Electrical Engineer
FEMCO
مجموع سنوات الخبرة :4 years, 3 أشهر
• Projects design review and modification
• Projects technical evaluation
• Projects cost estimation
• Projects material quotations
• Equipment verifying
• Preparing projects material take-off
• Equipment testing inspection
-SWCC water supply connection in Dhahran project:
• Inspection of testing and termination of low voltage cables
• Inspection of testing rectifiers used for cathodic protection
• inspection of testing of main circuit breakers and associated switchgear
-Voltage conversion at Dhahran camp houses project:
• Inspection of receiving and testing Package substations
• Inspection of receiving and testing panelboards
• Inspection of receiving and testing transformers
•Preparing Non Material Requisition documents (NMR602).
• Developing the program and system for Remote Terminal Unit (RTU) and Emergency Shut Down system.
• PreFAT for RTU and ESD system for the project in ISCOSA
• Performing FAT for Remote Terminal Unit (RTU) and Emergency Shut Down (ESD) panels.
My senior project was Higheay Wind Power Generation. The idea of the project, in short, is to convert wind energy generated due to pressure difference between the lanes on the highaws into electrical energy using a vertical axis wind turbine and a permanent magnet synchronos generator. I was once awarded first honor achievement and once second honor achievement during my study in the BSc degree.