KURUVILLA ITTYIPE, PROJECT ENGINEER

KURUVILLA ITTYIPE

PROJECT ENGINEER

SUMITOMO CORPORATION

البلد
الإمارات العربية المتحدة
التعليم
بكالوريوس, Electrical
الخبرات
31 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :31 years, 3 أشهر

PROJECT ENGINEER في SUMITOMO CORPORATION
  • الإمارات العربية المتحدة
  • يناير 1999 إلى يناير 2009

Carried out Transco project N 5140 of installation Double circuit 1 core 2500sqmm 400kv cable from ADST Substation in Abudhabi Meena area to Al Reem island through intermediate island of Al suwa and crossing 3 sea channels involving 12 cable end terminations and 30 joints and 6km of cable.The project is to be finished within 1 year .project awarded;june2007, completion on sept 2008 complete with testing and commissioning, endorsed by Energisation.The consultants for the project is PB Power, US
2)MEW (ministry of Electricity and Water Dubai Project -Emirates national Grid of interconnection of Taw 400kv substation with Dubai H station for transferring power between two emirates was awarded to sumitomo and to be completed within 1 year.contract no MEW/E01/2003.The consultants for the project was EDF, France
The scope of works included :
1)modification of existing GIS bays 2nos for adaptation of OHL feeders by changing current transformers, voltages transformers, and adding up Gas insulated Bus Ducts with Lightning arrestors, Line bushings, isolators, installation, testing and commissioning \[HITACHI MAKE\] (2)2x40mvar shunt reactors installation, connection with GIB and oil filling and regeneration at site, testing and commissioning \[FUJI-JAPAN\] (3)supply, installation, testing, commissioning of 2x48v battery chargers and DC distribution boards and battery bank \[CHLORIDE MAKE\], and feeder wiring for steady power supply to panels and for protection and indications (4)supply , installation, testing of SER, FMS panels for remote monitoring \[ABB Make\] (5)integration with LDC (Load Dispatch Centre) in Abu Dhabi for the alarm trip signals and remote control of the equipments through RTU/Telecom systems \[ABB make\] (6)Tariff metering system for the tariff demand \[semen’s make\] (7) Grounding and Earthing system for the shunt reactors, installation and testing (Furse ) (8) Fire fighting protection system for the shunt reactors \[Minimax-Germany\] (9) Supply of spare parts, doucmenation preparation, approval from Transco/stores, adwea CMMS section, and final handing over delivery at Transco central stores (10) carried out all documentation works, keeping site test records, manuals, records, snag list clearance, submission of the final records to client/engineer, preparation and submission of project completion report, obtaining FAC under process.Project completed in record time and energized
3)contract no N-00-106 Extension of Taweelah 400kv sub station with 14 bays consisting of Bus section, buscouplers, Generator bays, OHL Bays was awarded and to be completed within 21months from Transco with all ancillaries and protection systems.The project was completed without penalty in time and energized and FAC obtained. The consultants for the project was m/s LAHMEYER INTL GmbH, Germany. The following were the scope of work (1)Extension of the existing building by another 11o m for the GIS hall, provision of EOT crane \[Hitachi make\] (2)Provision of HVAC to the building, testing and commissioning \[CARRIER\]. (3)Provision of Fire fighting protection to whole building, testing and commissioning as per the norms of Transco complete with warning signs fire extinguishers, labels etc \[Minimax-Germany\]. (4) supply, installation, testing and commissioning of 400KV GIS, current transformers, voltage transformers, cable sealing ends, OHL bushings, lightning arrestors \[Hitachi make\]. (5)Supply and installation of relay protection panels for OHL/Generator cable feeders, testing and commissioning up to energisation, Bus bar protection, Breaker Failure protection \[ABB make\] . (6)installation of SER/FMS for monitoring time tagged events and integration with Transco E4 central station at Abudahbi (7)integration of alarms /trips from GIS/Protection with Load Dispatch centre Abudhabi through RTU/SPIDER to make available remote monitoring and measurements from LDC\[ABB Switzerland\]. (8)supply installation and testing of Mimic PANEL in the control room for all GIS bays and testing and commissioning of the local /remote panels located in TAW B(TAPCO)power station. (9)supply, installation, testing and commissioning of LVAC 415V panels \[ETA make. (10)supply installation of 2x110v Battery bank, 2xbattery chargers, 2xDC distribution boards, testing and commissioning \[CHLORIDE MAKE-FRANCE\] (11)Supply installation of 2x1000kva 415 v transformers for LV supply, testing and commissioning \[PAUELS MAKE\] (12)All documentation works, including preparation of method statements, work permits, safety clearances, energisation procedures, preparation and submission of records to client, project completion report, snag list clearance and obtained FAC (4)CONTRACT. N-99-0212 220/33/11KV at Samha for a 220 kv substation for Trasnco-Abudhabi and 33/11kv substation forADDC -Abudhabi.in a duration of 21 months. The project consultants were M/S LAHMEYER INTL GmbH, Germany.The following is the scope of works which were completed and the station energised without any PENALTY. FOR TRANSCO (1) 220kv GIS substation building, control building, fire fighting pump house, Gantry foundations, cable trenches civil works with ancillaries like Fire fighting system, HVAC system, Lighting inside building, and street lighting, compound wall etc (2)9x220kv GIS bays with LCC panels, supply installation testing and commissioning \[HITACHI MAKE\] (3) 2X140MVA, 220/33kv transformers supply, installation, oilfilling, regeneration, testing and commissioning \[FUJI -JAPAN\] (4) Gantry Errection of support bushings, Lightning arrestors and bus ducts (5) modification of 2 no of GIS bays in AL Shahama East s/s, supply installation testing commissioning of 2xno GIS bus ducts terminating into OHL gantry bushings to a length of 200meters with SF6 gas monitoring panels at each section of the bus duct integrated into GIS bays \[HITACHI -JAPAN\] (6)all modifications in protection panels related to 2 bays for teleprotection schemes, Fiberoptic cable installation from the end tower to new panels installed in shahama s/s for signal transmission between shahama and samha s/s, testing and commissioning, SER system provision for the modification done in shahama s/s . (7)SCMS system in central control room in samha s/s for monitoring and control and integrate with LDC in Abudhabi \[ABB-SWEDEN\] (8)Telecom system for communication with LDC \[ABB-SWITZERLAND\] (9)Supply, installation of protection panels with Relays, testing and commissioning for feeder protection, Bus Bar protection, Breaker failure Protection, \[ABB make\]. (10)2x110v DC battery bank and 2x48v DC battery bank, Battery chargers, DC distribution panels, DC emergency lighting provisions installation, testing and commissioning. (11)supply, installation, testing and commissioning of 415v LVAC board with safe AC system and uninterrupted supply system \[ETA make\] (12)supply installation, testing and commissioning of Black Start Diesel Generator as stand by supply FOR ADDC (1) 34XNO 33KV GIS bays in a stand alone 33kv GIS room supply, installation, testing and commissioning, \[ALSTOM make Germany\] (2) 28xno 11KV GIS -Supply, testing and commissioning \[ALSTOM make\].in a dedicated 11kv GIS room. (3)2x40mva 33/11kv transformers supply, installation, testing and commissioning \[ALSTOM make\]. (4) 2x1000kva 11kv/415v transformers, supply, installation, testing and commissioning\[PAUELS-BELGIUM .(5)supply installation of 1xc 630mm2, 33kv cables, 11kv cables between 140mva transformer to 33kv GIS bus and between 33kv GIS to 20mva transformers and to 11kv GIS, Testing and commissioning. (6)Supply, installation, testing and commissioning of protection panels with ABB relays (7)SCMS system to monitor and control remotely from LDC Transco control room at Abudhabi \[ABB make\] (8)Telecom system for LDC communication with all adaptations in intermediate stations around7 stations, testing and commissioning \[ABB Switzerland\]. (9)2x110v DC battery bank, charger panels, DC distribution panels for DC supply, installation, testing and commissioning \[CHLORIDE make\] (10) LVAC 415 v panels, supply, installation, testing and commissioning.\[ETA make\] (11)HVAC system for cooling the building \[CARRIER, US, VOLTAS\] (12)Fire fighting system for the entire 33/11kv substation building install, testing, commissioning \[minimax-Germany\] (13)cable basement, design, errection, fixing and clamping in ladder system
(6) Contract Transco N-90-0155-220KV/33KV substation -Al Ain city centre with all ancillaries.Duration 21 months .Project conusultants:Mott mac Donald .The scope of works similar to SAMAHA 220KV /33KV Substation in the same period (7)CONRACT WED/WS/PD-249-98at Taweelah -EXTENSION for 7 GIS bays with all ancillaries, protection systems with Bus bar protection/Breaker Failure Protection, feeder protection, SER, FMS.The project consultants were LAHMEYHER INTL GmbH, Germany for 3GIS bays and Emirates CMS power company US for 4GIS bays.

Consultant Engineer في Tractebel
  • الولايات المتحدة
  • يناير 1999 إلى يناير 2009
RESIDENT ENGINEER في TRACTEBEL ENERGY CONSULTANTS
  • يناير 1994 إلى يناير 1999

(8) CONTRACT WED/PS/AD-165/91 TAWEELAH B POWER PLANT +DESALINATION- Consultants:TRACTEBEL, Main contractor Power station -ABB KRAFTWARKE Germany, ABB SAE SADELMI-ITALY, . Main contractor.Desalination:ITALIM PIANTI-Italy. The scope of works was to Design, supervise, conduct inspection of supply, installation and Witness testing and commissioning of the power plant 1000mw+72 mgpd of desalinated water with MSF desalination. The cost of the project is 1 Billion US $. The scope of work includes as follows : POWER PLANT (Design, supervision, inspection, witness testing and commissioning, documentation review and approval, snag list preparation, monitoring during Guarantee period, monitoring of spare parts handing over, RCDR inspections, QA/QC site implementation) TURBINE SIDE (1)Supply installation of 6 units of Steam Turbine Generator units of 175mw each.Steam turbine-Detuch Bab Cock, Generator-GE make, testing and commissioning . (2) protection system for the generator units 6 nos installation and testing and commissioning \[ABB, REG316\] (3) Excitation transformers x 6no, Generator neutral cabinsx6no Installation, testing and commissioning \[GEmake\] (4)4no x120mva, 15/400kv Generator Power transformers installation testing and commissioning, including protections systems \[ABB make. (5) 2xno 120mva, 15kv/132kv Generator, power transformers, installation testing, commissioning \[ABB make\] (6)3x80mva, 132/11kv station transformers, installation, testing and commissioning with protection systems (7) installation of 1 lot of 132kv cables Oil filled cables from power transformers to new 132 kv substation and from substation to station transformers, Terminations testing an d commissioning \[ABB CABLES SWEEDEN\] (8 ) installation of 1 lot of 400kv Oil filled cables with oil tanks at Generator transformers, jointing, terminations at Generator Transformers 4 no and at 400kv Substation Sealing end with SF6 GIS, testing and commissioning \[ABB SWEEDEN\] (9)11KV Motor control centre x6 no for each STG unit in Turbine hall complete with cable feeders, bus ducts, 11kv SF6 switch gear, bus ducts in form 4 compartments \[ABB make\] . (10)6nox2 unit 110v Battery bank, chargers, DC distribution panels for Turbine operation ancillaries (SAFTNIFE Make sweeden\] (11)Cable basement room with complete support racks, cable trays, supports, fixing supports, and termination of cables LVAC/DC/11KV Power to respective motor control centres and panels .(12)installation and testing and commissioning of MOV centres (Motor operated Valves) for 6 steam turbine generator units (13) installation, testing and commissioning of EMS centre (Electronic monitoring centre) . (14)SER event record system for all units . ( 15) installation, testing and commissioning of Mimic panels for turbine generator units and contronic system\[ ABB, DCS systems\] . (16) installation, testing and commissioning of plant equipement-11kv motors for service water pumpsx6nos (17) installation of 3X Dry type 11kv transformers, testing and commissioning. (18)installation of 15kv and 11kv Bus ducts from Generator to Generator transformers and to 11kv switchgear, testing \[Alpha Navel-ITALY\] (19)Supply, installation, testing and commissioning of 2x1000kva, 11kv Diesel Generators with fuel tank, and all ancillaries \[AEG-Germany make\] . (20) 11kv/415v, 34no of auxiliary transformers for plant ancillary supplies installation, testing and commissioning \[ABB make\] . (21)132kv GIS substation with Generator bays and interbus transformers bays and spare with feeder protection, ancillaries power supplies \[ABB make. (22) 2X175MVA, 132KV/400KV Inter Bus power transformers connecting 132kv substation with 400kv GIS bus transferring power from 2 Generator units Taw .installation, testing and commissioning \[ABB make\] BOILER SIDE. (23)6xBoiler units with lift to reach 50m height Boiler chimney stack, all lighting \[BABCOCK-Holland\] (24)installation testing and commissioning of 6xBoiler FD fan 11kv motors and pumps . (25)6X Boiler control rooms with all power supply ancillary panels and 11kv motor control centre for Boiler unit MOVs and pumps and, motors (26) Mimic panel in central control room for 132kv substation and 400kv substation . ( 27) motor control center, MOVS, panels for Gas STATION all explosion proof for the supply of Gas to Boiler fuel for combustion
DESALINATION PLANT (28) 6X11KV motor control centres for 6 desalination MSF units consisting of SE6 switch gears, 11kv bus ducts, protection systems, and DC/AC ancillaries. (29)3x80mva 132kv/11kv station transformers installation, testing and commissioning \[ABB make\] (30)6x12mgpd MSF desalination units \[Italim pianti-Italy\]. (31)6x50mw 11kv Sea water intake pumps installation testing and commissioning \[Bacb cock\] . (32)6x11kv Circulation water pump motors, errection testing and commissioning (33) moving Giant Girder crane for pumps and ancillaries installation permanently \[KONE-Germany\] (34)chlorination plant Rectifier transformers 3nos installation testing commissioning . (35)motor control centres and panels and ancillaries in Water Treatment Plant \[italim pianti\] .(36) Fuel pumps and motors at the Fuel Unloading station installation, testing and commissioning. ALL equipments Explosion proof, including light fittings./fixtures\[ABB\] (37)Installation of Fuel oil Tanks x4 no, 100million gallons capacity with all valves MOVs, explosion proof fittings (41)Town water pumping station :11kv motor control centre with 50mw x6 pumps which pumps water to Al ain city/Abu Dhabi city, with all ancillary panels, motors&;Pumps . (38 Cathodic protection system for the water line GRE pipes to prevent rusting of water lines\[Geiger Germany\] (39)Grounding and Earthig mesh connection around the whole plant area and connecting to the existing grid, testing (40) spare parts handing over for power plant and desalination to the main stores inspection and acceptance

Consultant Engineer
  • يناير 1994 إلى يناير 1999

Merz & Mclellan - UK

ASSISTANT RESIDENT ENGINEER في MERZ & MCLELLAN
  • يناير 1993 إلى يناير 1994

(9) WED Contract WED/PS/AD/176-92 supply installation of 8x40mw units of John Brown GAS TURBINES in Meena power station Abu Dhabi, and 4 no at Al AIN power station. The project contractors were John Brown with sub contractor UTS Kent, UK. The scope of work included supply, installation testing and commissioning (1)12x40mw, 11kv GT frame 6 with contronic system control room complete with Air intake Filter system, Disel engine starting unit, Compressors for air feed, HelicalGear assembly to Turbine, and GE generator, with control room attached to the generator (2) Battery unit for the ancillary supplies . (3) Bus duct to 11kv/415 volts ancillary transformer (4)415v LV board motor control centre for the plant and ancillaries . (5) 11kv/33kv 60mva power transformers errection testing and commissioning . (6)33kv SF6 switch gear centre for incoming and outgoing cable feeders with complete protection ABB relays, installation testing and commissioning \[ABB\]. (7) 415V LVAC board with no of feeders for ancillary supplies with motor control centre \[HOLECH\] . (8) power supply by cable from 6.6KV/415v Transformer control room by cable feeder as alternative incoming to 33kv control room LVAC board (9) power supply from Black start Diesel Generator board by cable to 415 LVAC board in new 33kv control room as alternative supply (9) 2XNO 33/132KV interbus transformers connecting 33kv Bus with 132 kv Bus, installation, testing and commissioning with power cables .

UAE
  • يناير 1993 إلى يناير 1994
ASSITANT RESIDENT ENGINEER في EWBANK PREECE
  • يناير 1992 إلى يناير 1993

(10)MEW/Dubai contract for supply installation, commissioning of 7xFrame 6 Kannis Energie GmbH Gas Turbine generator units in Northern Emirates, .The project consultants was Ew bank international, consultants UK.The scope of work included provision testing commissioning of 2 units in New Quidfa power station, 2 units in Dhaid Power station, 1 unit in Ajman power station, and 2 units in AL Nakheel power station, Rasalkhaimah.with all ancillaries,
1)errection commissioning of GT units (2)extension of control room and contronic 5 (3)installation of power transformer 80mva 11kv./33kv, oil filling etc and testing and commissioning (4) errection of 33kv GIS switch gear, assembly, testing and commissioning of the switchgear panel (5)errection testing of Bus ducts (6)laying of 33kv cables, 11kv cables, terminations at switch gear and transformers, testing and commissioning (7)Relays testing and commissioning in protection panels for feeder protection
Conduct survey for up gradation of OHL transmission line to 132kv from Fujairah to Dibba 129 towers with maintenance to the line, arcing horns, Bates damper, replacement of string insulator etc with ETA as contractor

Consultant Engineer
  • يناير 1992 إلى يناير 1993
SITE ENGINEER في TOLEDO ELECTRICAL ESTABLISHMENT
  • يناير 1991 إلى يناير 1992

(11)WED contract;installation of 2x Frame 5 Stewart & Stevenson Gas turbines US at Madina zayed power station and Liwa Power stations in Western Region of Abu Dhabi Emirate.The project consultants were Ew Bank preece, Abudhabi. Duration of the project 11months and completed well in advance and energized.The scope of work included 1)foundation for GT unit and Air intake filter, cable trenches for 11kv cables . ( 2) Erection of the Air intake Filter, Hydraulic starting unit, comperessor system, Helical Gear coupling to Turbine unit, Turbine and Generator unit, a stand alone control room, Battery unit (3)Installation of 11kv/33kv power transformer, testing and commissioning. (4) laying and termination of 11kv cables from Generator cabin to Power transformer, laying of 33kv cables from transformer to 33KV switch gear in GIS switch gear room and terminations, testing and commissioning. (5)All protection panel relay testing (6)successful trial run operation and tests conduct for all emergency stop, trip on protections local and through relays, increase of load and decrease of load, Power factor control etc from Contronic system (7)attend to snag list raised by consultant and completion and handover with As Built drawings, manuals and test records. (8)carryout estimation and quantity work out for Highrise building electrification to quote for tenders and several projects in office

Site Engineer
  • يناير 1991 إلى يناير 1992
MAINTENANCE ENGINEER في SESHASAYEE INDUSTIRES LTD
  • يناير 1986 إلى يناير 1991

(12) project: Seshasayee industries 2nd unit establishment continuous process industry for manufacture of solid core/Bushing insulators at PN Kuppam, for India’s various Electricity Boards on order. The scope of work was to establish the Factory, erect all process equipments and trial run and take to full production scale. Was responsible for the following.
1)Errection of Ball mill, associated pump and motor 150kw and panel board and commission for adding the clay balls and minerals in proportion and grinding with water for the pulp (2) Installation of Blungers and Agitators coupled to motors 50kw and trial run. (3)Installation of Filter press for passing the molten minerals and raw materials of clay to the sheet form, panel \[Italy\] board and control circuit (4)installation of Pug Mill and controls \[German make\], (5) installation running of various CNC Lathes with tem plates for turning the pugs to various shapes of insulators to size accurately. (6) installation and trial run of Steam humidifier chamber with drying cycle of finished insulators from Lathes and commissioning of Thermal kiln. (7) state of the art painting chambers /baths where the dry insulators from steam chamber after inspection are painted automatically with chocolate brown coffee colour for the insulators . 8) installation, testing and commissioning of computerized High temperature Shuttle Kilns\[German make\] 1200deg C where insulators for 1 load are stacked up in specially strong holding supports, closed by automatically moving kiln door, locked and subjected to Heating cycle for 72hours up to 1100deg c and then reduced to cooling cycle for 36hours.After the preset program on the computer ends, the door is opened and gradually allowed to cool by natural air. (9)Then the insulators are drawn out and unloaded and subject various check mechanical and electrical.Those with cracks are sorted out and rest send for Porous testing, ultrasonic test, cantilever testing, pulling strength test, and electrical type tests specified by IEC regulation at the High voltage laboratory . (10) After the factory came into full scale operation took up charge of the maintenance of motors, machinaries and controls for preventive maintenance, break down maintenance, (11) Maintenance of 11kv substation and switch gears, gantry, 11kv capacitor banks, earth pits, panels . (12) Errection, installation, testing and maintenance of 500kva AEG Generator starting on compressed Air, with control panels . (13)maintenance of Fuel storage pumping station

India
  • يناير 1986 إلى يناير 1991
DESIGN ENGINEER
  • يناير 1984 إلى يناير 1985

(13)AL Harbi consulting, Riyadh, KSA projects from Riyadh municipality -consultancy services for commercial, residential, and industrial buildings in architectural drawings, electrical and civil drawings. was responsible for preparation of Electrical design drawings for buildings for power requirement, DB, cable size calculation, no of circuits, lighting arrangement, to the guide lines of NEC, and see to approval from Municipality.

Consultant Engineer في Al Harbi Consulting Engineers Saudi Arabi
  • يناير 1984 إلى يناير 1985
PROJECT ENGINEER
  • يناير 1981 إلى يناير 1982

(14)Projects from Bahrain state Electricity Department to AL Kajah Est, Bahrain as measured time contractor.The major projects carried out. 1)power supply to Neighbourhood 5 Issa town with low voltage cable laying and jointing with Tjoints for service connection to each building main DB, (2)Installation of 1000kva package units \[combined CFS unit with circuit breaker and 2 cable ring feeders 11kv and LVAC panel board\] . (3) power supply to Neighbourhood 6 -Issa town with errection testing and commissioning of 33/11kv substations, 1000kva package units of ring main units, laying of LVAC cable and making T joints for building services, backfilling . (4) power supply to township in Buddaya and Gidafs including installation of 1000kva package units, substations, 11kv, 415vcable laying and jointing /terminations. (5) power supply to 11kv substation in Sheraton hotel from the ring main, laying 11kv cable 3km, jointing (6)power supply and modification in cable system at Bahrain Defense Forces camp at East Refa including construction of 11kv substation, switch gears, and cable terminations (7)Highway lighting from Manama to Sitra, and Manama to Muhraq of 18m Light poles complete with errection of Feeder pillars, foundations, pole errection, fitting of Light fixtures, cable laying and terminations etc. (8)street Lighting Gudabiya with 5m poles, cable laying, excavation of trenches, road crossings, reinstatement of coal tar for roads, pole errection, light fittings

Electrical Engineer في Al Khaja Es
  • البحرين
  • يناير 1980 إلى يناير 1982
JUNIOR ENGINEER في MAHARASHTRA STATE ELECTRICITY BOARD
  • يناير 1975 إلى يناير 1980

(15)MSEB-, Maharashtra state Electricity Board, state owned utility company. (1)was in charge for 110kv/33/11kv vishrambag substatio in sangli, Maharashtra state India. 2) carried out periodical maintenance of outdoor s/s line isolators, current transformers, 110kv voltage transformers, 110/33kv x2, 80mva transformers, 110kv bus bars, 33kv busbars, 2x33/11kv power transformers, all outdoor equipments (3)carried out maintenance on break down and periodically for the 11kv Bulk Oil circuit Breakers for the outgoing feeders, check of feeder relays settings, and operation readiness . (4)maintenance of Battery system for the panel supply/relays, and for Hotline communication system (5)maintenance of 110kv Minimum Oil circuit Breakers, quarterly, half yearly, and annual (6)maintaining the OHL maintenance with regular checks (7) worked as shift engineer in 400

India
  • يناير 1975 إلى يناير 1980
  • إلى

Holder of Competency certificate to Supervise Electrical works of TRANSCO/ADDC
•Approved from ADWEA/MEW earlier to work as Consultant Engineer
•Familiar with ADWEA/TRANSCO procedures, HSE rules and Regulations and QA procedures.

Maintenance manager في Seshasayee Industries Ltd
  • إلى
Junior Engineer في Maharashtra State Electricity Board
  • إلى

الخلفية التعليمية

بكالوريوس, Electrical
  • في TKM College of Engineering QUILON INDIA
  • يونيو 1975

studies all through out Colege studies with Merrit scholarship awarded from India Government on the merrits of high marks scored and remained 1st Rank in Kunnathur taluka in Quilon District in the year 1969, in Kerala state of India

بكالوريوس, Electrical Engineering
  • في kerala university, TKM College of Engineering Quilon India
  • يونيو 1975

Material Management Indian Labour Management Quality control specilised in power system

Specialties & Skills

Project Planning
Quality assuarance and quality control
Document Automation
Project Management
Prepare Snag List
CABLING
CUSTOMER RELATIONS
DELIVERY
DOCUMENTATION
ENGINEERING
FILE MANAGEMENT

اللغات

الانجليزية
متمرّس
الملايام
متمرّس
الهندية
متمرّس

العضويات

institution of engineers India
  • AMIE
  • June 1985

التدريب و الشهادات

First Aid and Fire fighting (تدريب)
معهد التدريب:
Emirates Training Institute
تاريخ الدورة:
June 2009
المدة:
16 ساعة

الهوايات

  • music,Reading, stamp collection,
    used to sing in College aluminee functions, aired in TV shows