256 MW 4 Photovoltaic Power Plants Benban Solar Park (1.8GW)
Responsibilities
Review all electrical drawings, BOQ.
Plan and prepare work and equipment usage schedules.
Train and inform workers about new work procedures.
Follow All Electrical Subcontractors Activities in Site:
Trenches Excavation, layers back filling.
Cable pulling, Cables termination.
String connections, piercing connectors.
Electrical Installation DC Switch boxes, MV Skids and
Cables testing (continuity, megger, OTDR and VLF test).
Equipment devices testing (inverters and MVSWGR).
CCTV system function test and configuration.
Firefighting mechanical and electrical “installation, testing and commissioning”
Control the Material Installed or Remain in site.
Follow daily and weekly progress sheet.
Follow commissioning team on cold and hot commissioning.
Participate with project manager in project closure activities.
ZOHR development field Project (Oil & Gas)
Substation 400 and its related area.33 KV, 6.6 KV Cables
Responsibilities:
Follow All Electrical Subcontractors Activities in Site:
Electrical, Lighting, Fire& Gas, instrumentation, Earthing
Preparing all MIR related to all systems
Cable tray, Design all (as built) raceway drawing
Cable pulling, termination
Follow Installed equipment’s (junction box, luminaires, instruments, fire & gas, panels….)
Follow all Vendor Skid drawing and martial package.
33KV, 6.6KV Medium voltage cables
Follow all activities (cable pulling, cable termination, splice joints, megger and HIPOT tests)
Follow all modification and doing as built for any additional activities.
Beni Suef combined cycle power plant 4800MW
Balance of plant scope, Gas station scope, Water treatment scope.
Module 10, two units gas turbine, two units HRSG, Unit steam turbine.
Responsibilities
A. Follow construction team Progress on site.
B. Solving all Electrical problems in all Systems.
C. Race way, Cables, Electrical Equipment, Field Instruments, Fire alarm, Invoices
Prepare Cable tray BOQ, controlled material, controlled progress in site, RFP, RFI in main and secondary raceway.
Follow technician Cable pulling, Caples termination.
Prepare drum schedule, follow Drums status, wiring diagram,
Prepare (Transformers, generators.) Fixation and earthing.
Study P&ID and hook up, piping isometric for all instruments.
Prepare invoices for each scope, Follow invoices until approval.
D. General responsibilities
Perform Earthing system for all mentioned above works.
Prepare Material Submittals Offer.
Send daily, weekly progress sheet.
Prepare As built and red line drawings
Bachelor of Electrical Engineering from Electrical Power and Machines Department Faculty of engineering Helwan university.
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.