Leon Erasmus, Project Director Infrastructure

Leon Erasmus

Project Director Infrastructure

Worleyparsons - Qatar

البلد
جنوب أفريقيا
التعليم
بكالوريوس, Civil Engineering
الخبرات
18 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 5 أشهر

Project Director Infrastructure في Worleyparsons - Qatar
  • قطر
  • ديسمبر 2011 إلى يوليو 2020

 Project Director for the detailed design for a fully automated Container Terminal in the Middle East (a 2.5 mil TEU facility) for the Hamad Port Project in Qatar. The project included automated container handling equipment and terminal operating systems, infrastructure and buildings for the efficient operation of the automated terminal and integration of the terminal systems into the existing port operating systems. The Construction package has an estimated cost of development of US $ 1bil. The project was shelved after completion of the design phase.
 Project Director for the construction supervision of the Infrastructure and Utility Buildings for Container Terminal 2 at Hamad Port. The Construction package has an estimated cost of development of US $ 300 mil
 Project Director for Phase 2 Master Planning for Hamad Port in Qatar, determining vision statements, development alternatives and port master layouts for the 35km2 Hamad Port property including Master Planning for the provision of Infrastructure and Utilities.
 Senior Project Manager for the design and construction support for the Bulk Infrastructure and Utilities for the Hamad Port and Container Terminal 1 (a 2 mil TEU facility). This package included 25km of access roads, 19 electrical substations, 2 sewage treatment plants and bulk utility supply to all terminals. The Construction package had an estimated cost of development of US $ 500 mil.
 Senior Project Manager for the design and construction support for the Commercial Terminals (General Cargo, Vehicle and Livestock Terminals and Offshore Supply Base) of the Hamad Port Project in Qatar. This package included heavy duty terminal pavement, 5 electrical substations and bulk utility supply. The Construction Package had an estimated cost of development of US $ 350 mil.
 Senior Project Manager for the design and construction support for the Port Marine Unit, Coast Guard Base and the Port Administration Area of the Hamad Port Project in Qatar. The Construction Package had an estimated cost of development of US $ 300 mil.
 Senior Project Manager for the construction support for two Marine Works Packages for the Hamad Port Project in Qatar, namely the Qatar Emiri Naval Forces Base basin (construction of 3.6 km of quay walls and associated revetments along the basin perimeter and associated marine works) and the Qatar Economic Zone 3 basin (construction of the 3.0 km of quay walls and revetments). The Construction Packages had an estimated cost of development of US $ 200 mil and US $ 250 mil respectively.
 Senior Project Manager for preparation of the Design & Build documentation and tender support for the Centralised Customs Inspection Area of the Hamad Port Project in Qatar. The Construction Package had an estimated cost of development of US $ 250 mil.

Project Manager في UWP Consulting
  • جنوب أفريقيا - Port Shepstone
  • أغسطس 2008 إلى نوفمبر 2011

 Project Manager for the design and construction supervision for a FIFA approved sports field complex, a training facility / home base facility used during 2010 Football World Cup.
 Project Manager for the design and construction supervision for various, infrastructure and low-income housing projects in the Port Shepstone area. These projects provided infrastructure for more than 2500 dwellings.
 Project Manager for the construction supervision and contract administration for a 44m high rock/earth fill dam, associated pumpstations, rising main and upgrades to the water treatment works.
 Responsible for the management of the Port Shepstone business unit including staffing, business development, monthly reporting to head office and compliance with ISO Quality Management Systems.

Senior Project Engineer في Qatar Petroleum
  • قطر - الدوحة
  • مارس 2006 إلى يوليو 2008

 Responsible for managing the design and construction of the proposed Qatar Petroleum Headquarters Campus. This major project included office space, training and recreational areas for in excess of 4500 staff with an estimated cost of development of US $ 1.5 - 2.0 bil.
 My key responsibilities included the management of the design review effort of a multi-disciplinary team of professionals, the provision of bulk infrastructure to the project through negotiations with the master developer of the Lusail Development and local service providers.
 Additional responsibilities included management of construction strategy workshops, value engineering workshops and risk workshops including the maintenance of the risk register. As Senior Project Engineer I was also regularly required to report to QP Senior Management on the progress of this prestigious project

Country Manager في Rendel
  • قطر - الدوحة
  • مارس 2002 إلى مارس 2006

 Project Director for the construction supervision of a flyover and underpass project in Doha. The project consisted of 3.5km of 25m wide x 11m deep cast in situ concrete underpass and post-tensioned flyovers, related drainage and included the diversion of existing 132 and 33 kV cables, 700mm dia water mains and 400m treated sewage effluent mains and the necessary co-ordination and consultation with the local service providers for power, water and drainage.
 Project Manager for the detailed design of, and construction support for 16 km of a dual carriageway road network with 6 bridges varying between 25 m and 270 m long between a LNG berth and the support services area in Ras Laffan, in which Rendel acted as designers.
 Project Manager for the detailed design of, and construction support for 8 km of Pipe Rack in Ras Laffan, an EPIC contract in which Rendel acted as designers.
 Project Manager for the detailed design of, and construction support for the provision of infrastructure to a 100 ha industrial development, an EPIC contract in which Rendel acted as designers.
 Project Manager for the detailed design of, and construction support for 15 kms of road network and drainage for a 400-ha industrial development in Ras Laffan, an EPIC contract in which Rendel acted as designers.
 Project Manager for the detailed design of roads, drainage and infrastructure for three residential districts covering approximately 200 ha each in Doha, for the Ministry of Municipal Affairs and Agriculture.
 Project Manager for the detailed design of, and construction support for 7 km of dual carriageway for extra heavy loads and associated infrastructure in Ras Laffan, an EPIC contract in which Rendel acted as designers.
 Responsible for the management of the Qatar business unit including staffing, business development, monthly reporting to head office and compliance with ISO Quality Management Systems.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في University of KwaZulu Natal. Durban
  • نوفمبر 1985

see attached list of subjects and grades achieved

Specialties & Skills

Infrastructure
Project Management
Engineering
Civil Engineering
project management
civil engineering
construction supervision
design management

اللغات

الانجليزية
اللغة الأم
الأفركانية
متمرّس

العضويات

South African Institution of Civil Engineering
  • Member
  • June 1998

التدريب و الشهادات

PrEng (الشهادة)
تاريخ الدورة:
March 1995

الهوايات

  • Golfing
    16 Handicap