operator boiler
pt. angel product
Total years of experience :23 years, 0 Months
supervision in steam processing activities are supervised by an apparatus of investigation in one room in the call control room, as well as space for supervisory oversight of coal combustion temperature in the furnace that we could go up or down depending on the demands of the production process that runs the machine tool equipment in motion with steam from us. and monitoring tool machine tool supporting activities related to the smoothness of the process of making steam.
prepare a three wire coils pathway to teflon. nozle, continues to be measured by reference to labor standards or reference procedure of wire distance, distance to the material welding wire, laser control right in the middle lane new groove we play joystick to offset groove track that would in welding, then enter the pipe to rell with the help of conveyor drive handle and start welding smua welding results in measuring of the thickness, the width of the welding. high welding defects if any input to the shelf where repair and in repair.
preparation for production, I took the raw materials that have been prepared, choose which approximately decent and quality life, with a forklift brought then input into the silo in a rotating drum mixed with oil, wait about about 1.5 hours in the press with compressor order to produce a standard size between 2.6 to 2.9 sizes, and in container 25kg-75kg in stacking on pallets and storage space is taken with the removal tool brought themselves up to forklift in orderly and neat.
been a deputy head of the class, a class delegates meeting of the intra-school students, following a race like volly ball, soccer, table tennis in the Indonesian Independence Day.