Loiy Khalil, Transmission Planning Senior Engineer

Loiy Khalil

Transmission Planning Senior Engineer

Wataniya Mobile

Lieu
Palestine - Cisjordanie
Éducation
Baccalauréat, Electrical/Communications Engineering
Expérience
18 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 1 Mois

Transmission Planning Senior Engineer à Wataniya Mobile
  • Palestine
  • Je travaille ici depuis mai 2010

Planning & designing of Microwave backhaul (Ericsson, Aviat, Ceragon) & Optical backbone (ECI) network for West Bank & Gaza Strip. Preparing annual budget, preparing projects time plan.

Operation & maintenance Engineer à Marathon for telecom and contracting
  • Palestine - Cisjordanie
  • février 2010 à avril 2010

Installation and commissioning of Ericsson transmission and RBS system.

Electrical Engineer à Al-Safa Engineering Co. for Electrical Contracting
  • Palestine - Cisjordanie
  • octobre 2009 à janvier 2010

-Supervising electrical works, Low voltage, CCTV installation..
-Reviwing BoQs and ordaring materials.
-Updating design drawings.

IE Engineer for Mobily Account. à Ericsson AB (Out-Sourcing)
  • Arabie Saoudite - Riyad
  • octobre 2008 à février 2009

Responsibilities and Authorities
· Perform the site engineering work in accordance with Ericsson procedures and with respect to customer’s directives.
· Follow guides and rules of the Site Engineering Process.
· Question faulty or incomplete input data.
· Maintain high quality engineering standards.
· Provide support on technical issues to customers and ASPs in agreement with project management.


Main activities
· Perform site investigations in field and record data in SIR.
· Prepare Site Material Request (SMR) for Radio, TRM or Power equipment based upon customer requirements.
· Prepare and submit Civil Works and Floor Plan proposals based upon costumer requirements.
· Create Site Installation Documentation (SID).
· Update SID into As-Built SID after finalized installation.
· Interact with IE coordinator, Network Design, Civil Work and Implementation regarding SE technical issues.
· To participate in project meetings to ensure proper coordination of SE activities within overall project requirements.

Installation Engineering Coordinator à CSC (Communication solution Company)
  • Arabie Saoudite
  • janvier 2007 à octobre 2008

I played a key role with CSC as an Installation Engineering Coordinator for Ericsson projects in MUKSA for STC Operator (3G1, DXX, 3G1 Upscope, 3G2, 3G3 and C&I projects) and the main tasks were:

• Receiving work order from Ericsson management and distribute tasks to CSC field engineers.
• Follow up with teams and provide Ericsson with updated tracking reports.
• Preparation of Site Installation Document (SID) updating all information on Ericsson Server & through the site handler.
• Support and help of engineers in the site for installation, traffic routing and integration.
• Provide required training for new engineers for installation, configuration, software upgrade and quality standards.
• Support & Help of draughtsman in the office for the preparation of Power & TRM Signaling Drawing for IE’s.
• Coordination with design Engineers if some problems faced.
• Provide all sites with requested materials.
• Apply for MDT’s (Maintenance Down Time).
• Coordinate with the customer to complete PAT (Preliminary Acceptance Test) at required time.
• Mini-Link installation (HC & TN 2, 6, 20P & Minilink E), configuration, alignment, troubleshooting and traffic routing for E1s and integration using MINI-LINK Craft 1.2 or MSM .
• Transfer traffic (cut-over) from old microwave system to new Ericsson TN during MDT and configure R3 TN.
• Configuration of DCN and IP addresses for Traffic Node.
• Installation, commissioning and troubleshooting for RBS2000 series (2206, 2302, 2308, 2216) using OMT software.
• Installation, commissioning and loading scripts for Ericsson Node B (RBS3206) using EMAS SW.
• Perform Test Call and Handover Test for GSM and WCDMA sites using TEMS Investigation or TEMS Pocket (Sony Ericsson Z750i).
• Installation, configuration, integration and troubleshooting of ADM Tellabs DXX 6340 using Tellabs 6300 Craft terminal SW.

Transmission & Radio Frequency Tester (Filed Engineer): à NoviaCom (Exi)
  • Arabie Saoudite
  • janvier 2006 à décembre 2006

Transmission system (MINILINK based on Ericsson)
• Transmission principles and networking.
• Implement transmission plans and configuration.
• Minilink installation (Traffic nodes types 2, 6, 20 P& Minilink E) installation, configuration and alignment.
• SDH Minilink high capacity (HC) installation, configuration, alignment & Equipment & Line Protection (ELP).
• Transmission links test for connectivity & troubleshooting.
• E1 routing & Traffic routing (cross connections).
• Links upgrade Hardware and software.
• PDH & SDH networks.

GSM system (RBS 2000 series based on Ericsson)
• RBS 2202 & 2206 installation
• Implement and configure DXU with new IDB for RBS 2202 & 2206.
• Commissioning and preparing RBS cabinet for integration and bring all sector on air in cooperation with BSS.
• Testing alarms with OMC and making test call using TEMS.
• TRU expansion of Ericsson RBS 2206.
• Antenna system tests using Anritsu site master and site master handheld and cable attenuation.

Trainee engineer à JCAA (Jordan Civil Aviation Authority) – Jordan – Amman- Marka Airport
  • Jordanie
  • juin 2005 à septembre 2005

• I worked in JCAA as Trainee engineer, the major training areas were (microwave system, navigation system and Telecom system in addition with the work with the department).

Éducation

Baccalauréat, Electrical/Communications Engineering
  • à Mu'tah University
  • janvier 2006

Specialties & Skills

Microwave
Installation
• Ready to work under the pressure.
• MS Office (Word, Excel, FrontPage, Power point and Outlook).
• Able to learn new technologies rapidly.
• Good team player

Langues

Arabe
Expert
Anglais
Moyen

Adhésions

Jordan Engineers Association (JEA)
  • The Membership of this Association in Telecommunication Engineering Branch
  • March 2006

Formation et Diplômes

• MPLS-TP Technology (Formation)
Institut de formation:
Eci Training center
Date de la formation:
June 2014
Introduction to DXX Tellabs 6340 Switch Node; Ericsson course for ASP. (Formation)
Institut de formation:
Ericsson Education Middle East
Date de la formation:
February 2008
RBS3000 Installation Overview (Introduction to 3G Node-B On-site Integration); (Formation)
Institut de formation:
Ericsson Education Middle East. KSA
Date de la formation:
April 2008
Mini-Link TN configuration (Formation)
Institut de formation:
Ericsson Education Middle East
Date de la formation:
February 2008
Training on Mentum Ellipse 7&8 planning tool (Formation)
Institut de formation:
Mentum Training Center, Velizy, France
Date de la formation:
June 2011
Mini-Link Overview (TN & HC DCN configuration); (Formation)
Institut de formation:
Ericsson Education Middle East
Date de la formation:
April 2008
Three days training on data communications network design (Formation)
Institut de formation:
Ericsson Academy, Gothenburg Sweden
Date de la formation:
October 2012
training course on BG family SDH & Ethernet nodes and its network management system (Formation)
Institut de formation:
Eci Training Center
Date de la formation:
May 2012