I am Civil Engineer with MS Degree in Civil Engineering from KFUPM Dhahran KSA. I have more than 30 years experience in construction industry. My core experience is in infrastructural projects and management as well. Nowadays I have been giving my services to Ministry of Interior (MOI) KSA in the capacity of Project Manager. I have looking after two different projects such as Housing Projects and Security projects. Total cost of the projects is SAR 41 Billion.
My basic responsibility is:
. To support the project supervisor in managing the project.
. To report to the MOI-PS on the progress and status of the project.
. To provide the specialist/ Technical support and recommendations to the MOI-PS on project, construction and Technical management affairs.
. To review and escalation of risks and issues to the MOI-PS and HE Deputy Minister in collaboration with TST.
. To attend the executive weekly progress meeting, verifying and assisting with dealing captured items efficiently and effectively.
. To review and assurance of the status and progress reporting on behalf of the TST.
. To review the recommendations on change/variation orders approval.
. To prepare the monthly executive report for the HE Deputy Minister office.
Projects:
• Custodian of Two Holy Mosque King Abdullah Bin Abdul Aziz Projects Phase 2 (KAP 2)
• Cost: SAR. 23.5 Billion
The Project Consist of eight phases with different Contractors throughout the Kingdom of Saudi Arabia. Such as:
• KAP 2 A El Seif Contracting Co. (ESEC)
• KAP 2 B 1 El Seif Contracting Co.. (ESEC)
• KAP 2 B2 Al Arrab Contracting Co. (ACC)
• KAP 2 C1 Al Rashid Trading & Construction Co.(RTCC)
• KAP 2 C2 ABV Roack
• KAP 2 D2 Joannou & Paraskevaides (SA) Ltd Co. (J&P)
• KAP 2 E1 Joannou & Paraskevaides (SA) Ltd Co. (J&P)
• KAP 2 E2 Beijing Emirates Int. Construction (BEC)
There are Facilities like Institute of different authorities running under the Ministry of Interior, Training Camps, Special Force Camps, Hajj & Umrah Camps, Dorms for the Students, Housing for the Staff, Infrastructures etc.
• Southern Border Project (SBHP): There is housing Facilities are under construction for the security forces throughout the border area of the Kingdom. Such as:
- EASTERN REGION
- SOUTHERN REGION
There are 15 sites for housing project is under construction.
• Cost: SAR. 17.5 Billion

Manager Infrastructure à AL Fouzan Contracting and Trading Co.
  • Arabie Saoudite - Riyad
  • septembre 2015 à mai 2016

Project:
• Government Agencies Compound Project, Riyadh.
• 30 KM single and double roadways.
• Four interchanges.
• 65 KM transmission DCP with thermal storage.
• Domestic water supply system (L = 35 KM).
• Ground water reservoir of 2500M3.
• Waste water system network of 26 KM.
• 4 lift stations.
• Elevated water tank of 600 M3.
• 275 precast concrete sewage manholes.
• STP 7500 M3/Day
• Storm water system network of 35 KM
• RCC box channel 800 LM.
• 700 precast concrete manholes.
• 1350 precast concrete inlet gullies.
• Primary irrigation system.
• Ground reservoir of 1200M3.
• MV power network of 115 KM.
• 15 Package unit substations of 1000 KVA.
• Street light network.
• Telecom duct bank of 160 KM.
• 1300 precast concrete manholes/hand holes.
• Security and IT system.
• Ducting of 45 KM length.
• 350 manholes/hand holes.
• 350 Security cameras at intersections.

Duties:
• Responsible for all activities related to civil works.
• Monitor all programs related to infrastructural works including the quality assurance and control.
• Initiate the request for inspections with the collaboration of the construction management to check out the survey program for different running activities.
• Prepare and submit the shop drawings for roads plan and profile, storm, sewerage and water supply plan and profiles.
• Prepare the table for storm and sewerage drainage system network for precast concrete manholes and inlet gullies.
• Prepare the details of the isolation valve chambers, air valve chambers and washout chambers for water supply networks.
• Review the construction drawings for improvement.
• Documentary support to QS department.
• Technical coordination between inter discipline for running activities.
• Review and submit the manufacturers, suppliers and materials for approval.
• In-charge of the precast yard for storm, sewerage manholes, valve chambers, inlet gullies, pole foundations, barriers …etc.

Manager Infrastructure à Fouzan Trading and General Contracting
  • Arabie Saoudite - Riyad
  • janvier 1994 à janvier 1997

Department of Road and Storm Water Drainage System, Municipality of Riyadh

Technical Consultant
  • Émirats Arabes Unis
  • janvier 1994 à janvier 1997

Department of Road and Storm Water Drainage System, Municipality of Riyadh

Technical Consultant à AMNK Consulting Engineers
  • Arabie Saoudite
  • janvier 1988 à janvier 1994
Project Manager à AMNK Consulting Engineers
  • Arabie Saoudite
  • janvier 1988 à janvier 1994

Projects:
•A 100 million M3 capacity water reservoir in Mena in Makkah for Mena Development Authority. The project costs SAR 380 million.
•Construction of 7 tunnels of 3 km length.
•Survey and design of Khadeja Bint Khuwelad Road of 14 km Length.
•Design and supervision on Al Arouba Street of 3 km length. Improvement of Olaya Street of 8.5 km length.
•Concept plan for viaduct at Sharm Al Abhur.
•Construction of Al Nahdah Parkway of 3.3 km length.
•Traffic management study for Old Sanayiah, Riyadh.

Duties:
•Engaged in different design and supervision projects related to water reservoir, road networks, storm water drainage, beautification and improvement

Project Manager à KFUPM
  • Arabie Saoudite
  • janvier 1984 à janvier 1988
Research Assistant à KFUPM
  • Arabie Saoudite
  • janvier 1984 à janvier 1988

Research Programs:
•Improvement of signalized intersections.
•Road Taxation.
•Existing roads pavement.
•Evaluation of Dammam-Riyadh Highway (Abqaiq Area

Research Assistant à ATTOCK Cement (PAK) Limited
  • janvier 1982 à janvier 1984
Assistant Project Manager à ATTOCK Cement (PAK) Limited
  • janvier 1982 à janvier 1984

Projects:
•Cement factory of 2000 tons/day capacity.
•Quarry area.
•Raw mill conveyor.
•Raw mill crusher.
•Quality control building.
•Raw mill cement grinding.
•Raw mill silo of 50M height and 15M depth.
•Rotary clinker.
•Clinker silo of 20M height and 35M depth.
•Cement grinding mill.
•Cement silo of 50M height and 15M depth.
•Cement packing plant.
•Mechanical workshop.
•Factory link road of 7.5 KM length and 7M width.
•Factory internal road of 2.5 KM length and 10 M width.
•Staff housing road of 1.5 Km length and 6M width.
•Staff housing.
•Admin block.
•Dispensary.
•Water reservoir.
•STP.
Duties:
•To track and oversee the construction of Cement Factory.
•Report to General Manager for day to day progress.
•Responsible for Quality Control and Assurance, Verification of Payment Certificates etc.

Assistant Project Manager à Shaheen Builders
  • janvier 1981 à janvier 1982
Project Engineer à Shaheen Builders
  • janvier 1981 à janvier 1982

Project:
•Grain Storage Shell Project for Pakistan Army. The concrete structure used to rise up to 10 M high with 30 M dia. from the finished grade level by means of air blower.

Duties:
•Responsible for the construction of 44 shells.

Project Engineer à PEMCON Ltd
  • janvier 1979 à janvier 1981
Site Engineer à PEMCON Ltd
  • janvier 1979 à janvier 1981

Projects:
•500 KV transmission systems.
•Guddu-Ghazighat Project.
•Gravel shell project for hub dam.
•180000 gallon capacity water reservoir.
Duties:
•Responsible for the construction of deep foundation on river Indus for transmission lines, strengthening of hub dam and construction of 180000 gallon capacity water reservoir. The project costs PK RS. 250 million.

Projects Manager à Archen Engineering
  • Arabie Saoudite
  • à
Site Engineer
  • à
Consultant à KAP 2 A El Seif Contracting Co. (ESEC) •KAP 2 B 1 El Seif Contracting Co.. (ESEC) •KAP 2 B2 Al Arrab Contracting Co. (ACC) •KAP 2 C1 Al Rashid Trading & Construction Co.(RTCC) •KAP 2 C2 ABV Roack •KAP 2 D2 Joannou & Paraskevaides (SA) Ltd Co. (J&P) •KAP 2 E1 Joannou & Paraskevaides (SA) Ltd Co. (J&P) •KAP 2 E2 Beijing Emirates Int. Construction
  • à

BEC)
There are Facilities like Institute of different authorities running under the Ministry of Interior, Training Camps, Special Force Camps, Hajj & Umrah Camps, Dorms for the Students, Housing for the Staff, Infrastructures etc.
•Southern Border Project (SBHP): There is housing Facilities are under construction for the security forces throughout the border area of the Kingdom. Such as:
•EASTERN REGION
•SOUTHERN REGION
There are 15 sites for housing project is under construction.
•Cost: SAR. 17.5 Billion
Duties:
To assist the PM (MOI) by monitoring the Supervisory

Head à Fouzan Trading and General Contracting
  • Arabie Saoudite
  • à

Project:
•Government Agencies Compound Project, Riyadh.
•30 KM single and double roadways.
•Four interchanges.
•65 KM transmission DCP with thermal storage.
•Domestic water supply system (L = 35 KM).
•Ground water reservoir of 2500M3.
•Waste water system network of 26 KM.
•4 lift stations.
•Elevated water tank of 600 M3.
•275 precast concrete sewage manholes.
•STP 7500 M3/Day
•Storm water system network of 35 KM
•RCC box channel 800 LM.
•700 precast concrete manholes.
•1350 precast concrete inlet gullies.
•Primary irrigation system.
•Ground reservoir of 1200M3.
•MV power network of 115 KM.
•15 Package unit substations of 1000 KVA.
•Street light network.
•Telecom duct bank of 160 KM.
•1300 precast concrete manholes/hand holes.
•Security and IT system.
•Ducting of 45 KM length.
•350 manholes/hand holes.
•350 Security cameras at intersections.

Duties:
•Responsible for all activities related to civil works.
•Monitor all programs related to infrastructural works including the quality assurance and control.
•Initiate the request for inspections with the collaboration of the construction management to check out the survey program for different running activities.
•Prepare and submit the shop drawings for roads plan and profile, storm, sewerage and water supply plan and profiles.
•Prepare the table for storm and sewerage drainage system network for precast concrete manholes and inlet gullies.
•Prepare the details of the isolation valve chambers, air valve chambers and washout chambers for water supply networks.
•Review the construction drawings for improvement.
•Documentary support to QS department.
•Technical coordination between inter discipline for running activities.
•Review and submit the manufacturers, suppliers and materials for approval.
•In-charge of the precast yard for storm, sewerage manholes, valve chambers, inlet gullies, pole foundations, barriers …etc.

Éducation

Master, Civil Engineering
  • à King Fahd University of Petroleum and Minerals
  • janvier 1987
Baccalauréat, Civil Engineering
  • à NED University of Engineering and Technology

in

Specialties & Skills

Project Management
GENERAL MANAGEMENT
MECHANICAL
MICROSOFT WINDOWS 2000
NETWORKING
PRESENTATION SKILLS
PROGRESS
QUALITY CONTROL
RESEARCH

Langues

Anglais
Expert