Leopoldo Pineda, Marina construction Manager

Leopoldo Pineda

Marina construction Manager

Costa Palmas Developments

Location
Mexico - Mexico City
Education
Master's degree, Port Management
Experience
34 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :34 years, 4 Months

Marina construction Manager at Costa Palmas Developments
  • Mexico - La Ribera
  • My current job since August 2020

Construction manager of the Marina for small boats

Sr. Civil Engineer at ArcelorMittal Mexico
  • Mexico
  • My current job since June 2016

In charge of the planning, development, preliminary design, quality control and management of civil, maritime and port projects at the ArcelorMittal Lázaro Cárdenas, Mexico plant.

My responsibilities are:

1. Identifying new infrastructure requirements or, in other cases, proposing the modification and repair of existing infrastructure in order to facilitate the more efficient operation of ArcelorMittal's steel plant or marine terminal;
2. Elaboration of a conceptual design of new infrastructure or facilities to be modified or improved; as well as the elaboration of technical specifications and compilation of Construction Standards applicable to the project;
3. Elaboration of Terms of Reference, preparation of Project Task List, and other necessary documentation for the tender and / or request for quotation from external contractors;
4. Close supervision of all activities done by the contractor on the job site, verifying the quality of materials, equipment, and new infrastructure; checking the adherence to regulations and standards of health, safety and care for the environment by the contractor personnel;
5. Follow-up of the progress of the work and its compliance with the contract program, which includes the identification of probable hazards that might threaten the continuity of the construction process and implement the necessary preventive measures;
6. Management, cost control, monitoring and accounting of the project, including the revision and, where appropriate, approval of contractor’s payment claims considering the amortizations of advance payments or other payments, and the review and approval of extra work and change orders;
7. Delivery and closing of the project verifying that all the documentation is organized and filed, including the handover/reception of technical or operational manuals and warranty certificates of equipment and other infrastructure.

Deputy Project Manager at AECOM
  • Mexico
  • June 2015 to May 2016

Responsible for overseeing and managing the construction of the first automated container terminal in Latin America owned by APM Terminals in the port of Lázaro Cárdenas, Mexico, under the FIDIC Contracts (Fédération Internationale des Ingénieurs-Conseils) modality, with an investment of more than US$900 million Dollars.

My responsibilities were:
Assist the Project Manager in the following tasks:
1. Establish a close liaison and engagement with the client to facilitate the exchange of information and follow up on the instructions and commitments resulting from the project's progress meetings.
2. Supervision of all activities done by the contractor on the job site, verifying the quality of materials, equipment, and new infrastructure; checking the adherence to regulations and standards of health, safety and care for the environment by the contractor personnel;
3. Follow-up of the progress of the work and its compliance with the contract program, which includes the identification of probable hazards that might threaten the continuity of the construction process and consequently implement preventive measures;
4. Management, cost control, monitoring and accounting of the project, including the revision and, where appropriate, approval of contractors' certificates for payment considering the amortizations of advance payments or other payments, review, and approval of extra work and change orders;
5. Elaboration of daily, weekly and monthly reports.

Dredging Project Manager at PYECSA
  • Mexico
  • October 2013 to June 2015

The on-site representative of the project lead contractor (PYECSA-CJOSE Consortium) to the Client.

My responsibilities were:
1. Overseeing and managing the capital dredging of Lazaro Cardenas Port's main access channel, secondary navigational channels and maneuvering basins to the depth of -19 meters; total volume: 4.1 million Cu meters; contract value: $60 million US Dollars;
2. Monitor and report to the PYECSA Management Board on the progress of all dredging activities within the program, including significant milestones, and any conditions which would affect project cost or schedule;
3. Monitor and report to the PYECSA Management Board on the productivity of marine dredges, consumption of fuel, inputs, and spare parts;
4. Preparation and issue of weekly and monthly progress reports to the PYECSA Management Board.

Senior Resident Engineer at III Servicios
  • Mexico
  • August 2012 to October 2013

Responsible for coordinating and leading the supervising team of the construction of Pemex’s oil terminal at the Port of La Paz, Baja California Sur, Mexico. Contract value: $35 million US Dollars.
My responsibilities were:
1. Review and correction, if necessary, of technical specifications and project
drawings; as well as the implementation of the applicable construction standards
in order to meet the Pemex Quality Management System.
2. Development and implementation of communication mechanisms among all those involved in the project;
3. Monitor the performance of the contractor during all phases of the project and follow up on the project program's critical path and implement corrections in case of diversion;
4. Preparation and elaboration of weekly reports to inform physical and budgetary
progress;
5. Authorize payment claims issued by the contractor and validate the need to realize
change orders for the project owner to approve them.

Senior Resident Engineer at Terminales Portuarias del Pacifico – TPP
  • Mexico
  • January 2011 to July 2012

Primarily responsible for coordinating and leading the supervising team during the construction of the TPP’s bulk terminal at the Port of Lazaro Cardenas, Mexico valued at US $ 55 million Dollars under the FIDIC Contracts (Fédération Internationale des Ingénieurs-Conseils).

My responsibilities were:
1. Follow-up of the progress of the work and its compliance with the contract program, which includes the identification of probable hazards that might threaten
the continuity of the construction process and consequently implement preventive
measures;
2. Supervision of all activities of the contractor on the job site, verifying the quality of materials, equipment, and new infrastructure; checking the adherence to
regulations and standards of health, safety and care for the environment by the
contractor personnel;
3. Revision and, where appropriate, approval of contractors' payment claims
considering the amortizations of advance payments or other payments, review, and
approval of extra work and change orders;
4. Elaboration of daily, weekly and monthly reports.

Public Works’ Auditor at Secretaria de la Función Pública – SFP
  • Mexico
  • July 2009 to December 2010

In charge of inspecting the construction procedures records and contracting practices of all public works carried out by the Mexican Federal Government agencies, and with this prevent irregularities that affect the execution of the aforementioned works. Specifically, I revised that the documentation relating to the planning, contracting, implementation and commissioning of projects was correct according to the Public Works Act and its Regulations.

My responsibilities were:
1. Perform audits to Federal Government Agencies to verify that all documents
issued for any bidding process is complete, correct and in compliance with the law;
2. Verify that the process of awarding public works contracts is carried out in accordance with the Regulations and Laws;
3. Check that the progress of works and its corresponding certificates of payments
are carried out according to the stipulated in the contract.

Project Coordinator at Stevedoring Services of America de Mexico
  • Mexico
  • July 2007 to June 2009

Involved in the development and administration of the Tuxpan´s
Multipurpose/Container Terminal project, revising project plans and procedures,
facilitating project management and project status review meetings, conducting
research and analysis on project status, and serving as the primary administrator of the
project and time databases under the Project manager’s direction.

My responsibilities were:
1. Review construction drawings, technical specifications and construction procedures issued by external consultants.
2. Assist the project manager in facilitating the holding of meetings to analyze the status of the project.
3. Negotiate changes to the scope of work with external consultants to meet project requirements.
4. Keep track and update the progress of the project using Microsoft Project.
5. Keep track and update the budget of the project using Excel and;
6. Elaboration of weekly reports.

Project Coordinator at Puerto de Manzanillo (Port Authority of Manzanillo)
  • Mexico
  • August 2003 to July 2007

Involved in the development, implementation, and management of port-related projects such as the construction of lighted beacons, jetties, breakwaters, wharves, and execution of dredging works. The foremost responsibility was to complete projects within schedule and budget while adhering to the company’s business practices, environmental and construction safety guidelines.

My responsibilities were:
1. Identify new infrastructure requirements and, in other cases, propose the modification and repair of existing infrastructure;
2. Elaboration of a conceptual design of new infrastructure or facilities to be modified or
improved; as well as the elaboration of technical specifications and compilation of
Construction Standards applicable to the project;
3. Elaboration of Terms of Reference, preparation of Project Task List, and other
necessary documentation for the tender and/or request for quotation from external
contractors;
4. Close supervision of all activities of the contractor on the job site, verifying the quality of materials, equipment, and new infrastructure; checking the adherence to regulations and standards of health, safety and care for the environment by the contractor personnel;
5. Follow-up of the progress of the work and its compliance with the contract program,
which includes the identification of probable hazards that might threaten the continuity of the construction process and consequently implement preventive measures;
6. Management, cost control, monitoring and accounting of the project, including the
revision and, where appropriate, approval of contractor’s certificates of payment
considering the amortizations of advance payments or other payments, review and
approval of extra work and change orders;
7. Delivery and closing of the project verifying that all the documentation is organized and filed, including the handover/reception of technical or operational manuals and warranty
certificates of equipment and other infrastructure.

Project Manager at Dragamex S.A. de C.V
  • Mexico
  • May 2000 to August 2003

In charge of managing the project, including the coordination of construction equipment and personnel involved in several dredging works across the country; as well as preparing certificates of payment and establishing professional relationships with the client.

Specific Responsibilities:
1. Coordination of dredging teams in land and water, management of resources
(equipment and personnel), schedule follow up, management of subcontractors,
budget and risks, to meet contract's financial and delivery objectives;
2. Analysis and revisión of actual site conditions in those projects related to sediment transport and coastal morphology modification in order to implement the most
appropriate construction process.

Master of Science in Port Management & Marine Construction at IHE Delft
  • Netherlands
  • October 1998 to May 2000

Post-graduate studies to learn the technical background and practical skills to plan,
model, design and manage coastal engineering and port development projects, and
learn to analyze coastal problems and conceive appropriate solutions.

Civil Engineer at Ingeniería Portuaria Manson S.A. de C.V.
  • Mexico
  • February 1994 to September 1998

Assist the project manager during the construction works to reinforce the wharf of Port of El Sauzal, B.C., and overseeing the dredging of the same port.
Company: Puertos Mexicanos - SCT

Project Supervisor at Puertos Mexicanos – SCT
  • Mexico
  • February 1990 to January 1994

In charge of the supervision and control of port of Ensenada’s works such as the
construction of jetties, refurbishment of wharves and execution of dredging works.

Education

Master's degree, Port Management
  • at IHE Delft
  • May 2000

Post-graduate studies to learn the technical background and practical skills to plan, model, design and manage coastal engineering and port development projects, and learn to analyze coastal problems and conceive appropriate solutions.

Bachelor's degree, Civil Engineering
  • at Universidad Autonoma de Baja California
  • December 1990

Civil Engineer, with an emphasis on the designing, development, creation, and maintaining of maritime and port construction projects, from conception through to completion.

Specialties & Skills

ACCOUNTANCY
CLOSING
CONCEPTUAL DESIGN
COST CONTROL
CUSTOMER RELATIONS
DELIVERY
DOCUMENTATION
MANAGEMENT

Languages

English
Expert

Training and Certifications

INTERNACIONAL COURSE ON PORT AND COASTAL ENGINEERING (Training)
Training Institute:
Instituto Mexicano del Transporte – SCT
Date Attended:
September 2002
Duration:
40 hours

Hobbies

  • Soccer player, Jogging, watch movies, chess player.
    Have fun and good health