operation and maintenance of all electrical, D.G Set 2 × 250 kva and 3 × 500 kva
Site: BHARAT TELESONI LTD, BANGALORE
JOB RESPONSIBILITY
• Operation and maintenance of DC Power plant 2 × 65kva UPS, Split A/C unit up to 11 KVA TR,
180 kva & 320 kva D.G Set
COMPANY NAME:
EMIRATES TECHNICAL ASSOCIATES, ABU DHABI, UAE
"Sr.Electrician" from 17 September 1996 - 25 November 2002
PROJECT INVOLVED:
Site: ABU DHABI FOR ONSHORRE OIL CORPORATION, ABU DHABI, UAE
JOB RESPONSIBILITIES
• Erection and commissioning of Electrical and DG Set
• To maintain electrical substation
• UPS for main work station ( 350 kva × 2 nos)
• Erection and commissioning of fire alarm system and Light com system
Site: AL MUHAIRY COMMERCIAL CENTER, ABU DHABI, UAE
JOB RESPONSIBILITIES
• Erection and commissioning of electrical equipment
• Wiring, cable gladding, termination of power and control cables
Site: ABU DHABI NATIONAL OIL COMPANY, RUWAIS, UAE
JOB RESPONSIBILITIES
• Erection and commissioning of liquid deduction
• Erection and commissioning of Inergent Gas System
• 4 Sq.mm cable and 600 Sq.mm cable gladding and termination
Site: ETISALAT CUSTOMER SERVICE BUILDING, ABU DHABI, UAE
JOB RESPONSIBILITIES
• Erection and commissioning of electrical equipment
• Installation of fire alarm system
• Installation of C.C.T.V
• Installation of Security system
• Installation of Building Management System
• Carry out the preventive maintenance
• Electrical Operation and maintenance
• Operation and maintenance of 2500 kva × 2 nos
• Access control systems
COMPANY NAME:
M/S POWER EQUIPMENT AND SYSTEM LTD,
Bangalore, India
'EIECTERICIAN' From 1995 to 1996.
RESPONSIBILITY
• Operation and maintenance of electrical equipments.
• Transformer windding.
• trouble shooting of Electrical system
• Attending all kinds of complaint.
• Installations and maintenance electrical Equipments Carried out.
M/S VINAYAGA ELECTRICAL, KOLAR GOLD FIELDS,
Karnataka, India
'Sr. EIECTERICIAN' From 1991 to 1995.
RESPONSIBILITY
• Operation and maintenance of electrical equipments.
• Wiring, cabling and gladding of electrical System.
• trouble shooting of Electrical system
• Attending all kinds of complaint.
• shutdown maintenance in various High rise low rise building.
COMPANY NAME:
• Giving job to Sub-Contractor.
• SSLC: Passed in the Year 1983 from Karnataka Board.