Factory Manager
Power Busbar for Electrical Industries
Total years of experience :11 years, 9 Months
Responsibilities:
• Develop and implement strategies to control productivity and future planning to maximize productivity according to work flow planned.
• Study factory operations to develop operation strategies and/or machinery development “upgrades - calibrations” to minimize time and increase efficiency.
• Started, created and leading a product development strategy to ensure the product meets the standards, and created a development plan for future for the full products portfolio.
• Testing Product Design and development using software, create models and test assembly and efficiency of the model. Contact suppliers to create required samples.
• Build Relationship with suppliers, distributers and sign agreements and contracts.
• Study cost of production (operation cost +raw material +waste) and plan future pricing strategy.
• Create the strategy to optimize spending according to budget and discuss payment terms with suppliers.
• Support Technical team for technical decisions and handle installations of projects.
Accomplishments:
• Earlier in 2015, 2016 Created the product series from design preview to manufacture drawings.
• In June 2019 launched a new factory in Sadat City. (Managing construction of the factory - installing the machinery - designing required dies - dealing with subcontractors - hiring staff - create contracts with suppliers) in two months we were ready for production.
• In July 2019 Created a long term contracts with subcontractors for raw materials.
• In October 2019 Planned and executed to increase the production rate from 500 to 1500 Point.
• In September 2020 got ISO 9001 certificate for our factory.
• In October 2020 Planned to Relocate our factory to a bigger one also in Sadat. I have managed to Relocate all machinery in 5 working days.
• In April 2020 Reached 3000 Manufacture Point.
• 2019 to 2021 executed more than 50 projects in Egypt and abroad with QBAR brand, and more than 50 projects in Egypt with DKC as a sister company.
Responsibilities:
• Managed implementation of new technological improvements resulting in increased efficiency and productivity.
• Develop suggestions for technical Product improvements to optimize manufacturing and features.
• Study Factory Work considering the limitation of Cost - Quality - Time - Scope. Factory work include labour assignment - labour hour calculation - accelerating production process with the best quality.
• Develop work-flow charts and diagrams to ensure production team compliance with client deadlines. Along with designing a Microsoft Project Templates for the Factory to calculate production Rates and Delivery schedules.
• Provide the laborers with the required training on manufacturing of new products and Monitor the manufacture of electrical busways to ensure compliance with safety protocols.
• Applied principles of electrical theory to advance and improve product development and efficiency.
• Set project timelines and keep teams on task to complete milestones according to schedule regarding technical office team, installation team and production team.
• Independently designed and executed Installation and products catalogues and Preparing seminars and presentation for old and new products.
• Technical Support of sales department (Studying new project provide technical help).
• Continually improved methods and procedures for processes, measurement, documenting and work flow techniques.
• Mentor junior engineers and new hires to better improve the competency and efficiency of all staff.
• Monitor installation and operations to consistently meet rigorous customer requirements.
• Initiated a project management knowledge study and subsequently standardized project management practices.
Responsibilities:
• Managed implementation of new technological improvements resulting in increased efficiency and productivity.
• Responsible for site visit, surveys and measuring the required dimensions and difficulties to design busway routing.
• Rendered technical drawings and electrical systems specifications that exceeded company standards.
• Successfully changed the blocks and design of busway drawings to 3D.
• Managing installation of busway systems on site and testing and ensuring safety of installation.
• Collaborated successfully with cross-functional development teams to design and manufacture new products.
• Continually improved methods and procedures for processes, measurement, documenting and work flow techniques.
• Monitor the manufacture of busway and operations to ensure compliance with the manufacture request and safety protocols.
• Validated schematic designs working alongside client engineers.
• Produced ad hoc reports and documents for technical manager.
It consists of 60 Dependent course I successfully studied and graduated from: • Management skills Introduction • Fundamentals of Business Management. • Building Relationships. • Career Development. • Coaching. • Coaching for Performance. • Time Management for MAXIMUM productivity. • Business Ethics. • Stress Management. • Six Sigma Introduction. • Managing change in workplace. • Project Management from people prospective. • Problem solving through Productive Thinking. • Customer Service for Managers
GRADUATION PROJECT: • Graduation project: Electrical distribution for a hotel • Scope of project: Lighting distribution for the whole hotel with addressable fire alarm system and CCTV system. • Project Grade: Excellent • Project Supervisor: Prof.Dr.Saed Wahsh