Lakshminarayana N, Power System Operation Supervisor

Lakshminarayana N

Power System Operation Supervisor

Petrochina

البلد
العراق
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
34 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :34 years, 11 أشهر

Power System Operation Supervisor في Petrochina
  • العراق - البصرة
  • أشغل هذه الوظيفة منذ نوفمبر 2013

Operation and maintenance of the captive power plant equipped with SIEMENS SGT-200 gas turbine. Follow up and coordination for the Erection and pre-commissioning of captive power plant equipped with simple cycle gas turbines SGT400.

As Operation Supervisor the job responsibility is to coordinate with the O&M team for the safe, reliable and uninterrupted supply of power from the power plant to the process and other users. Plant performance monitoring and Troubleshooting.

For the new power plant expansion, equipped with SGT-400 gas turbines present job role to Coordination with the related agencies for the smooth functioning of the erection and commissioning work.

Senior Shift Engineer في Jubail O&M Limited. Jubail IWPP
  • المملكة العربية السعودية - الجبيل
  • فبراير 2010 إلى نوفمبر 2013

Commissioning and Post commissioning, Independent shift in charge of IWPP with 2743 MW Combined Cycle Power Plant and 800, 000 M3/day desalination plant..

Member of the team for the fuel oil commissioning and Combustion inspection outage coordination activities.
Headed shift operations team for the safe, efficient operation of the IWPP. Coordination with external agencies for the generation planning, outages coordination. Plant performance monitoring and Troubleshooting
Plant was equipped with
12 GE Frame 7FA gas turbines,
3 SNC GE steam turbines,
1 D-11 GE steam turbine.
9 single pressure supplementary fired HRSGs,
3 triple pressure supplementary fired HRSGs
27 Multi effect distillation units and auxiliaries.
380KV GIS
Fuel gas compressors
Fuel oil system

Utilities Engineer في Saudi Cement Company
  • المملكة العربية السعودية - الهفوف
  • أغسطس 2007 إلى ديسمبر 2009

As Utilities Engineer looked after Operation and maintenance of captive gas based power plant
and utilities -- RO plant, compressors, gas skids and switchyard.
Commissioning of new Captive Power plant 108MW, equipped with 3 GE frame 6 gas turbines and its auxiliaries. Handled Gas turbine control system retrofit from SECONTIC system to new TurboLogic system with SIEMENS PLC.

Plant was equipped with
189MW installed capacity captive power plant with 3 GE Frame 6 turbines and 3 BBC 9D gas turbines, 115 KV GIS switch gear, 2 No. 25MVA 50 HZ to 60HZ frequency converters, electrical distribution system. Plant utilities include RO plant, gas skids, HSD and crude oil handling and treatment plant and compressors.

Operations Manager- Power plant operations في GVK Power & Infrastructure Limited
  • الهند
  • يونيو 2000 إلى يوليو 2007

Operations department head, of two CCPP power plants, 235MWCCPP and 228 MWCCPP. Job including annual operating plans preparation, budgetary preparation. Coordination with external agencies like state electricity board, fuel supply agencies- GAIL, BPCL for plant operational issues.

As Asst. Manager, was independent shift in charge of 235MWCCPP, looked after start-up, shutdown, watch keeping, monitoring of ABB 8C gas turbines, Dual pressure HRSG, steam turbine, auxiliaries, BOP equipments, 220KV switch yard operations, isolations & normalization.
• Plant monitoring, routine maintenance, identification and rectification of equipment and system related troubles.
• Re-commissioning of gas turbine after major overhaul.
• Plant performance monitoring, auxiliary power saving activities. Part of the team to prepare SOPs for the plant operation and training needs of the operating staff.

Plant was equipped with 3 ABB 8C model gas turbines of 52 MW ISO rating, 1 ALSTOM13E2 gas turbine 165MW ISO rating.3 Dual pressure Heat recovery steam generators, 1 triple pressure HRSG
STAL make steam turbine of 80 MW and ALSTOM make 75 MW steam turbine
220 KV switch yard, through which power from the plant is evacuated to State electricity board.
GT controls are EGATROL, HRSG, BOP plant operation through Procontrol P13 and P14. Plant utilities include gas skids, DM plant, cooling tower and fire water system.

Deputy Manager Power and Utilities في Reliance Industries Limited
  • الهند - سورات
  • نوفمبر 1996 إلى يونيو 2000

operations and maintenance of captive gas based co-generation Power plant and Utilities of 252 MW installed capacity, looking after plant startup/ shutdown and routine operation activities.

Plant was equipped with
7 GE Frame 6 gas turbines with MK IV & MK V controls.
7 Heat recovery steam generators - single pressure with supplementary fuel firing.
42 MW Skoda make steam turbine with double extraction & condensing type.
220KV switch yard connecting to state electricity grid.
Utilities like raw water treatment plant, DM water plant, Cooling towers air compressors, fuel handling systems - Natural gas, HSD, naphtha.

Asst. Superintendent في TATA Chemicals Limited, Mithapur
  • الهند
  • مايو 1989 إلى أكتوبر 1996

after operation and maintenance of coal based captive power plant equipped with Circulating fluidized bed, pulverized coal/lignite fired boilers, back pressure steam turbines. Steam, power balancing to optimize power generation. Performed routine maintenance and repair of critical equipments. Involved in successful commissioning of 200 TPH circulating fluidized bed boiler with DCS control.

Plant is was equipped with 75MW capacity coal/lignite based captive power plant. Catering the steam, power and utility needs of chemical production complex.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Osmania University
  • يوليو 1986

Specialties & Skills

Steam Turbines
Gas Turbines
Desalination
Power Plant Operations
power plant commissioning
MS office
Maintenance software packages - MAXIMO, SAP

اللغات

الانجليزية
متمرّس

العضويات

GE 7FA users group
  • member of the users group reviewing and contributing regarding the technical issues
  • July 2010