electro mechanical manager
alkhorayef water and power technilogies
Total years of experience :15 years, 9 Months
electro mechanical manager for water and waste water plants in eastern region
Responsible for managing heavy equipment workshops in all company branches, manage all maintenance staff directly, control equipment movements between sites and branches, design maintenance strategies and templates, diagnose breakdown problems, make sure that all equipment running smoothly and safety, assigning a well-qualified staff, dealing with all equipment suppliers
Responsible for communication and coordination with client, suppliers and other projects stakeholders, Verification of vendor compliance with client requirements and specifications
Manage materials and supply orders to ensure that all supplies fit the parameters of a project. Determines project responsibilities by identifying project phases and elements; assigning personnel to phases and elements; reviewing bids from contractors Determines project schedule by studying project plan and specifications; calculating time requirements sequencing project elements. Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions Interacting daily with the clients to interpret their needs and requirements and representing them in the field
•Manage all maintenance staff directly
•Control equipment movements between sites and branches
•Design maintenance strategies, procedures and methods
•Planning a preventive and corrective maintenance schedule
•Deal with emergency and unplanned problems and repairs
•Diagnose breakdown problems
•Carry out quality inspections on jobs
•Monitor and control maintenance costs
•Control time management
•Optimize maintenance resources (Labor, Materials)
•Make sure that all equipment is running smoothly safely
•Make decisions based on the committee observation report to solve problems
•Deal with a diverse equipment
•Deal with all related equipment agencies
•Assigning a well-qualified staff
•Ability to develop staff
•Coordinating internal resources and vendors for the flawless execution of projects
•Ensuring that all projects are delivered on-time within scope andbudget
•Ensure resource availability and allocation
•Use appropriate verification techniques to manage changes in project scope, schedule and costs
•Measure project performance using appropriate systems, tools and techniques report and escalate to management as needed
•Plans, schedules, and reviews workload and manpower to make sure targets are being met on a cost-effective basis
•Ensures the production team has enough time to manufacture and deliver products based on the client's request
•Communicates any changes in the order or delivery date to relevant stakeholders
•Makes sure the working environment maintains access to quality equipment
•Confirms that health and safety regulations are followed
.Ensuring that communication between departments is ongoing and utilized to maintain an environment of continuous improvement
•Providing a leadership support function to teams and motivating staff to achieve production goals
•Perform risk identification, qualitative and quantitative risk analysis, calculating risk impact propose risk response and monitor the implemented risk response to minimize project risks
•Making sure the quality standards are met
•Monitoring Suppliers operations involved in producing the materials/equipment specified in the purchase order, including planning, engineering, manufacture, testing and shipment
•Evaluate manufacturing progress & analyze supplier schedule and progress reports to determine timely project required delivery dates
•Cooperate and coordinate with project logistics department to get shipping information and to ensure that the shipping plan is implemented
•Manage the orders of material and equipment to meet project requirements
•Resolve problems and remove road blocks to speed up production/delivery of orders
•Arrange the movement of material between locations
•Keeping accurate records
•Manpower estimation
•Time and cost estimation by using a proper estimation technique
• Coordinating internal resources and vendors for the flawless execution of projects.
• Ensuring that all projects are delivered on-time, within scope and within budget.
• Ensure resource availability and allocation.
• Use appropriate verification techniques to manage changes in project scope, schedule and costs
• Measure project performance using appropriate systems, tools and techniques report and escalate to management as needed.
• Plans, schedules, and reviews workload and manpower to make sure targets are being met on a cost-effective basis.
• Ensures the production team has enough time to manufacture and deliver products based on the client's request.
• Communicates any changes in the order or delivery date to relevant stakeholders.
• Makes sure the working environment maintains access to quality equipment.
• Confirms that health and safety regulations are followed.
• Ensuring that communication between departments is ongoing and utilized to maintain an environment of continuous improvement.
• Providing a leadership support function to teams and motivating staff to achieve production goals.
• Perform risk identification, qualitative and quantitative risk analysis, calculating risk impact, propose risk response and monitor the implemented risk response to minimize project risks.
• Making sure the quality standards are met
• Monitoring Suppliers operations involved in producing the materials/equipment specified in the purchase order, including planning, engineering, manufacture, testing and shipment.
• Evaluate manufacturing progress & analyze supplier schedule and progress reports to determine timely project required delivery dates.
• Cooperate and coordinate with project logistics department to get shipping information and to ensure that the shipping plan is implemented.
• Manage the orders of material and equipment to meet project requirements
• Resolve problems and remove road blocks to speed up production/delivery of orders
• Arrange the movement of material between locations.
• Keeping accurate records.
• Manpower estimation.
• Time and cost estimation by using a proper estimation technique.
Projects Damanhur Waste Water Treatment Plant.
Assuit waste water treatment plant.
Quesna waste water and waste industrial plant.
Graduation Project: Design of Natural Gas Compression Station. Graduation Project Degree: Excellent (95%)