Bridge engineer
NHIDCL
Total years of experience :0 years, 0 Months
Project : Two-lane of Existing Hunli to Anni Road on EPC Basis From Design km
106.200 to km.120.000 (existing km. 111.600 to km 126.075) in the state of
Arunachal Pradesh under SARDP-NE
Cost of Project : 144.6 Crores
Structure Details:
Name of Bridge /
Flyover / ROB / VUP
/ PUP
Length
(m)
Width
(m)
Span
Arrangements
(m)
Foundati
on Type
Superstruct
ure Type
Kuttimani-Bridge /Structural Engineer
Location : Arunachal Pradesh
Location : Nagaland
Construction of Bypass to Vizianagaram Town of NH-43 (New NH-26)
from Km 537+600 to 552+000 (Raipur to Visakhapatnam Section) to 4 Lane on
EPC Basis in the State of Andhra Pradesh. Design Ch: Km 0+000 to Km 17.160.
34 16 2x17 Open
RCC
Girder
1 x 9.80
Open
RCC
Girder
16 2 x 12.5 2 x 8.0 Open Box Type
Minor Bridge @
11+660 Km
12 2 x 12.5 2 x 6.0 Open Box Type
PUP @ 2+933 Km 72 x 12.5 1 x 7.0 Open Box Type
VUP @ 5+523 Km 12 2 x 12.5 1 x 12.0 Open Box Type
PUP @ 10+598 Km 72 x 12.5 1 x 7.0 Open Box Type
VUP @ 14+101 Km 12 2 x 12.5 1 x 12.0 Open Box Type
7.Project : Design Engineering Services for Rehabilitation & upgradation of NH-67
from Km 424.650 to Km 487.693 (Gooty - Tadipatri section) to Two Lane with
Paved Shoulders under NH(0) Plan 2016-17 in the State of Andhra Pradesh on
ORDINATOR(ROADS
& BRIDGES)
courses: 25.0 16.0 5 x 5.0 Open Box Type Minor Bridge @ 65+950 Km 20.0 16.0 4 x 5.0 Open Box Type Minor Bridge @ 72+938 Km 20.0 16.0 4 x 5.0 Open Box Type Minor Bridge @ 79+537 Km 27.0 16.0 4 x 4.5 Open Box Type
1x24.6 + 2 x 21.6 + 1x24.6 Open
courses: CERTIFICATIONS TEKLA: Basic Editing Course MIDAS: Basic Conventional Bridges