Senior Electrical Instructor
CENTEXS (center of technology excellence Sarawak)
Total years of experience :19 years, 2 Months
Training as Senior Instructor for technical up-skilling which are national industrial linked authorized by EIU of Malaysia Sarawak Sates for the qualifications of Wireman & Chargeman and international recognized qualification of Skills Proficiency Certificate (Basic Electrical Engineering & Plant Maintenance 3529) authorized by UK City & Guilds. In addition mechatronics training of Port Equipment Operation and Rotating Equipment of Gas& Steam Turbines for power plant generation utility and oil & gas industry.
Liaison with all Strategic Partners PLP, SEB, TM, Sacofa, Petronas, NIOSH... etc.
Leading the Research and Development of Renewable and Sustainable Energy Division
Weekly Briefing the Safety Toolbox of Occupational Health and Safety Management System ‘OHSMS’
Implementation of telecommunication networks in
Sarawak State with Fiber To The Home “FTTH” or copper
cabling installation until the termination point
inside / outside the buildings, cable
tray/racking/ladder of the fiber terminal box.
* To install ac/dc power supply, low voltage
provisioning including lightning protection scheme to
the customer /operator premise.
❹Position: MANAGER Gas Turbines Generation Development
Upgrading copper wirings communication networks
of Sarawak state with fiber optic to be ready for
infrastructure Fiber To The Home ‘FTTH’.
R&D engineering study for power budget and tuning
signals from undesired distortion signals cross phase
Installation computer networks and Oracle Hardware
and Software, Development telecom networks,
installing fiber optical networks WDM, splitter,
operation and maintenance. Upgrading copper wirings
telecom networks of western region of Saudi Arabia
to fiber optic for FTTH, engineering study for power
budget, tuning signals from XPM and FWM.
* Evaluate construction methods and determine cost-
effectiveness of plans
* Prepare and negotiate all contracts and amendments
with external parties & stakeholders (e.g.
architects, consultants, suppliers, contractors...)
* Schedule project, ensure smooth logical progression
while managing safely, quality, time, and cost
limitations
* Manage external consultants with team (e.g.
architect, civil, structural, M&E, QS, contractors..
Filename: CV Electrical Engr Mahmoud 2018 Sep Page 4 of 5
* Plan, organize, and direct activities concerned with
the construction and maintenance of structures,
facilities, and systems
* Investigate and resolve complaints, damage,
accidents and emergency, or DELAYS, Ensure proper
contingency procedures are carried out where
required
* Prepare and submit progress reports, budget
estimates, and cost tracking reports
* Inspect and review projects to monitor compliance
with building and safety codes, and other applicable
regulations
* Interpret and explain plans and contract terms to
administrative staff and management as required
* Develop and implement quality control programmes.
Design, construction, testing, QAQC, leading of
electrical and commission reliability run for Opened-
and Combined-Cycle Gas Turbines CCGT-PP projects
management schedule and costing, Chargeman & Switching
HV & EHV. SEB/SESCO 2014-2016.
instruments, MCC, control
systems Speedtronic mark IV & V of GE made 11x33MW.
Performing electrical design and hands-on support for
process equipment (e.g., drives, PLS, HMI, wiring
schematics, instrumentation, and motor control
systems), troubleshooting and general maintenance
work. Programming for automation and control system
involving PLS/Touch Screen/SCADA
Hands-on Experience Competencies
* Consulting, verify & technical report writing of
FAT (Fat Acceptance Test) for electrical equipment &
Project: Pan Borneo Highway, WPC06 (65KM), Sarawak
holding Malaysian
Street
of Electrical and commissioning of
Relocation works Project of 1 gas turbine GE 6B 33MW
from Bintulu to Miri power station.
* Development of gas power generation for Combined-
cycle Gas Turbine ‘CCGT’ power plant projects to
ensure projects are completed on time and within
budget.
* Supervise and verify the standard quality assurance
QA, and in compliance to HSE, statutory requirement
and engineering practices within the contract
specification requirement.
* Develop the technical specifications and optimize
the excellence operation philosophy of the protection,
control & instrumentation systems.
* Strategize equipment requirement procurement and
tender document for tendering purposes, evaluating the
tender and presentation for board papers for tender
award for gas power plant projects.
* Accountable for the business plan modeling of
various projects Decision Gates ‘DGs’ and budgeting
process, aligning the global and local demands vs the
affordability to manage the company’s bottom-line.
Drives cost improvement initiatives of Levelized Cost
, with a focus on delivering
in
in