Managing Director
M.D
Total years of experience :33 years, 2 Months
Sudanese Power Utility)
* Managing Upper Attabara Project( Civil Work, Hydromechnical
works and Electromechanical works) within Merowe Dam
Electricity Company Responsibility.
* Leading (647) Technical Employees with different skills.
* Hydro Power Plant operations & maintenance.
* Dam and Reservoir Operations, monitoring & maintenance.
* Human Resource, administration & finance .
* The company adopting total quality management (TQM), on
the way to recive ISO Certificate.
* Applying ERP to control the Company activies, most & ALSPA
320 to mange power plant equipments and to facilitate
maintenance .
* Attended a number of design meetings & shop tests
DAM IMPELEMTATION UNIT ( D.I.U.)
Merowe Dam Project - Hydro Power Generation Project - Resident
Engineer :
* responsible for civil and Electromechanical activities in Merowe
Dam Implantation Unit.
* Attended a number of design meetings & shop tests.
* Attended Tender opening, tender evaluation up to awarding
of Contract.
* Attended many kick of meetings.
* Participating in preparing documents for hydro dams (SHIERK,
KAJABAR, DAGASH, MOGRAT, SABALOGA, UPER ATABRA and
BEDEN, etc. )
* Under the responsibilities civil works & hydrology & hydro
mechanical.
Hydropower plant - Dam Implementation Unit
Merowe Dam Project - Merowe:
* Supervising and following with
Power Utility
Electrical Distribution Division- Khartoum
* Under my responsibility the distribution of power for the whole
country (Sudan)
* Medium voltage 11kv and 33kv with substation
* Low voltage of 0.4kv as consumer level of volt, through
package substation
* Processing and reducing load losses.
* Introducing prepared meters
* The project for mini hydro named as matrix
* Number of matrix 40 (each lot with 2 turbines)
* Propeller turbines - both turbine and generator are submersed
in water
* The power Station output 30Mw.
* Induction generators with low power factor, to in prove power
factor condensers are automatically switched on.
* The matrix can be easily lowered down in the water and raised
up for more water discharge.
Power Utility -
Roseires Hydropower Plant
* Roseires Power Station rehabilitation, Instrumentation and
Control
* Assessment of power station electrical equipment’s.
* Changing MCC( motor control centers).
* Erection of unit circuit breakers equipped with electrical breaks
* Using computerized control system (CCS) PROCONTROL ABB
Germany
* HVAC system
* UPS +DC systems
* Protection system
Roseires :
* Trouble shooting & routine maintenance for generators,
transformers, auxiliaries, governor systems & excitation systems.
* Conventional control system.
* DC system.
* Protection system.
electrification project,
* Assisting the consultant Decon of Germany,
* Supervising & checking the works of the contractor Kabelmetal
of Germany.
* Erecting medium & low voltage networks starting with the
design.
* Erecting diesel units system to feed Karima and Merowe
, control its operating budget, plan and schedule
its activities, establish and maintain its business processes
and procedures.
As a project manager, I was responsible for managing
projects from pre-initiation to completion, gathering
requirements and understanding the clients’ overall goals
of each project, producing proposals and financials
including company cost, profit and final proposal offer,
time scheduling of tasks, and keeping the projects on
schedule and negotiations for materials and equipment
required per, procurement .
Design of electrical systems for grass-root facilities and
revamp and upgrade of existing ones.
station
in
in