Project Manager في Archen Engineering
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ مايو 2016

I am Civil Engineer with MS Degree in Civil Engineering from KFUPM Dhahran KSA. I have more than 30 years experience in construction industry. My core experience is in infrastructural projects and management as well. Nowadays I have been giving my services to Ministry of Interior (MOI) KSA in the capacity of Project Manager. I have looking after two different projects such as Housing Projects and Security projects. Total cost of the projects is SAR 41 Billion.
My basic responsibility is:
. To support the project supervisor in managing the project.
. To report to the MOI-PS on the progress and status of the project.
. To provide the specialist/ Technical support and recommendations to the MOI-PS on project, construction and Technical management affairs.
. To review and escalation of risks and issues to the MOI-PS and HE Deputy Minister in collaboration with TST.
. To attend the executive weekly progress meeting, verifying and assisting with dealing captured items efficiently and effectively.
. To review and assurance of the status and progress reporting on behalf of the TST.
. To review the recommendations on change/variation orders approval.
. To prepare the monthly executive report for the HE Deputy Minister office.
Projects:
• Custodian of Two Holy Mosque King Abdullah Bin Abdul Aziz Projects Phase 2 (KAP 2)
• Cost: SAR. 23.5 Billion
The Project Consist of eight phases with different Contractors throughout the Kingdom of Saudi Arabia. Such as:
• KAP 2 A El Seif Contracting Co. (ESEC)
• KAP 2 B 1 El Seif Contracting Co.. (ESEC)
• KAP 2 B2 Al Arrab Contracting Co. (ACC)
• KAP 2 C1 Al Rashid Trading & Construction Co.(RTCC)
• KAP 2 C2 ABV Roack
• KAP 2 D2 Joannou & Paraskevaides (SA) Ltd Co. (J&P)
• KAP 2 E1 Joannou & Paraskevaides (SA) Ltd Co. (J&P)
• KAP 2 E2 Beijing Emirates Int. Construction (BEC)
There are Facilities like Institute of different authorities running under the Ministry of Interior, Training Camps, Special Force Camps, Hajj & Umrah Camps, Dorms for the Students, Housing for the Staff, Infrastructures etc.
• Southern Border Project (SBHP): There is housing Facilities are under construction for the security forces throughout the border area of the Kingdom. Such as:
- EASTERN REGION
- SOUTHERN REGION
There are 15 sites for housing project is under construction.
• Cost: SAR. 17.5 Billion

Manager Infrastructure في AL Fouzan Contracting and Trading Co.
  • المملكة العربية السعودية - الرياض
  • سبتمبر 2015 إلى مايو 2016

Project:
• Government Agencies Compound Project, Riyadh.
• 30 KM single and double roadways.
• Four interchanges.
• 65 KM transmission DCP with thermal storage.
• Domestic water supply system (L = 35 KM).
• Ground water reservoir of 2500M3.
• Waste water system network of 26 KM.
• 4 lift stations.
• Elevated water tank of 600 M3.
• 275 precast concrete sewage manholes.
• STP 7500 M3/Day
• Storm water system network of 35 KM
• RCC box channel 800 LM.
• 700 precast concrete manholes.
• 1350 precast concrete inlet gullies.
• Primary irrigation system.
• Ground reservoir of 1200M3.
• MV power network of 115 KM.
• 15 Package unit substations of 1000 KVA.
• Street light network.
• Telecom duct bank of 160 KM.
• 1300 precast concrete manholes/hand holes.
• Security and IT system.
• Ducting of 45 KM length.
• 350 manholes/hand holes.
• 350 Security cameras at intersections.

Duties:
• Responsible for all activities related to civil works.
• Monitor all programs related to infrastructural works including the quality assurance and control.
• Initiate the request for inspections with the collaboration of the construction management to check out the survey program for different running activities.
• Prepare and submit the shop drawings for roads plan and profile, storm, sewerage and water supply plan and profiles.
• Prepare the table for storm and sewerage drainage system network for precast concrete manholes and inlet gullies.
• Prepare the details of the isolation valve chambers, air valve chambers and washout chambers for water supply networks.
• Review the construction drawings for improvement.
• Documentary support to QS department.
• Technical coordination between inter discipline for running activities.
• Review and submit the manufacturers, suppliers and materials for approval.
• In-charge of the precast yard for storm, sewerage manholes, valve chambers, inlet gullies, pole foundations, barriers …etc.

Manager Infrastructure في Fouzan Trading and General Contracting
  • المملكة العربية السعودية - الرياض
  • يناير 1994 إلى يناير 1997

Department of Road and Storm Water Drainage System, Municipality of Riyadh

Technical Consultant
  • الإمارات العربية المتحدة
  • يناير 1994 إلى يناير 1997

Department of Road and Storm Water Drainage System, Municipality of Riyadh

Technical Consultant في AMNK Consulting Engineers
  • المملكة العربية السعودية
  • يناير 1988 إلى يناير 1994
Project Manager في AMNK Consulting Engineers
  • المملكة العربية السعودية
  • يناير 1988 إلى يناير 1994

Projects:
•A 100 million M3 capacity water reservoir in Mena in Makkah for Mena Development Authority. The project costs SAR 380 million.
•Construction of 7 tunnels of 3 km length.
•Survey and design of Khadeja Bint Khuwelad Road of 14 km Length.
•Design and supervision on Al Arouba Street of 3 km length. Improvement of Olaya Street of 8.5 km length.
•Concept plan for viaduct at Sharm Al Abhur.
•Construction of Al Nahdah Parkway of 3.3 km length.
•Traffic management study for Old Sanayiah, Riyadh.

Duties:
•Engaged in different design and supervision projects related to water reservoir, road networks, storm water drainage, beautification and improvement

Project Manager في KFUPM
  • المملكة العربية السعودية
  • يناير 1984 إلى يناير 1988
Research Assistant في KFUPM
  • المملكة العربية السعودية
  • يناير 1984 إلى يناير 1988

Research Programs:
•Improvement of signalized intersections.
•Road Taxation.
•Existing roads pavement.
•Evaluation of Dammam-Riyadh Highway (Abqaiq Area

Research Assistant في ATTOCK Cement (PAK) Limited
  • يناير 1982 إلى يناير 1984
Assistant Project Manager في ATTOCK Cement (PAK) Limited
  • يناير 1982 إلى يناير 1984

Projects:
•Cement factory of 2000 tons/day capacity.
•Quarry area.
•Raw mill conveyor.
•Raw mill crusher.
•Quality control building.
•Raw mill cement grinding.
•Raw mill silo of 50M height and 15M depth.
•Rotary clinker.
•Clinker silo of 20M height and 35M depth.
•Cement grinding mill.
•Cement silo of 50M height and 15M depth.
•Cement packing plant.
•Mechanical workshop.
•Factory link road of 7.5 KM length and 7M width.
•Factory internal road of 2.5 KM length and 10 M width.
•Staff housing road of 1.5 Km length and 6M width.
•Staff housing.
•Admin block.
•Dispensary.
•Water reservoir.
•STP.
Duties:
•To track and oversee the construction of Cement Factory.
•Report to General Manager for day to day progress.
•Responsible for Quality Control and Assurance, Verification of Payment Certificates etc.

Assistant Project Manager في Shaheen Builders
  • يناير 1981 إلى يناير 1982
Project Engineer في Shaheen Builders
  • يناير 1981 إلى يناير 1982

Project:
•Grain Storage Shell Project for Pakistan Army. The concrete structure used to rise up to 10 M high with 30 M dia. from the finished grade level by means of air blower.

Duties:
•Responsible for the construction of 44 shells.

Project Engineer في PEMCON Ltd
  • يناير 1979 إلى يناير 1981
Site Engineer في PEMCON Ltd
  • يناير 1979 إلى يناير 1981

Projects:
•500 KV transmission systems.
•Guddu-Ghazighat Project.
•Gravel shell project for hub dam.
•180000 gallon capacity water reservoir.
Duties:
•Responsible for the construction of deep foundation on river Indus for transmission lines, strengthening of hub dam and construction of 180000 gallon capacity water reservoir. The project costs PK RS. 250 million.

Projects Manager في Archen Engineering
  • المملكة العربية السعودية
  • إلى
Site Engineer
  • إلى
Consultant في KAP 2 A El Seif Contracting Co. (ESEC) •KAP 2 B 1 El Seif Contracting Co.. (ESEC) •KAP 2 B2 Al Arrab Contracting Co. (ACC) •KAP 2 C1 Al Rashid Trading & Construction Co.(RTCC) •KAP 2 C2 ABV Roack •KAP 2 D2 Joannou & Paraskevaides (SA) Ltd Co. (J&P) •KAP 2 E1 Joannou & Paraskevaides (SA) Ltd Co. (J&P) •KAP 2 E2 Beijing Emirates Int. Construction
  • إلى

BEC)
There are Facilities like Institute of different authorities running under the Ministry of Interior, Training Camps, Special Force Camps, Hajj & Umrah Camps, Dorms for the Students, Housing for the Staff, Infrastructures etc.
•Southern Border Project (SBHP): There is housing Facilities are under construction for the security forces throughout the border area of the Kingdom. Such as:
•EASTERN REGION
•SOUTHERN REGION
There are 15 sites for housing project is under construction.
•Cost: SAR. 17.5 Billion
Duties:
To assist the PM (MOI) by monitoring the Supervisory

Head في Fouzan Trading and General Contracting
  • المملكة العربية السعودية
  • إلى

Project:
•Government Agencies Compound Project, Riyadh.
•30 KM single and double roadways.
•Four interchanges.
•65 KM transmission DCP with thermal storage.
•Domestic water supply system (L = 35 KM).
•Ground water reservoir of 2500M3.
•Waste water system network of 26 KM.
•4 lift stations.
•Elevated water tank of 600 M3.
•275 precast concrete sewage manholes.
•STP 7500 M3/Day
•Storm water system network of 35 KM
•RCC box channel 800 LM.
•700 precast concrete manholes.
•1350 precast concrete inlet gullies.
•Primary irrigation system.
•Ground reservoir of 1200M3.
•MV power network of 115 KM.
•15 Package unit substations of 1000 KVA.
•Street light network.
•Telecom duct bank of 160 KM.
•1300 precast concrete manholes/hand holes.
•Security and IT system.
•Ducting of 45 KM length.
•350 manholes/hand holes.
•350 Security cameras at intersections.

Duties:
•Responsible for all activities related to civil works.
•Monitor all programs related to infrastructural works including the quality assurance and control.
•Initiate the request for inspections with the collaboration of the construction management to check out the survey program for different running activities.
•Prepare and submit the shop drawings for roads plan and profile, storm, sewerage and water supply plan and profiles.
•Prepare the table for storm and sewerage drainage system network for precast concrete manholes and inlet gullies.
•Prepare the details of the isolation valve chambers, air valve chambers and washout chambers for water supply networks.
•Review the construction drawings for improvement.
•Documentary support to QS department.
•Technical coordination between inter discipline for running activities.
•Review and submit the manufacturers, suppliers and materials for approval.
•In-charge of the precast yard for storm, sewerage manholes, valve chambers, inlet gullies, pole foundations, barriers …etc.

الخلفية التعليمية

ماجستير, Civil Engineering
  • في King Fahd University of Petroleum and Minerals
  • يناير 1987
بكالوريوس, Civil Engineering
  • في NED University of Engineering and Technology

in

Specialties & Skills

Project Management
GENERAL MANAGEMENT
MECHANICAL
MICROSOFT WINDOWS 2000
NETWORKING
PRESENTATION SKILLS
PROGRESS
QUALITY CONTROL
RESEARCH

اللغات

الانجليزية