Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

Luis Mago

Production Responsible

Location:
Venezuela
Education:
Diploma,
Experience:
32 years, 9 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  32 Years, 9 Months   

November 2010 To June 2012

Production Responsible

at ConVerpro
Location : Venezuela
Refinery construction at Puerto La Cruz Venezuela as RP. (Production Responsible).
Project over 485 MM $ (Phase I and II)
November 2009 To November 2010

Mayor Preservation Consultant

at PDVSA GAS
Location : Venezuela
Responsible over all the preservation teams and works to the entire project (PGA) (Fields CSR, CSJ, CZMT, CSA, main stores and warehouse) (1800 MM $) in order to guarantee the functionality of equipments during construction according to specification API-686.
February 2005 To June 2009

Construction Superintendent

at PDVSA - Project Gas Anaco
Location : Venezuela
Construction of the complex “Centro Operative San Joaquin” Installation of nine turbines Mars 100 to increases production to 1400 MQFD, and 36000 BPD of Crude Oil, coordination of all the activities between the ten different contractors working in the complex of Gas & Oil; recollections lines (100 km.) and pipe lines interconnection, also the modification of the five station of recollection to handle the increase of production; Project over 1200 MM $
January 2004 To May 2004

Project Engineer

at CCIC – Subcontractor
Location : Qatar - Doha
Construction activities of Train 4 utility area, LNG Plant.
Head of Plant Shut Down, Train 3 Flare repairs, 146mts high, I.D 42” & 64”.
Specifications followed ASME/ANSI, API, AWS, ASTM, Job Spec. Project over 1500 MM $
February 2002 To January 2004

Preservation Material Maintenance Management, and Section Mechanical Engineer Utility Area.

at FLOUR DANIEL – INELECTRA
Location : Venezuela
Responsibility over all the preservations teams, for the up grading plant of synthetic oil, (Use of new technology in Gas, Liquid and solid Corrosion inhibitors, Desiccants etc) during construction. Rotary and Stationary equipment installation using laser Tech. Vibration analysis etc, Design of routines and procedures for Preventive Maintenance, and Standardisation of lubricants, Leader of subcontractor’s teams for the Pre-commissioning activities of utilities areas. Specifications followed ASME/ANSI, API, AWS, ASTM & AMERIVEN Job Spec. Project over 870 MM $
July 2001 To January 2002

Construction Coordinator Manager.

at PDVSA GAS– Dit Harris. Consultant
Location : Venezuela
Construction of pipelines from oilfields San Joaquin, Santa Ana, Guario, El Roble to compression plats of Santa Ana 1, 2 and 3 as well of the Compression plant of San Joaquin, pipelines of 16” and 26” diameter and hot interconnection between Station and Plants. Anaco.
Pre-commissioning and commissioning activities.
Specifications followed ASME/ANSI, API, AWS, ASTM & PDVSA GAS Job Spec Project over 100 MM $
August 2000 To July 2001

Section Mechanical Engineer

at Foster Wheeler Contractor (DSD-CGI Subcontractor)
Location : Venezuela
Construction and installation of isometrics, Modifications of spools as required by process
Field Engineer in charge of Hydro testing and Pneumatic testing
Pre commissioning activities on COKE plant
Specifications followed ASME/ANSI, API, AWS, ASTM & Sincor / Foster Wheeler Job Spec. Project over 800 MM $
November 1998 To July 2000

Preservation Materials Management

at Kellogg Brown & Root- Parson- Technip- Dit Harris Contractor
Location : Venezuela
Preservation, Preventive and Corrective Maintenance. Corrosion Management for all facilities, responsible of all equipment used in the heavy oil plant up grading units, ( Utility, Coke, Crude up grader, Gas plant, Hydrogen plant, Sulphur plant etc) Rotary and Stationary equipment installation Design of routines and procedures for Preventive Maintenance. Leader of subcontractors teams for the Pre-commissioning activities of utilities areas. Standardisation of lubricants. Specifications followed ASME/ANSI, API, AWS, ASTM & Petrozuata. Project over 1200 MM $
September 1997 To November 1998

Office Manager and Field Engineer.

at CONOCO – Systems MULTIPLEXOR Consultant
Location : Venezuela
Coordination of construction activities in the 200 km of pipelines ( 36” and 20” I.D) Cross country pipelines from ZUATA to JOSE Inspection of Subcontractors during Construction of pipelines. Hydro testing, pre-commissioning and commissioning of pipelines.
Specifications followed ASME/ANSI, API, AWS, ASTM & Petrozuata Job Spec. Project over 500 MM $
March 1994 To August 1997

Corporation Maintenance Manager.

at R.M PROJECT
Location : Venezuela
Lead Engineer of the Maintenance Departments for Preventive and Corrective Maintenance. Design of maintenance routines for the subcontractors during operations. Supervision of subcontractors
Coordination of all the requirements to keep full operation
August 1989 To March 1994

Mechanical Construction Manager

at CABLE BELT – ABB- EDIVIAGRO Contractor
Location : Venezuela
Construction of a cable belt system to transport bauxite from the mine to field storage (I.P.C.) 4, 2 Km long with a drop of 394 Mts. Regenerative system at 4000 Ton per hour. Coordination of the mechanical design & Project Construction, Responsible of Commissioning and turn - over to the client. Project over 120 MM $
June 1984 To August 1989

Project Mechanical Engineer, Maintenance Manager

at EDIVIAGRO, C.A.
Location : Venezuela
Responsible for the maintenance and repairs of all the heavy equipment to support the construction sites. Maintenance and rebuild of asphalt plant, rock crushers and concrete plants, Mechanical Engineer, Maintenance Department high way Barlovento - Miranda. Conintur Dam - Tachira, Maintenance Department high way Valera - Trujjillo, Acarigua - Guanare and Guatire - Kempis
February 1982 To June 1984

Section Mechanical Engineer – Preventive Maintenance

at EDIVIAGRO, VINCCLER, TONORO Contractors
Location : Venezuela
Responsible for preventive maintenance over 2000 different types of heavy equipment, used in the dam construction of Guri. Design, construction and installation of the lubrication module to attend
all the equipment Construction, Installation, Training and Operation of Lubrication Lab spectrograph analysis, Dynamometers for diesel engines, Hydraulic test banks, Diesel injection test banks and Drill Training and Operation with Rotamec, injection of concrete to the base of the dam.
Project over 600 MM $

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
April 1981

Diploma,

at Buckinghamshire University.
Location : High Wycombe, United Kingdom

Specialties & Skills

Construction Superintendent

Construction Management

Project Management

Consultant Coordination

Project Coordination

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Expert

Loading
Loading...
Loading...