llappa Thangappandian, Project Engineer / Team Leader

llappa Thangappandian

Project Engineer / Team Leader

Abu Dhabi Water & Electricity Authority

البلد
الإمارات العربية المتحدة
التعليم
بكالوريوس, CIVIL ENGINEERING
الخبرات
11 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :11 years, 3 أشهر

Project Engineer / Team Leader في Abu Dhabi Water & Electricity Authority
  • الإمارات العربية المتحدة
  • مايو 2006 إلى مايو 2008

Client: M/s. Abu Dhabi Water & Electricity Authority
Consultant: M/s. TEBODIN Consultant &.Engineers
Value of Project: AED 170 Million
Position Held: Project Engineer / Team Leader.
Period: May 2006 to May 2008
Project Description:
The project scope of work includes R.C.C. structures, tanks, laying of 70 Km of DN800 C.S Pipes, 40 Km of DN600 D.I. Pipes to connect with Steel tanks of 2 x 5 MIG, Concrete reservoirs 2 MIG, Chlorination system, SCADA etc. the bulk of which passes through the harsh terrain of Northern Emirates.

Responsibility
➢ Responsible for executing the works as per the frame of the contract
➢ Reporting to the construction manager, Getting report from the Site Engineer, Supervisors, Surveyors etc
➢ Preparing the daily programme, weekly planning and monthly target achievement, planning and execution
➢ The site level planning and executing the works and monitoring the progress in quality and safety aspect
➢ Responsible for parallel activities like construction of A.V Chamber, W.O. Chamber, L.V. Chamber, & W.M. Chamber, Construction of thrust block & other construction work related to pipe laying projects.
➢ Pre-Planning and conducting Hydrostatics Test in TYCO water pipes (C.S. Pipes with sintakote coating) and Ductile Iron pipes PN 42, P.N 32, and P.N 16.
➢ Laying of F.O.C with warning tape & warning tiles.
➢ Responsible for liaison with client and our management for my area activities
➢ The testing, commissioning & handing over the projects as per the contract agreement

PROJECT-II:
Name of Project: Installation of Water Transmission Pipe Line Work in

في TECTON ENGINEERING & CONSTRUCTION L.L.C- AJMAN
  • يناير 2005 إلى مايو 2008

SR.PROJECT ENGINEER

WORK EXPERIENCE: 16 YEARS -10 Months (10 YEARS - UAE)

ADDRESS IN INDIA: 6/8B NORTH STREET
AYYANARUTHU (P.O)
KAYATHAR (VIA)

Project Engineer / Team Leader في Federal Electricity and Water Authority
  • يناير 2005 إلى مايو 2006

SR.PROJECT ENGINEER

WORK EXPERIENCE: 16 YEARS -10 Months (10 YEARS - UAE)

ADDRESS IN INDIA: 6/8B NORTH STREET
AYYANARUTHU (P.O)
KAYATHAR (VIA)

Section Engineer في Ajman Sewerage Committee
  • الهند
  • أكتوبر 2003 إلى يونيو 2004

Client: M/s. Ajman Sewerage Committee
Consultant: M/s. McDonald
Value of Project: AED 45 Million
Position Held: Section Engineer.
Period: October 2003 to June 2004.
Project Description:
Installation, Testing, & commissioning of Gravity Sewerage System of 48 KM in Ajman Emirates Using GRP & Upvc pipe (DN100 to DN750)

Responsibility:
➢ Responsible for the excavation of trenches up to 8Mtrs deep using sheet pile shoring and De-watering System
➢ Responsible for laying GRP & Upvc Pipes from 350mm dia to 750mm dia with entire satisfaction of the management and client
➢ Conducting various tests in GRP and UPVC pipeline in sewerage system, like Air test, Camera test, Radiography test, Infiltration & Exhilaration test.
➢ Pre-cast manholes erection and fixing of LIC chambers, GRP Lamination work inside the chambers

M/s. KHEC TECHNOLOGIES INDIA PVT. Ltd in INDIA - CHENNAI

Assistant Engineer في Name of Project
  • الهند
  • أبريل 2003 إلى أكتوبر 2003

Name of Project: Chennai Metro Water Augmentation project (CMWAP)
Client: M/s. Chennai Metro Water
Value of Project: INR 30 Corers
Position Held: Assistant Engineer
Period: April -2003 to October 2003
Project Description
Installation, testing and commissioning of 60 Km of DN2200 MS PIPE & Related Civil Works for Chennai Water Transmission Pipe Line Works

Responsibility.
➢ Responsible for various activities in water pipeline projects
➢ Laying of M.S Pipes with fabrication and welding (Fillet Weld)
➢ Responsible for various testing activities like Air test (Welded joints)
➢ Conducting Hydro Static test for M.S Pipes (1875mm)
➢ Fully responsible for all type of civil related to the pipeline projects.


M/s. SIMPLEX CONCRETE PILES INDIA - LTD (CHENNAI)

Name of Project: Chennai City River Conservation Projects

في Chennai Metro Water Supply and Sewerage Board
  • الهند
  • أغسطس 2002 إلى مارس 2003

Client: M/s. Chennai Metro Water Supply and Sewerage Board
Value of Project: INR 15 Corers
Position Held: Overseer.
Period: August- 2002 to March- 2003.
Responsibility
➢ Estimation preparation and execution plan for the civil work, piping related projects.
➢ Laying of pipe in the 6.5Mtr deep excavated trench using wooden shoring system.
➢ Construction of various types of manhole/ inspectors
➢ Laying of 450mm to 1000mm C.I Pipes for the Chennai city sewerage system
➢ Responsible for preparation of As-Built drawing as per the site condition


M/s. SUBHASH PROJECT & MARKETTING LTD - INDIA (CHENNAI)

PROJECT-I:
Name of Project: Water Retaining Structure & Pumping Station Project

Site Engineer في Chennai Metro Water Supply and Sewerage Board
  • الهند
  • مايو 2000 إلى مايو 2002

Name of Project: ECS & PCP Project for Chennai City Sewerage System
Client: M/s. Chennai Metro Water Supply and Sewerage Board
Value of Project: INR 10 Corers
Position Held: Site Engineer
Period: May- 2000 to May- 2002.
Responsibility
➢ Responsible for mobilization of work force and materials
➢ Preplanning for the materials, work force, tools, & equipment
➢ Execution of all fields piping works
➢ Responsible for client co-ordination and sub-contractor dealings for smooth pipeline project

M/s. DEPARTMENT OF TOWN AND COUNTRY PLANNING (TAMIL NADU)

Site Engineer في Chennai Metro Water Supply and Sewerage Board
  • الهند
  • سبتمبر 1998 إلى مايو 2000

Client: M/s. Chennai Metro Water Supply and Sewerage Board
Value of Project: INR 05 Corers
Position Held: Site Engineer
Period: September- 1998 to May- 2000.
Responsibility
➢ Construction of U.G Tank (Water Retaining Structure) 5m deep,
➢ Construction of pumping station and Suction well
➢ Erection and commissioning of Electro mechanical works for pump house construction in CMWSSB Patel Nagar (Chennai)

PROJECT-II:

Apprentice Trainee في LAVANYA CONSULTANCY - INDIA (TAMIL NADU)
  • الهند
  • أغسطس 1997 إلى أغسطس 1998

Position Held: Apprentice Trainee.
Period: August- 1997 to August- 1998.
Responsibility: ➢ Responsible for preparation of master plan, detailed development plan and layout drawings for various cities and all coastal areas

M/s. LAVANYA CONSULTANCY - INDIA (TAMIL NADU)

Site Supervisor في LAVANYA CONSULTANCY - INDIA (TAMIL NADU
  • مايو 1996 إلى مايو 1997

Position Held: Site Supervisor.
Period: May 1996 to May 1997.
Responsibility: ➢ Responsible for the supervision of individual houses, residential building, and industrial structure


Yours Faithfully

(00919487050213)

Sr.Project Engineer في Value of Project
  • إلى
Development of Water Supply System in Fujairah في Name of Project
  • إلى

SR.PROJECT ENGINEER

WORK EXPERIENCE: 16 YEARS -10 Months (10 YEARS - UAE)

ADDRESS IN INDIA: 6/8B NORTH STREET
AYYANARUTHU (P.O)
KAYATHAR (VIA)

Sr.Project Engineer في Federal Electricity and Water Authority
  • الهند
  • إلى

TUTICORIN DISTRICT
TAMIL NADU
INDIA.

PASSPORT NO: G3314566
U.A.E.
EXPECTED SALARY: Negotiable
JOINING TIME REQUIRED TIME: 1 Month.

CURRICULAM VITAE
COPETECIES
Basic planning of assigned job at the execution level inter relating different activities on the critical path and driving the time controlled strategies to render the tasks efficient in managing the manpower force of 300 (max) workmen including supervision site engineers and foreman. Distribution of workload as per the capabilities of individuals to achieve smooth flow of work

EMPLOYMENT RECORD
M/s. DHAFIR TECHNOLOGIES L.L.C (February 2011 - March 2013)

PROJECT: II
Name of Project: DN400 Transmission Pipeline from Wadi Sifini to Siji in
Fujairah / Rak
Client: M/s. Federal Electricity and Water Authority
Value of Project: AED 24.7 Million
Position Held: Sr.Project Engineer.

Project Description:
The project includes supply, laying of Ductile Iron pipes and Tank connections from Wadi sifini to Siji Junction (DN 150, DN 200 and DN400)

Responsibility:
➢ The co-ordination between site/management and the client
➢ Preparation of work execution plan, material, machinery and work force requirement
➢ Proposed pipeline route approvals from municipality, road department, public works department etc,
➢ Preparation of the detailed site report to avoid the utilities damage
➢ To ensure the safety measures for the fast work execution.
➢ Taking NOC from the entire Department
➢ Preparation of drawings and getting approvals from the concern department
➢ All the parallel activities related the pipeline works like pressure testing, laying of FOC, construction of valve chamber, thrust block for the bends, tapers, etc.
➢ Testing and commissioning including sterilization of the constructed pipeline project.


PROJECT: I
Name of Project: Development of Water Supply System in Fujairah
Client: M/s. Federal Electricity and Water Authority
Value of Project: AED 13.6 Million
Position Held: Sr.Project Engineer

Project Description:
The project includes R.C.C. Over Head Water tanks, supply, laying of Ductile Iron pipes and Tanks connection from Afarah to Ohela and Kidna to Farfar Wadi Sham (DN 80 to DN250)

Responsibility:
All type of construction activities like survey, Co-ordination of Soft drawing preparation, Municipality route approvals, NOC from the all Utility authorities, Drawing client approvals for work execution, Project Execution, Site work certification etc.

Consultant في Home Of Architecture
  • الإمارات العربية المتحدة
  • إلى
Sr. Project Engineer في AED 5 Million
  • إلى
Consultant في RAK Investment Authority
  • إلى

SR.PROJECT ENGINEER

WORK EXPERIENCE: 16 YEARS -10 Months (10 YEARS - UAE)

ADDRESS IN INDIA: 6/8B NORTH STREET
AYYANARUTHU (P.O)
KAYATHAR (VIA)

Sr. Project Engineer في AED 10 Million
  • الهند
  • إلى

TUTICORIN DISTRICT
TAMIL NADU
INDIA.

PASSPORT NO: G3314566
U.A.E.
EXPECTED SALARY: Negotiable
JOINING TIME REQUIRED TIME: 1 Month.

CURRICULAM VITAE
COPETECIES
Basic planning of assigned job at the execution level inter relating different activities on the critical path and driving the time controlled strategies to render the tasks efficient in managing the manpower force of 300 (max) workmen including supervision site engineers and foreman. Distribution of workload as per the capabilities of individuals to achieve smooth flow of work

EMPLOYMENT RECORD
M/s. DHAFIR TECHNOLOGIES L.L.C (February 2011 - March 2013)

PROJECT: II
Name of Project: DN400 Transmission Pipeline from Wadi Sifini to Siji in
Fujairah / Rak
Client: M/s. Federal Electricity and Water Authority
Value of Project: AED 24.7 Million
Position Held: Sr.Project Engineer.

Project Description:
The project includes supply, laying of Ductile Iron pipes and Tank connections from Wadi sifini to Siji Junction (DN 150, DN 200 and DN400)

Responsibility:
➢ The co-ordination between site/management and the client
➢ Preparation of work execution plan, material, machinery and work force requirement
➢ Proposed pipeline route approvals from municipality, road department, public works department etc,
➢ Preparation of the detailed site report to avoid the utilities damage
➢ To ensure the safety measures for the fast work execution.
➢ Taking NOC from the entire Department
➢ Preparation of drawings and getting approvals from the concern department
➢ All the parallel activities related the pipeline works like pressure testing, laying of FOC, construction of valve chamber, thrust block for the bends, tapers, etc.
➢ Testing and commissioning including sterilization of the constructed pipeline project.


PROJECT: I
Name of Project: Development of Water Supply System in Fujairah
Client: M/s. Federal Electricity and Water Authority
Value of Project: AED 13.6 Million
Position Held: Sr.Project Engineer

Project Description:
The project includes R.C.C. Over Head Water tanks, supply, laying of Ductile Iron pipes and Tanks connection from Afarah to Ohela and Kidna to Farfar Wadi Sham (DN 80 to DN250)

Responsibility:
All type of construction activities like survey, Co-ordination of Soft drawing preparation, Municipality route approvals, NOC from the all Utility authorities, Drawing client approvals for work execution, Project Execution, Site work certification etc.

M/s. ELETRO RAK L.L.C - RAS AL KHAIMAH (May 2008 - February 2011)

PROJECT-I:
Name of Project: Al Hamra Village Vacuum Sewerage System
Client: M/s. RAK Investment Authority
Consultant: M/s. Home Of Architecture
Value of Project: AED 5 Million
Position Held: Sr. Project Engineer

PROJECT-II:
Name of Project: RAKIA Industrial Free Zone-Vacuum Sewerage System
Client: M/s. RAK Investment Authority
Consultant: M/s. Home Of Architecture
Value of Project: AED 5 Millions
Position Held: Sr. Project Engineer

Project Description:
Installation of vacuum sewerage system using vacuum pump with vacuum vessel, vacuum equipment and installation of HDPE Pipe up to Od500, SDR- 11. (Ready vac system)

PROJECT-III:
Name of Project: BANYAN TREE - Vacuum Sewerage System
Client: M/s. RAKEEN
Consultant: M/s. Home Of Architecture
Value of Project: AED 10 Million
Position Held: Sr. Project Engineer


Project Description:
Installation of R.C.C. Structures in Vacuum Sewerage System Using Vacuum Pump With Vacuum Vessel, Vacuum Equipment and installation of HDPE Pipe up to Od350, SDR 11 (Ready vac system)

Responsibility
➢ Preparation of GOVERNMENT TENDERS & BIDDING for (FEWA, DEWA, SEWA& RAKIA) and submitting to the client
➢ Responsible for executing all the project activities, coordination with client and consultant
➢ Preparation and execution of the project work as per the scheduled project period
➢ Responsible for the work force, Plant & Machinery requirement to complete the projects successfully
➢ Finalize the sub-contractors for the projects requirement to complete the projects as per the scheduled projects period.
➢ Prepare the weekly, Monthly report to submit our project management.
➢ Responsible for co-ordination between the site and office officials
➢ Takeover the projects as per ISO SAFETY Standards
➢ Reporting to project manager, Getting reports from the project engineers

Authorities
➢ Authorized to prepare the supporting documents for billing works, as per the consultant & client requirement
➢ Authorized to accept joint measurements with consultant for the carried out through project engineers
➢ Authorized to take decision in my area of operation for the target achievement and quality of works
➢ Authorized to attend the project meeting with client and consultant
➢ Authorized to get the drawing approvals from the consultant and client

Sr. Project Engineer في Abu Dhabi Water & Electricity Authority
  • الهند
  • إلى

TUTICORIN DISTRICT
TAMIL NADU
INDIA.

PASSPORT NO: G3314566
U.A.E.
EXPECTED SALARY: Negotiable
JOINING TIME REQUIRED TIME: 1 Month.

CURRICULAM VITAE
COPETECIES
Basic planning of assigned job at the execution level inter relating different activities on the critical path and driving the time controlled strategies to render the tasks efficient in managing the manpower force of 300 (max) workmen including supervision site engineers and foreman. Distribution of workload as per the capabilities of individuals to achieve smooth flow of work

EMPLOYMENT RECORD
M/s. DHAFIR TECHNOLOGIES L.L.C (February 2011 - March 2013)

PROJECT: II
Name of Project: DN400 Transmission Pipeline from Wadi Sifini to Siji in
Fujairah / Rak
Client: M/s. Federal Electricity and Water Authority
Value of Project: AED 24.7 Million
Position Held: Sr.Project Engineer.

Project Description:
The project includes supply, laying of Ductile Iron pipes and Tank connections from Wadi sifini to Siji Junction (DN 150, DN 200 and DN400)

Responsibility:
➢ The co-ordination between site/management and the client
➢ Preparation of work execution plan, material, machinery and work force requirement
➢ Proposed pipeline route approvals from municipality, road department, public works department etc,
➢ Preparation of the detailed site report to avoid the utilities damage
➢ To ensure the safety measures for the fast work execution.
➢ Taking NOC from the entire Department
➢ Preparation of drawings and getting approvals from the concern department
➢ All the parallel activities related the pipeline works like pressure testing, laying of FOC, construction of valve chamber, thrust block for the bends, tapers, etc.
➢ Testing and commissioning including sterilization of the constructed pipeline project.


PROJECT: I
Name of Project: Development of Water Supply System in Fujairah
Client: M/s. Federal Electricity and Water Authority
Value of Project: AED 13.6 Million
Position Held: Sr.Project Engineer

Project Description:
The project includes R.C.C. Over Head Water tanks, supply, laying of Ductile Iron pipes and Tanks connection from Afarah to Ohela and Kidna to Farfar Wadi Sham (DN 80 to DN250)

Responsibility:
All type of construction activities like survey, Co-ordination of Soft drawing preparation, Municipality route approvals, NOC from the all Utility authorities, Drawing client approvals for work execution, Project Execution, Site work certification etc.

M/s. ELETRO RAK L.L.C - RAS AL KHAIMAH (May 2008 - February 2011)

PROJECT-I:
Name of Project: Al Hamra Village Vacuum Sewerage System
Client: M/s. RAK Investment Authority
Consultant: M/s. Home Of Architecture
Value of Project: AED 5 Million
Position Held: Sr. Project Engineer

PROJECT-II:
Name of Project: RAKIA Industrial Free Zone-Vacuum Sewerage System
Client: M/s. RAK Investment Authority
Consultant: M/s. Home Of Architecture
Value of Project: AED 5 Millions
Position Held: Sr. Project Engineer

Project Description:
Installation of vacuum sewerage system using vacuum pump with vacuum vessel, vacuum equipment and installation of HDPE Pipe up to Od500, SDR- 11. (Ready vac system)

PROJECT-III:
Name of Project: BANYAN TREE - Vacuum Sewerage System
Client: M/s. RAKEEN
Consultant: M/s. Home Of Architecture
Value of Project: AED 10 Million
Position Held: Sr. Project Engineer


Project Description:
Installation of R.C.C. Structures in Vacuum Sewerage System Using Vacuum Pump With Vacuum Vessel, Vacuum Equipment and installation of HDPE Pipe up to Od350, SDR 11 (Ready vac system)

Responsibility
➢ Preparation of GOVERNMENT TENDERS & BIDDING for (FEWA, DEWA, SEWA& RAKIA) and submitting to the client
➢ Responsible for executing all the project activities, coordination with client and consultant
➢ Preparation and execution of the project work as per the scheduled project period
➢ Responsible for the work force, Plant & Machinery requirement to complete the projects successfully
➢ Finalize the sub-contractors for the projects requirement to complete the projects as per the scheduled projects period.
➢ Prepare the weekly, Monthly report to submit our project management.
➢ Responsible for co-ordination between the site and office officials
➢ Takeover the projects as per ISO SAFETY Standards
➢ Reporting to project manager, Getting reports from the project engineers

Authorities
➢ Authorized to prepare the supporting documents for billing works, as per the consultant & client requirement
➢ Authorized to accept joint measurements with consultant for the carried out through project engineers
➢ Authorized to take decision in my area of operation for the target achievement and quality of works
➢ Authorized to attend the project meeting with client and consultant
➢ Authorized to get the drawing approvals from the consultant and client


M/s. TECTON ENGINEERING & CONSTRUCTION L.L.C- AJMAN - UAE (January 2005 to May 2008)

PROJECT-I:
Name of Project: Water supply system to JAZEERAT-AL HAMRA, FEWA
DEWA & SEWA from the FUJAIRA Water Transmission
Scheme (FWTS)

Sr. Project Engineer في Ajman Sewerage Committee
  • الهند
  • إلى

TUTICORIN DISTRICT
TAMIL NADU
INDIA.

PASSPORT NO: G3314566
U.A.E.
EXPECTED SALARY: Negotiable
JOINING TIME REQUIRED TIME: 1 Month.

CURRICULAM VITAE
COPETECIES
Basic planning of assigned job at the execution level inter relating different activities on the critical path and driving the time controlled strategies to render the tasks efficient in managing the manpower force of 300 (max) workmen including supervision site engineers and foreman. Distribution of workload as per the capabilities of individuals to achieve smooth flow of work

EMPLOYMENT RECORD
M/s. DHAFIR TECHNOLOGIES L.L.C (February 2011 - March 2013)

PROJECT: II
Name of Project: DN400 Transmission Pipeline from Wadi Sifini to Siji in
Fujairah / Rak
Client: M/s. Federal Electricity and Water Authority
Value of Project: AED 24.7 Million
Position Held: Sr.Project Engineer.

Project Description:
The project includes supply, laying of Ductile Iron pipes and Tank connections from Wadi sifini to Siji Junction (DN 150, DN 200 and DN400)

Responsibility:
➢ The co-ordination between site/management and the client
➢ Preparation of work execution plan, material, machinery and work force requirement
➢ Proposed pipeline route approvals from municipality, road department, public works department etc,
➢ Preparation of the detailed site report to avoid the utilities damage
➢ To ensure the safety measures for the fast work execution.
➢ Taking NOC from the entire Department
➢ Preparation of drawings and getting approvals from the concern department
➢ All the parallel activities related the pipeline works like pressure testing, laying of FOC, construction of valve chamber, thrust block for the bends, tapers, etc.
➢ Testing and commissioning including sterilization of the constructed pipeline project.


PROJECT: I
Name of Project: Development of Water Supply System in Fujairah
Client: M/s. Federal Electricity and Water Authority
Value of Project: AED 13.6 Million
Position Held: Sr.Project Engineer

Project Description:
The project includes R.C.C. Over Head Water tanks, supply, laying of Ductile Iron pipes and Tanks connection from Afarah to Ohela and Kidna to Farfar Wadi Sham (DN 80 to DN250)

Responsibility:
All type of construction activities like survey, Co-ordination of Soft drawing preparation, Municipality route approvals, NOC from the all Utility authorities, Drawing client approvals for work execution, Project Execution, Site work certification etc.

M/s. ELETRO RAK L.L.C - RAS AL KHAIMAH (May 2008 - February 2011)

PROJECT-I:
Name of Project: Al Hamra Village Vacuum Sewerage System
Client: M/s. RAK Investment Authority
Consultant: M/s. Home Of Architecture
Value of Project: AED 5 Million
Position Held: Sr. Project Engineer

PROJECT-II:
Name of Project: RAKIA Industrial Free Zone-Vacuum Sewerage System
Client: M/s. RAK Investment Authority
Consultant: M/s. Home Of Architecture
Value of Project: AED 5 Millions
Position Held: Sr. Project Engineer

Project Description:
Installation of vacuum sewerage system using vacuum pump with vacuum vessel, vacuum equipment and installation of HDPE Pipe up to Od500, SDR- 11. (Ready vac system)

PROJECT-III:
Name of Project: BANYAN TREE - Vacuum Sewerage System
Client: M/s. RAKEEN
Consultant: M/s. Home Of Architecture
Value of Project: AED 10 Million
Position Held: Sr. Project Engineer


Project Description:
Installation of R.C.C. Structures in Vacuum Sewerage System Using Vacuum Pump With Vacuum Vessel, Vacuum Equipment and installation of HDPE Pipe up to Od350, SDR 11 (Ready vac system)

Responsibility
➢ Preparation of GOVERNMENT TENDERS & BIDDING for (FEWA, DEWA, SEWA& RAKIA) and submitting to the client
➢ Responsible for executing all the project activities, coordination with client and consultant
➢ Preparation and execution of the project work as per the scheduled project period
➢ Responsible for the work force, Plant & Machinery requirement to complete the projects successfully
➢ Finalize the sub-contractors for the projects requirement to complete the projects as per the scheduled projects period.
➢ Prepare the weekly, Monthly report to submit our project management.
➢ Responsible for co-ordination between the site and office officials
➢ Takeover the projects as per ISO SAFETY Standards
➢ Reporting to project manager, Getting reports from the project engineers

Authorities
➢ Authorized to prepare the supporting documents for billing works, as per the consultant & client requirement
➢ Authorized to accept joint measurements with consultant for the carried out through project engineers
➢ Authorized to take decision in my area of operation for the target achievement and quality of works
➢ Authorized to attend the project meeting with client and consultant
➢ Authorized to get the drawing approvals from the consultant and client


M/s. TECTON ENGINEERING & CONSTRUCTION L.L.C- AJMAN - UAE (January 2005 to May 2008)

PROJECT-I:
Name of Project: Water supply system to JAZEERAT-AL HAMRA, FEWA
DEWA & SEWA from the FUJAIRA Water Transmission
Scheme (FWTS)
Client: M/s. Abu Dhabi Water & Electricity Authority
Consultant: M/s. TEBODIN Consultant &.Engineers
Value of Project: AED 170 Million
Position Held: Project Engineer / Team Leader.
Period: May 2006 to May 2008
Project Description:
The project scope of work includes R.C.C. structures, tanks, laying of 70 Km of DN800 C.S Pipes, 40 Km of DN600 D.I. Pipes to connect with Steel tanks of 2 x 5 MIG, Concrete reservoirs 2 MIG, Chlorination system, SCADA etc. the bulk of which passes through the harsh terrain of Northern Emirates.

Responsibility
➢ Responsible for executing the works as per the frame of the contract
➢ Reporting to the construction manager, Getting report from the Site Engineer, Supervisors, Surveyors etc
➢ Preparing the daily programme, weekly planning and monthly target achievement, planning and execution
➢ The site level planning and executing the works and monitoring the progress in quality and safety aspect
➢ Responsible for parallel activities like construction of A.V Chamber, W.O. Chamber, L.V. Chamber, & W.M. Chamber, Construction of thrust block & other construction work related to pipe laying projects.
➢ Pre-Planning and conducting Hydrostatics Test in TYCO water pipes (C.S. Pipes with sintakote coating) and Ductile Iron pipes PN 42, P.N 32, and P.N 16.
➢ Laying of F.O.C with warning tape & warning tiles.
➢ Responsible for liaison with client and our management for my area activities
➢ The testing, commissioning & handing over the projects as per the contract agreement

PROJECT-II:
Name of Project: Installation of Water Transmission Pipe Line Work in
Northern Emirates
Client: M/s. Federal Electricity and Water Authority
Value of Project: AED 55 Million
Position Held: Project Engineer / Team Leader.
Period: January 2005 to May 2006.
Project Description:
Installation, testing and commissioning of 135 Km of DI (DN100 to DN350) & AC Pipes (DN100 to DN400) and associated works in Northern Emirates

Responsibility:
➢ Responsible for all pipe Line installation activities like excavation of trenches, Pipes laying, construction of valve chambers with complete fitting connections, Hydrostatics test (Pressure limit 15Bar, 32Bar), other activities etc.
➢ Leading the core team of 2 Engineer, 3 Surveyor, 3 Site supervisors, 2 Asst. Surveyors, 150 Workers.
➢ For client inspection and consultant dealing for smooth flow of pipe line project activates and achievements of target.


M/s. ESSA ENGINEERING CONSTRUCTION L.L.C - AJMAN (UAE)
PROJECT:
Name of Project: Ajman Sewerage System

الخلفية التعليمية

بكالوريوس, CIVIL ENGINEERING

DIPLOMA IN CIVIL ENGINEERING

Specialties & Skills

CONCRETE
ENGINEER
LIAISON
MILLION
PIPELINE
PROJECT ENGINEER
TESTING
WATER SUPPLY

اللغات

الهندية
مبتدئ
الانجليزية
مبتدئ
التاميلية
مبتدئ