MEP Engineer
Golden Taibah Contracting
مجموع سنوات الخبرة :12 years, 4 أشهر
• Analyzed and evaluated the complete plans and specifications based on the desired plan.
• Contributed to successful project completion by providing technical services in accordance with project time and quality.
• Examined all project designs and drawings, identified where information is miss ing, and also reviewed where there are conflicts.
• Prepared tender and construction drawings along with engineering Design Plans.
• Prepared engineering designs and calculations for Drainage, Water, distribu tion systems, wastewater collection and treatment systems, electrical systems, pumping systems, HVAC systems, and fire detection Systems in compliance to all local and international codes and guidelines.
• Provided oversight for the installation and commissioning of MEP works.
• Prepared a submit reports, memoranda, committee notes, tender evaluation reports, monthly reports and all other required correspondence.
• Executed tender evaluations and prepared tender evaluation Reports.
• Kept maintenance logs and report on daily activities.
- Coordinated and controlled all production processes, ensured products were delivered on time and within budget.
- Optimized production line, resulting in high throughput increase and standardized processes in bulk production.
- Maintained, enhanced and applied both design and technical knowledge to ensure production of high quality product.
- Implemented changes in working conditions, equipment and tools to improve workflow, efficiency and team member safety.
- Overseen continuous improvement initiatives to drive gains in quality, flow and output.
- Ensured all maintenance activities and procedures adhere to applicable health and safety legislation, policies, and best practice guidelines.
- Maintained thorough material inventories to consistently meet production schedules.
- Managed materials to keep up with production goals and meet customer demands.
- Implemented changes in working conditions, equipment and tools to improve workflow, efficiency and team member safety.
- Developed maintenance procedures and ensured implementation. - Planned and overseen all repair and installation activities.
- Kept maintenance logs and report on daily activities.
- Performed scheduled maintenance and preventative repairs on all electrical systems, equipment, and machinery.
- Maximized ROI by maintaining and repairing production line machines, replac- ing defective components as necessary.
- Visually inspected equipment to identify and diagnose malfunctions with high accuracy.
- Maintained safety and efficiency of Production line and RO equipment by conducting daily inspections.
- Ensured that the sites’ electrical and mechanical equipment are installed and correctly operating within manufacturer specifications and legal compliance.
- Settled approved levels of conduct for work methodology within the team.
- Carried out installation works and modifications to existing systems, including new wiring and replacement of DB’s and wiring.
- Ensured all maintenance activities and procedures adhere to applicable health and safety legislation, policies, and best practice guidelines.
• Designed electrical building services systems including (LV) distribution, power and lighting, emergency lighting.
• Contributed to successful project completion by providing technical services in accordance with project time and quality.
• Conducted site inspections.
• Provided technical support to site supervision teams and resolved design related issues on site.
• Presented work to colleagues, clients and stakeholders.
• Attended client meetings.
* Teach students how to conduct experiments in laboratories.
* Make sure that students learn appropriate scientific methods and how to follow lab safety protocol by designing experiments, modeling how to use laboratory equipment, and supervising students as they work
- Managed maintenance projects.
- Reviewed vendors’ manufacturing data for distribution boards.
- Performed load calculation for sizing wire and circuit protection. Continually improve methods and procedures for processes, measurement, documenting and work flow techniques.
- Stetted out sites and organized facilities.
- Prepared site reports and filling in other paperwork.
- Ensured that health and safety and sustainability policies and legislation are adhered to.
• Managed maintenance projects.
• Reviewed vendors manufacturing data for distribution boards.
• Performed load calculation for sizing wire and circuit protection. Continually improve methods and procedures for processes, measurement, documenting and work flow techniques.
• Stetted out sites and organized facilities.
• Prepared site reports and filling in other paperwork.
II-upper
MBA