Full scope of as an electrical contractor for commercial and industrial establishments design, supply, install, testing and commissioning, Project turnover, maintenance and service services.

Project Coordinator Engineer à Growtech Trading and Industrial Group
  • Qatar - Doha
  • août 2007 à mars 2019

Manage the coordination, scheduling and project execution which include but not limited to;
 Preparation of tender documents for submittals, quotations, drawings plans, and material submittals for client presentation.
 Responsible in designing, planning and layout of showrooms, restaurants, food chains/outlets, retail shops, manufacturing/production facilities, hotels, and industrial lines, commissaries, bulk cookings, Storage, Coldrooms, Commercial/Industrial laundry, steam boilers and system piping, Fire protections for Cooking lines, Centralized Exhaust hood Ventilations for commercial/hotel cooking lines,
 Preparation of required Electrical plans such as General notes Legends to be used Abbreviations, Design Parameters and Electrical Standards, Lighting layout, Power layout, Load Schedule for Distribution Board, Summary of Main Service Distribution Board, schedule Single Line Diagram for Main Service Distribution for use in commercial/industrial buildings, and hotels.
 Preparation of Fire Alarm Electrical System, Legends, Notes. Design Criteria. General Standards, Fire Alarm Layout, Sectional Details, Site Location Plans, and Fire Alarm Riser Diagram.
 Preparation of Telephone Outlet layout, Telephone Service Site Plan Layout
 Responsible for the project management in regards to interior construction, and renovations.

 Manage in the Preparation and timely approval of below sequence of Project requirements:
- Confirmation of Client, Contractor and Engineers Instructions
- Project daily/Weekly reports
- Request for Information
- Material Approval Submittal
- Shop Drawing Submittals
-\[Equipment Layout, Mechanical/Plumbing Layout, Lighting and power layout Main and Service Distribution Equipment Load Schedule Plan, Electrical Single Line Diagram, Equipment Ventilation layout, Equipment Fire Protection (Ansul System), Temperature Monitoring Systems for Cold rooms, Laundry and Steam Boiler machine piping and layout\]
- Site Inspection Request
- Material inspection Request
- Technical submittals
- Method of Statement
- Design Calculation and Details
- Operation and Maintenance Manual Submittals
- Request for Proposal of Alternative (Materials, Equipment’s, etc.)
- Non-conformance notification report
- Subcontractor - Supplier Approval request
- Equipment, Material Test report Submittals
- Accident - Incident Notification Reports

 Prepare reports and correspondences for proper project assessment.
 Attend meetings as the company representative for proper project coordination, the client meets up and other agencies' concerns.
 Key person in the signing and approval of Final quotation, Tender Submissions, and Procurement of approved types of equipment and materials.
 Key Person in the preparation of the Program work schedule of the awarded Project.
 Key Person in the Preparation of methods for use in the testing and commissioning of approved types of equipment.
 Key person in the preparation of the Asbuilt drawing for the awarded Project.
 Turnkey project management.

Doha Qatar/ Project Handled / Project Involved:
Applebee’s Restaurant, Chilli’s Restaurant, Qatar Airway’s Catering Co. TGI-Fridays, Costa Coffee, Starbucks Café, Nando’s Restaurant, Pizza Express, Safeer Restaurant, Sheraton Hotel, Hilton Hotel, Al-Sharq Hotel & SPA, Ritz Carlton, Holiday Villa, Al Sharq Hotel and SPA,
Al Khayat Contracting Co. (Emir’sPalace)
Drake and Skull (Al Rayyan Palace)
Albandary Eng’g. (P88, P95, P112A & B, P113 B & C, P105, P119, P145, P147, Naval Base, Naval Academy, NCO, and Mess Club Infrastructure)
ArabTec Const. (P16 Mshereib Hotel Doha Downtown,
Harinsa Contracting Co. (Waldorf Astoria Hotel, JW Marriott Hotel)

Technical Engineer à Middleby Worldwide Philippines
  • Philippines
  • juillet 2003 à juin 2007

Specific Duties and Responsibilities:
 In-Charge in the Preparation of Drawing plans such as equipment layout, electrical and Mechanical layout needed by the specified equipment to be included in the Main Drawing plans of the Architectural firm.
 Study, review and analyze project documents including plans, specifications, general terms and conditions, and addenda.
 Conduct Inspection and Technical Evaluation for the Conformity of Specifications done by the Sub-Contractor.
 Coordinate with Civil, Architectural, Electrical and other trades concerning Electromechanical needs of the specified types of equipment works such as Plumbing, Fire Protection System, and HVAC
 Assist Project and Site Managers for the Safe Implementation and Installation, Monitor and Supervise for a Time Scheduled Work.
 Attends Coordination meeting with the Client, Consultant, Project Managers regarding Project Status problem encountered at the site and its possible solution.
 Prepares Submittals, Correspondence letters to be presented to the Construction Management.
 Issued Site instruction, Conformance/Non-conformance Report, Correspondence Letter to the Construction Management.
 Supervised Testing and Commissioning.

Design Engineer à Middleby Philippines Corp.
  • Philippines
  • mai 2000 à juillet 2003

Specific Duties and Responsibilities:
 Directly involved in Designing, Costing and material specification needed in the manufacture of cooking types of equipment such as deep fat fryers, high/low cooking types of equipment, hot/holding types of equipment, Reach-in chillers/freezers, conveyor ovens.
 Prepare Design Drawing, Shop Drawing Bill of materials and As-Built Drawing using Auto-Cad, Solidedge for use in the production line
 Develop procedures and work standardization to ensure a smooth flow in the production line, Coordinate to R and D Dept. regarding product change notice or improvement of the equipment.

Project Engineer à Design-Tek International
  • Philippines
  • juillet 1997 à mai 2000

Types of Project:
Preparation of plans and Installation of electrical, Mechanical System, Fire Protection System, Exhaust Ventilation, Low Voltage Electrical Distribution Design and Construction, Background Music and Paging System, CCTV Systems, Lightings System and Architectural Finishes.

Client / Project Handled / Project Involved:
NAIA IPT3 International Airport, Sheraton Marina Hotel, Hyatt Regency Hotel, Marco Polo Hotel, Pioneer Highlands, Le Meridien Hotel, World Trade Center, Ever crest Nasugbu Hotel, Southwood's sports club, 6811 Ayala Avenue Hotel, Cairo Lemeridien Hotel, Suzhou Sheraton Hotel, Mactan Shangri-la renovation, SM Sheraton Hotel. Juhu Beach Resort India, JW Marriott Hotel India, Kenwood Marriot Hotel India.

Specific Duties and Responsibilities:
 Directly involved in the preparation of plans for use in the Construction of all Electrical Works such as Gen. rewiring, cable trays, electrical equipment enclosures, power, lighting, motor installation, and electrical supply for the HVAC, Fire Protection System, Plumbing and Equipment Installation.
 Prepare Shop Drawing, Construction Drawing and As-Built Drawing using Auto-Cad.
 Study, review and analyze project documents including plans, specifications, general terms and conditions, and addenda.
 Attend Pre-Bid meeting, conduct inspection and preparing technical and/or commercial bid proposals.
 Prepared Documentation, Testing and Commissioning for Turn-Over of the Project
 Coordinate and Arranged Inspection of Installed Electrical Works to the Client
 Carry Out Inspection and Quality Control of Installed Electrical Works for the Conformance of Specification and Drawing.
 Conduct Inspection of Electrical Works, Visual and Dimensional as per Approved Drawing.
 Conduct Quality Control on the Installation of power, motor control, lighting cabinets cable trays and electrical piping
 Issued Site Instruction, Conformance/Non-Conformance Report to the Construction Management.

Leadman, Electrician, Draftsman à JJPD Electrical Services
  • Philippines
  • mars 1996 à mars 1997

Types of Project
Designers, engineers, installation, and Services- Commercial, Industrial, and residential

Specific Duties and Responsibilities:
 Perform electrical installations in residential, commercial, and industrial establishments; this involves replacement or new installation of power poles, overhead/underground cables, transformer banks, regulator and capacitor, interfaces with scheduled system/component maintenance, power switching operations, troubleshooting and repair of electrical distributions system.
 Perform tests on motor control circuits, preventive maintenance on industrial motors, such as phase matching, insulation resistance checking, and documentation of test results.
 Perform and execute plans under the direct supervision of a Prof. Elect. Engr.

Éducation

Baccalauréat, Electrical Engineering
  • à Don Mariano Marcos Memorial State University
  • octobre 1996

Advance Reserved Officer Training Course, On the Job Training as per of BSEE Curriculum, Junion Electrician, Lighting stage and Sound reinforcement installer and operator.

Specialties & Skills

Testing and Commissioning
Installation
Coordination
Planning
Solidworks
Computer Technician
Electromechanical skills
Microsoft Office
AutoCadd
Solidedge
Technical Drawing
Draftsmanship
Engineering
Electrical Engineering
Construction
Schematic

Langues

Anglais
Moyen
Filipino
Langue Maternelle

Formation et Diplômes

Registered Master Electrician (Certificat)
Date de la formation:
April 1998
Registered Electrical Engineer (Certificat)
Date de la formation:
July 1997
General Electronincs (Formation)
Institut de formation:
National Manpower and YouthCouncil
Date de la formation:
April 1990
Durée:
960 heures

Loisirs