مهدي حراز, Maintenance Department Manager

مهدي حراز

Maintenance Department Manager

Cloverbrook Textiles Egypt

البلد
مصر - القاهرة
التعليم
بكالوريوس, B.Sc. in Electrical Power Engineering
الخبرات
26 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :26 years, 9 أشهر

Maintenance Department Manager في Cloverbrook Textiles Egypt
  • مصر - القاهرة
  • يناير 2007 إلى أبريل 2017

Achievements :
Modified and Renew the main Electric panel & main Electric distribution Boards.
Modified the main water system & water storage tank to keep the water all the time.
Enhanced and Redistribution all the electric cables for all production machines.
Upgrade the production machines with new controller system ( PLC ).
Installed new production machines and new equipment.
provided the maintenance team with preventive & predictive systems
Duties & Responsibility :
• Preparation of preventive maintenance plan & schedule check lists for all Equipment in the all factories (Knitting-Garment-dyeing-printing-finishing-Inspection) and it is auxiliaries such as: Electric power station, water treatment station, compressed air station, steam boilers, Gas station.
• Supervising and coaching a team of maintenance and ensure a safe and effective work done during execution of maintenance programs.
• Follow up the troubleshoot problems repair works and analyze the reasons of breakdown and improve the preventive maintenance plan if necessary to avoid the same failure in the future.
• Manage the preventive maintenance plans, and operating maintenance procedures for improving the production facilities & reliability of planning department.
• Recoding the production machines breakdown to get the performance of the all production machines and maintenance team every month (KPI).
• Follow up the maintenance repair works and improve the maintenance procedure to save the time & the effort and the cost.
• Control and update all engineering and technical documents &drawing.
• Ability to build up the spare parts strategies for all equipment and also estimate the total cost of replacement of all spare parts required for the plant per year.
• Responsible for any modification or any new installation in the all factories.
• Responsible for providing leadership and direction for the maintenance team and also responsible for maintenance team training, rotations, vacations and overtime.
• Experienced in working with British standard & TS16949 Standard and ISO18001, ISO9001.

Electrical Project Manager في Ram system
  • مصر - القاهرة
  • مايو 1999 إلى يناير 2000

Execution of all Electrical works of the Project BK-1 including the Outdoor lighting, also Installation of two Generation station (one mega volt /each), Main Distribution Boards, Pillars, Irrigation Pumps, and Electrical Cables Laying in Trench, termination, joining and testing.

Sr. Electrical Project Engineer في procter & gamble egypt "p&g"
  • مصر - القاهرة
  • أبريل 1998 إلى مايو 1999

Supervision of Electrical construction activities of contractors During Installation of various projects, such as (Blue speckles, Green speckles, Lab. upgrade, Debanol, GD2 Base) and also sharing the pre-commissioning & commissioning of all these projects, the responsibility of review the drawing, specs, and follow the project time schedule, prepare all document control procedures & system documentation for all the projects and providing technical support for electrical maintenance department

Sr. Electrical Project Engineer في Grossen Bacher
  • مصر - شرم الشيخ
  • أبريل 1997 إلى أبريل 1998

Execution of all Electrical installation in various high quality building ( Movepick Golf Hotel, International Conference Room and 22 Villas) including Substation, power and lighting system, low current system, BMS. (First project)
: Supervision of Electrical Installation work of painting shop, assembling shop, testing shop, spare parts warehouse, and administration building in Mercedes Benz Factory Located in 6 th of Oct. City .(second project)

Sr. Electrical Project Engineer في Nour Midas Textiles Co
  • مصر
  • يناير 1996 إلى يناير 1997

: Execution of all Electrical Installation work in Dying, Printing, Weaving and twisting Factories under supervision of Korean expert also sharing design and review drawing & specs. With the consultant office.

Sr. Electrical Project Engineer في consolidated contractor international company (ccic)
  • الإمارات العربية المتحدة
  • يونيو 1994 إلى نوفمبر 1995

Installation supervision of Electrical & Instrument Equipments in unit 13/32/42 of O.G.D project No. 545 ADNOC Habshan Abu Dhabi, U.A.E - such as:
11KV Switchgear ( Whipp & Bourne ) 415 V motor control Center (Siemens) 240 V AC uninterruptible power supply ( Gutor) power Transformer ( France-Transfo)Bus ducts (Betobar-r) Batteries(Absolyte) Junction Boxes( ABB, Legrand )LV/HV Cables ( BICC, Alcatel, Grose ) 11KV Refrigeration Compressors (York) HP&MP Gas Turbine Compressors ( Dresser Rand ) Electrical Heaters ( Eltorn, Chromalox, Wellman ) Overhead Crane ( J- Barnsley ) LV Cables Glanding (Raychem - BICC - Bimold ) Lighting and small power ( ABB/CEAG) Fire & Gas Detection System ( DAC) Field Mounted Instrument( Masoneilan, Rosemount, Maxseal, Delta Rotork, Orbit, Fisher ) .
Vendor Packages : Regeneration Gas Heater (Selas Kirchner), Expander Recompressor( Rotoflow ) Lean Solvent Circulating pump ( Nuovo pignone ), Recycle Gas Compressor(Mennesmann - Demag) & Lean Amine Filtration package ( Eurofiltec ) .
• Preparation of work permit needed for each activity in different area and follow the safety procedures.
• Preparation of all material required for installation of (Cable racks, Trays, Conduit system, Lighting fixtures, junction Boxes, Distribution Boards, Earthing system, LV/HV Cables Termination ).
• V. Good understanding with design and engineering principles of electrical installation in petrochemical industries.
• V. Good understanding with standards, codes and regulations of petrochemical industries.
• V. Good understanding of area classification, temperature classification, Equipment certification and type of protection in petrochemical industries.
• V. Good understanding about safety and health environment (S.H.E)




Project Engineering :* Bechtel / Technip - Joint Venture

Electrical Maintenance Engineer في Medical uion pharmacetical( MUP
  • مصر - الإسماعيلية‎
  • مايو 1989 إلى يونيو 1994

Repair and Maintenance supervision of all Electrical Equipment in the Company such as:
Power Transformers 11000/400 volt ( Geafol), H.V. Switchboard (Siemens - 3AF), L.V. Switch board ( Siemens - 8pU) with circuit breakers ( Siemens - 3 WE ) All type of motors ( Siemens, AEG, Westinghouse) with it is starter circuit control, Generators (CATERPILLER -MODEL ST-4)-1000k.v.aCentrifugal Liquid Chillers (Carrier model 19DKCR) with it is Controller starter ( Westinghouse 17 - 800 ) Boilers (York shipply model 576 ) Compressors( Ingersoll Rand - RDL ) Electric pumps ( Grundfos, SEPP, Bell & Jose ) water treatment Station ( Stillmas ) D.C Forklifts ( ATLET CLECO ) Batteries & Batteries charger ( Chloride spagel ) all type of indoor and outdoor light such as in Laboratories, work shop, stores offices, production Area, Corridors, Restaurant, Reception, Streets, Gardens and Light in Explosion Area .
Light Current Systems ( Siemens ) such as :
1- Telephone Systems EMS - 601
2- Fire Alarm systems BMS - 80
3- Sound systems Variodyn - 2000
4- Time keeping systems HU-104
• Supervision of Motors Rewinding work shop procedures.
• Preparation of spare parts Lists of all Electrical Equipment .
• V. Good understanding of emergency supplies of important load.
• V. Good understanding of electric design for explosion proof area.
• V. Good knowledge about Air Quality and Good Manufacture Practice.

Electrical Maintenance Engineer في National Mohandes for Macaroni & Pastes Co
  • مصر - الإسماعيلية‎
  • أبريل 1986 إلى يناير 1989

Repair and Maintenance supervision of all Electrical Equipment in the company such as :
L.V switchgear & circuit Breakers ( SACE - Novomax G2 ) Emergency power supply system ( B.B.C - Tanomat ) Generator ( G.M / Detroit ) Compressors ( Balma, Mahle, Worthington ) chiller ( KAPAC ) Boilers ( Ygnis ) Heating & Ventilation system ( Honeywell ) water treatment system ( Aqua - Pure ) control system of production lines machines ( BUHLER - MIAG ) packaging machines ( Caribaldo - Ricciarelli ) feeding & storage control system ( Novocompact ) .
• Supervising and coaching a team of maintenance and leading a multi-craft maintenance team to effectively repair of the whole plant .
• Preparation of all type of spare parts lists and protective maintenance schedule for all Electrical equipment in the company .
• Supervision of Motor Rewinding procedures In Electrical work shop .
• Responsibility of any Modification in Elec. control circuit of production lines machines .
• V. Good understanding about Good Manufacture Practice ( G.M.P )

Electrical Supervisor في control & application emirates
  • الإمارات العربية المتحدة
  • أكتوبر 1984 إلى مارس 1986

Installation supervision of all Electrical & Instrument Equipments in LNG/LPG Storage system project No : 550 ADGAS Das Island - Abu Dhabi- U.A.E .
1 Installation of Cable Rack & Cable Tray, Lighting Fixtures, Junction Boxes Distribution Boards, conduit system, Earthing System .
2 Installation of LV/HV Cables (Pulling - Dressing - Glanding - Termination - Joining - Testing)
3 Preparation of work permit according to working activity ( Hot / Cold )
4 Preparation of Material Take-off from storage Area.
5 Preparation of inspection Form after complete installation of each part .
6 V. Good understanding of electric design according to IEC code .
7 V. Good understanding of the specification and standards of electrical installation in petrochemical industries .
8 HI-POT Test of HV-Cables, also sharing pre-Commissioning, Commissioning and Start up the project .


Project Engineering : * Pullman Kellogg Limited

Electrical Engineer في National Mohandes for Macaroni & Pastes co
  • مصر - الإسماعيلية‎
  • مارس 1983 إلى أكتوبر 1984

Installation supervision of all Company Equipments during the Swiss contractor Company called ( BUHLER ) carrying out the project .
Inspection and test plans of all Electrical & Instrument Equipment, pre-commissioning & commissioning of the production lines Equipment and it is Auxiliaries such as Generators, Compressors, Boilers, Chillier, Heating and ventilation system, Water pump station, packaging Machines and Storage & feeding system then startup the production of the company.
Aware with the specification, regulations and standards for low-voltage switchgear and factory assembled switchgear combinations applicable in federal republic of Germany are issued by (DIN & VDE)

الخلفية التعليمية

بكالوريوس, B.Sc. in Electrical Power Engineering
  • في Suez Canal University
  • مايو 1981

B.Sc.Degree in Electrical Power Engineerng with general appreciation Good and the Project Very Good

Specialties & Skills

Project Engineering
Preventive Maintenance Planning
Control System Design
LV/HV Cables Intallation Technique
AC &DC Motor repair
finding of underground faulty cables
packing machines adjusting
projrct managment

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الاسبانية
متوسط

التدريب و الشهادات

PROJECT MANAGEMENT PROFESSIONAL PMP (الشهادة)
تاريخ الدورة:
June 2015
Operation and Trouble Shooting of Siemens Equipments (الشهادة)
تاريخ الدورة:
May 1991
صالحة لغاية:
July 1991