Mahmoud AlKhatib, Assets Commissioning and control Department Manager

Mahmoud AlKhatib

Assets Commissioning and control Department Manager

Abu Dhabi Distribution Company

Location
United Arab Emirates - Abu Dhabi
Education
Bachelor's degree, Mechanical Engineering
Experience
31 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :31 years, 3 Months

Assets Commissioning and control Department Manager at Abu Dhabi Distribution Company
  • United Arab Emirates - Abu Dhabi
  • My current job since February 2019

I am working in Capital Projects Directorate as assets Commissioning and Control Department Manager for projects with the following responsibilities:

1. Ensure Alignment of strategic objectives and goals of Projects and Connections Directorate with ADDC strategic plan and Abu Dhabi plan.
2. Set KPI targets for the next 4 years to achieve ADDC strategic objectives.
3. Prepare and ensure implementation of initiative management plan to achieve KPIs’ targets.
4. Cascading KPIs to employee’s level.
5. Progress Monitoring and Control of Projects.
6. Monitor and report the performance of Capital Projects Directorate and its Departments, monthly & quarterly by updating actual KPI target results and ensure the achievement of KPI targets within the Directorate Scorecard.
7. Risk Management compilation from WPD, EPD, CPS including monitoring, and action plan follow up.
8. Assists in Budget preparation (CAPEX & OPEX - RESOURCE PLANNING).
9. Review and Analysis of Budget Enhancement &Variation Orders.
10. Manage Change Control Committee Preparation and submittal of Variation Orders.
11. Ensure the Implementation of Projects & Connections Procedures - Initiatives follow up monitoring & development.
12. Ensure that Contractors & Consultants are following Abu Dhabi HSMS and ADDC HSEQ System Safety Rules, procedures and guidelines by conducting planned and surprise Audits by HSEQ Engineer.
13. Ensure that Fixed Asset Register BOQ, Performance Evaluations, and lessons learned are done prior to issuance of Provisional Acceptance Certificate (PAC) and Final Acceptance Certificate (FAC).
14. Manage Free Issue Material Management Plan generation on quarterly basis.
15. Submit to HSEQ Department Environment, Health and safety performance summary Report on monthly basis, follow up accidents & disciplinary action including CPAR of previous internal and external audits.
16. Prepare documentation for Capital efficiency of ADDC’s water and electricity capital expenditures over the price control against Bureau’s efficiency.
17. Ensure compliance with ISO55000 and support ADDC the successful certification of Pas55.
18. Representing projects in all internal and external audits.
19. ADDC claims' team leader negotiator.

Achievements:

•I have won best innovative employee medal in ADDC for year 2019.
• Strategy transformation champion. I have saved more than 400million AED in capex optimization.
• Achieving leadership in implementation of the first pumping station working at optimized pressure based on real-time change in demand depending on pump station flow meter only with no flow or pressure set point. I have demonstrated this achievement live in International Water Summit Abu Dhabi 2018.
• I have managed the first ADDC Innovation Lab. for optimization Capital Projects processes and review boundary processes across directorates.
• Introducing smart vat calculator that automatically calculates the vat for construction and consultancy contracts as per FTA regulations and unify invoices and payment certificates templates which reduces the time and effort for submitting and reviewing payments by 90%.
• BCM Submission for ADDC, which has won ADWEA Excellence Award 2017 for best company applying BCM.
• Creation of ADDC projects Procedure Manual.
• Support ADDC for PAS55 & ISO55000 certification.
• Ensures that the company complies with NCEMA 7000:2015 as business continuity coordinator in the task force team for Business Continuity Management program.
•Update ADWEA Water Standard Specification.
• Gave more than 10 in-house coaching sessions within the last 2 years.
•I was selected as model role employee in the Projects and Connections Directorate.
• I become EFQM Assessor in 2015.
• Obtained the International Computer Driving License in 2004.
• Outstanding Performance during the last 5 years.

Acting Head of planning & Control Unit at Abu Dhabi Distribution Company
  • United Arab Emirates - Abu Dhabi
  • April 2017 to February 2019

1. Ensure Alignment of strategic objectives and goals of Projects and Connections Directorate with ADDC strategic plan and Abu Dhabi plan.
2. Set KPI targets for the next 4 years to achieve ADDC strategic objectives.
3. Prepare and ensure implementation of initiative management plan to achieve KPIs’ targets.
4. Cascading KPIs to employee’s level.
5. Progress Monitoring and Control of Projects.
6. Monitor and report the performance of P&C Directorate and its Departments, monthly & quarterly by updating actual KPI target results and ensure the achievement of KPI targets within the Directorate Scorecard.
7. Risk Management compilation from WPD, EPD, CPS including monitoring, and action plan follow up.
8. Assists in Budget preparation (CAPEX & OPEX - RESOURCE PLANNING).
9. Review and Analysis of Budget Enhancement &Variation Orders.
10. Manage Change Control Committee Preparation and submittal of Variation Orders.
11. Ensure the Implementation of Projects & Connections Procedures - Initiatives follow up monitoring & development.
12. Ensure that Contractors & Consultants are following Abu Dhabi HSMS and ADDC HSEQ System Safety Rules, procedures and guidelines by conducting planned and surprise Audits by HSEQ Engineer.
13. Ensure that Fixed Asset Register BOQ, Performance Evaluations, and lessons learned are done prior to issuance of Provisional Acceptance Certificate (PAC) and Final Acceptance Certificate (FAC).
14. Manage Free Issue Material Management Plan generation on quarterly basis.
15. Submit to HSEQ Department Environment, Health and safety performance summary Report on monthly basis, follow up accidents & disciplinary action including CPAR of previous internal and external audits.
16. Prepare documentation for Capital efficiency of ADDC’s water and electricity capital expenditures over the price control against Bureau’s efficiency.
17. Ensure compliance with ISO55000 and support ADDC the successful certification of Pas55.

Senior Projects Engineer / Project Manager at Abu Dhabi Distribution Company
  • United Arab Emirates - Abu Dhabi
  • November 2010 to March 2017

I worked in Projects & Connections Directorate / Water Department as Senior Projects Engineer as a Project manager with the following responsibilities:

Responsibilities:

1. Review Preliminary and Detailed Design Reports.
2. Review Hydraulic and Surge Analysis.
3.IMS coordinator.
4.Conduct Surprise Audit on other engineers’ projects as part of the Quality team in the projects.
5. Review of tender documents, reply for queries during tendering Stage and prepare Technical Evaluation Report.
6. Prepare and manage kick-off meeting after awarding.
7. Review the program of work, monitor, and control progress to ensure that the projects are running efficiently, to budget and schedule and as per the specification.
8. Review, comment and approve Contractor's technical submittals and shop drawings.
9. Review contractor's monthly payments.
10. Manage, plan, organize, monitor and control projects to ensure that Witness the commissioning and assure that the project is meeting its objective.
11.Issue Provisional Acceptance certificate.
12.Issue Final Account and closeout for the Projects.
13.Issue Final acceptance certificate after completion of the warranty period.
14.Preparation Fixed Asset Register to capitalize the expenses

During this period, I was managing the following projects:

a- Water supply to GASCO / ADCO Facilities at Buhasa and Habshan.
b- Replacement Of buried Butterfly Valves and
c- Construction of valve chambers on PRMs and construction of washout chambers in existing water network in Abu Dhabi City
d-Water Supply Scheme to Masdar Shams -1 Project at Madinat Zayed
e-Water Supply to Two Islands at Hanjurah Area
f- Water Supply to Madinat Zayed Sectors 17 & 23

Senior Mechanical Engineer at Abu Dhabi Water & Electricity Authority
  • United Arab Emirates - Abu Dhabi
  • February 2003 to October 2010

I worked in Projects Directorate / Water Division as Senior mechanical discipline engineer for various projects and as a Project manager with the following responsibilities:
-Review Preliminary and Detailed Design Reports.
-Review Hydraulic and Surge Analysis.
-A Key member in ADWEA Water Standard Specification update committee.
-Review of tender documents, reply for queries during tendering Stage and prepare Technical Evaluation Report.
-Prepare and manage kick off meeting after awarding.
-Review the program of work and monitor and control progress to ensure that the projects are running efficiently, to budget and schedule and as per the specification.
-Review contractor's monthly payments.
-Manage, plan, organize, monitor and control projects to ensure that Witness the commissioning and assure that the project is meeting its objective.

During this period, I was managing the following projects:

a- Connections to Fujairah Water Transmission Scheme.
The project is connecting between the High pressure Fujairah Water Transmission Scheme DN1600 C.S. Twin line and the various areas known as taps off including the following:
-7.4Km DN600mm PN40 C.S. pipeline
-0.5Km DN800mm PN40 C.S. pipeline
-1x DN 1400 & 1 DN1200 PN40 C.S. Pipelines
-5 Km of 1x DN1400 & DN1200 PN25 D.I. pipes
-2 x DN 1000 D.I. pipelines
-5 Km DN900 D.I. pipeline
-2 x DN 1200 D.I.
-UT, MPI and Radiography of welded joints
-Hydrostatic test up to 60 bars for all pipelines
-Installation of anti surge system

b- Submarine line to Al Yafeena Island.

The project consists of the following:
-Construction of DI pipeline 900mm at Umm Al Nar
-Construction of Submarine HDPE pipeline to Al Yafeena Island, 500 dia. (OD) by open cut method.
-Construction of submarine HDPE branch to Al Barmiya Island, 355 dia. (OD)


c- Supply & Laying of D.I. Pipes to Different locations at East and West Liwa.

The project consists of the following:
-Supply and installation of 100km of DN150-400mm ductile iron networks through a scattered area (over 100km)
-180 house connections
-Tanker filling station
-13 time-actuated valves (to maintain pressure)
-Accommodation buildings for ADDC staff who operates existing pumping stations

d- Installation of interface and bulk water consumer metering points Stage 2

The project consists of the following:
-66 No. interface metering points including Electromagnetic flow meters, with remote readout, remote pressure transmitter, control valves and associated GRP kiosks
-29 Area metering points including Electromagnetic flow meters with remote readout with associated GRP kiosks with flow control valves
-110 bulk metering points including Electromagnetic flow meters with associated GRP kiosks
4- Solar power supply system with back up 24V DC battery or normal 230 VAC power supply system

e- Water Supply to Ghayathi And Hamra Militery Camp

-Water Supply from twin 1600 dia. Transco mains (fed from Shuwaihat desalination plant) through 29km 600 dia. DI PN 25 to Ghayathi and 2.5km 800 dia. DI PN25 to Takreer (refinery)
-2.5km 300 dia. DI to military reservoir
-New pump station at Bidaa Al Mutawa
-25km HDPE DN160 from Bidaa Al Mutawa P.S. to Umm Al Ashtan military camp

f- Water Supply to Al Wathba Prison Camel Race and Upgrading of Pumping Facilities at Salimyah and Ghanada

The scope of work comprises of the following:
-Al Wathba Prison Camel Race:Construction of a new water distribution network to supply the southern area of Al Wathba
-Al Khatim: Upgrading the existing water distribution system, and the refurbishment of the existing water storage tanks & pump station
-Salmiya:Construction of new pipelines to supply H.H. Sheikh Zayed farms
-Ghanada:Construction of a new water distribution system including new ground tank and pump station and distribution network.

Assistant Resident Engineer at Tebodin Consultants & Engineers
  • United Arab Emirates - Abu Dhabi
  • October 2002 to February 2003

I worked as Assistant Resident Engineer supervising the mechanical installation and commissioning in Additions & Modifications At Unit IV, Shobaisi & Remah Pump Stations Project responsible for the following;

-Review, comment and approve Contractor's technical submittals and shop drawings.
-Review the program of work and monthly progress to ensure completion in time.
-Review contractor's monthly payments.
-Supervise the installation, testing and commissioning activities to ensure best quality and compliance with tender specification.

The project consists of the following:

a- UNIT IV

1.Remove existing pumps and install 5 No. fixed speed vertically mounted pump sets 1500 m³/hr at 15.5 bar each.
2.Installing DN1000 D.I. Suction & discharge headers for the pumps.
3.Installing D.I. suction and discharge branches including all fittings, valves, flow control valves, etc.
4.Installing new 1420m, DN1000 cement lined carbon steel pipeline including fittings, valves, flow meters, etc. from pump station and connected to existing to main line to Shobaisi pump station.
5.UT, MPI and Radiography of welded joints.
6.Hydrostatic test up to 25 bars for all pipelines.
7.Installation of anti surge system consisting of 3 No. 70 m³ new surge vessels, 2 air receivers and 2 compressors connected to the main line.
8.SCADA Control of the system.

b- Shobaisi & Remah

1.Replace 5 old pumps with new similar horizontal centrifugal pumps 950m³/hr at 15.0 bar.
2.Replace old discharge PN25 carbon steel pipes of the pumps with new discharge piping and manifolds.
3.Installation of anti surge system including 2 no. of 70m³ surge vessels, compressed air piping and DN800 C.S. pipeline connected to main line.
4.UT, MPI and radiography of welded joints for the C.S. pipeline of the surge vessels.
5.Hydrostatic test for same line.

Project Manager at Al Hamed Development & Construction
  • United Arab Emirates - Abu Dhabi
  • July 1998 to October 2002

a) I worked in Construction, Completion & Maintenance of Water Supply Network For Air Force & Air Defense Institute Camp at Sheikh Zayed Military Cantonment project as a Project manager responsible for the following:

-Ensure best Planning of the project using Primavera and to assign the required resources, manpower, equipment and machinery to complete in time.
-Ensure proper design and shop drawings for the project.
-Price negotiation, orders' finalization and release orders to suppliers.
-Submitting Material submittals in accordance to tender specifications.
-Prepare monthly progress reports.
-Coordination with consultant and client.
-Supervising the erection, testing and commissioning of the project.
-Ensure preliminary handing over the project and final hand over after maintenance period completion.

The project consists of:
1-Construction main water supply network of the Camp including 50mm to 250mm UPVC piping, fittings, gate valves, altitude valves etc.
2-Laying 200mm GRE piping to existing Tanks.
3-Construction of Two Pumping Station which accommodated the following:
-Two variable speed pumps of 144 m³/hr capacity at 40 m head.
-Two variable speed pumps of 108 m³/hr capacity at 40 m head.
-Four variable speed pumps of 36 m³/hr capacity at 40 m head.
4-Supply and installation of PLC controller for the pumps.
5-Supply and installation of Two Pressure Vessels.
6-Hydrostatic testing for the network up to 8 bars.
7-Testing and Commissioning of the whole system

B)I worked in Buffer Tanks, Storage Tanks & Pumping stations at Ras Al Khaimah, Fujairah and Ajman project as senior project engineer responsible for the following:

-Tendering for various projects.
-Preparing & designing shop drawings for pump stations, surge system, chlorination, pipelines profile and sections using AutoCAD.
-Making take off material.
-Prepare the technical submittals.
-Planning of the project using Primavera under windows.
-Supervising the erection of the various system and pipes.
-Pumps Alignment.
-Process engineer for the project where the whole system is controlled by SCADA.
-Testing and commissioning.
-Maintenance for the system.

The project consists of:

1- Construction of five pumping stations, which accommodated the following:
- Three pumps of 570m³/hr capacity at 55 m head.
- Three pumps of 710m³/hr capacity at 73 m head.
- Three pumps of 355m³/hr capacity at 30 m head.
- Four pumps of 850m³/hr capacity at 55 m head.
- Three pumps of 425m³/hr capacity at 13 m head.
- Three pumps of 425m³/hr capacity at 64 m head.
- All the necessary piping, fittings & valves.
2-Construction of ten surge suppression vessels with the required accessories for the system.
3- Erection of D.I. pipes & fittings DN200 to DN1500mm connecting to 4 MIG Tanks Supplying to other stations and distribution networks.
4- Construction of two chlorination plants.
5- Testing and commissioning of the above

Mechanical, Planing and Maintenance Engineer at EL-COCORDE CONSTRUCTION LTD.
  • Jordan - Amman
  • February 1993 to July 1998

I had the following Responsibilities:

1- Tendering for various projects.
2- Preparing shop drawings and as built drawings using AutoCAD.
3- Planning of the projects using Primavera under windows, including Tabqat Fahel Water Supply Project, Upgrade & Expansion of Baqa'a Wastewater Treatment Plant, Improvement of Water Supply System Greater Amman Area and other different projects.
4- Prepare technical submittals.
5- Making the invoices.
6- Testing, commissioning and maintaining the above projects including pumps, pipes, butterfly valves, pressure reducing valves, control valves, check valves & other mechanical issues in other projects in the company.

1) From: 27th July, 1997 - 26th July, 1998

I worked in Improvement of water supply system for greater Amman - Jordan subcontract project as a Site manager responsible for the erection & commissioning of the following at four identical pump stations:

-Removal of existing pumps and replace them with 2500m³/hr capacities 314m head, 3500 Kw
-Removal of existing air compressors and aftercooler and replace them with new ones.
-Installation of 10MVA transformer.
-Hydrostatic testing for the piping at 30 bars.
-Penetration test for the welded joints.
-Pumps alignment.
-Calibration of control valves.
-Testing and commissioning for the system.

2) From 20th June, 1996 - 26th July, 1997

I worked in Abu Zeghan project as a mechanical engineer responsible for the erection & commissioning of the following:

-Erection of DN1400mm, 4Km steel pipeline
-Testing the line to 24 Bar
- Construction of DN1400mm suction & discharge headers.
-Construction of valve room including motorized butterfly valves & pressure reducing valves
-Calibration of the Pressure reducing valves.
- Erection of 6 sluice gates

3)From 13th February, 1995 - 19th June, 1996

I worked in Al Eshidya Jordan phosphate mine project as a mechanical supervisor engineer, responsible for the erection, testing & commissioning of the following:

-Collection of water from 21 bore wells in four collection headers and feeding to aeration tanks.
-Construction & assembly of two aeration tanks
-Storage of aerated water in well field reservoir of 12500 m³ capacity.
- Construction of two pumping stations:
Where the two pumping stations accommodated the following:
- Three high voltage pumps of 1375 m³/hr capacity at 94.5 m head.
- Two pumps of 835 m³/hr capacity at 35 m head.
- Two pumps of 730 m³/hr capacity at 15 m head.
- Two pumps of 140 m³/hr capacity at 25 m head.
- Four pumps of 35 m³/hr capacity at 25 m head.
-Construction of surge suppression vessels
-Construction of filtration system
-Construction of chlorine plant


4)From 13th February, 1993 - 12th February, 1995

I worked in National Park pumping station Project as a mechanical engineer, responsible of the erection & commissioning of the following:

- Construction of Pump House, which accommodated the following equipment:
- Four pumps of 600 m³/hr capacity at 200 m head, motor power 510kW.
- Two pumps of 300 m³/hr capacity at 200 m head, motor power 290kW.
- Carbon Steel piping, fittings & valves.
- Overhead crane of 10 Ton capacity.
-Testing the pipeline to 40 Bar.
-Construction of Diesel Generators plant which accommodated two Diesel Generators of 1000 KVA capacity each. Also included 15Ton Over Head Crane.
-Construction of chlorine building with all chlorine injection equipment like chlorine cylinders, chlorinators, water pumps, ejectors, chlorine residual analyzer and the safety equipment.
-Surge suppression vessels with the required air compressors and controls
-Construction of chambers for valves and flow meters of the different piping, which varies between 350 to 1000 mm sizes
- Calibration of control valves
-Planning of the project using Microsoft Project Software

Education

Bachelor's degree, Mechanical Engineering
  • at University of Jordan
  • January 1993

B.Sc. in Mechanical Engineering, from University Of Jordan in Jan. 1993 GRADUATION PROJECT: "ACOUSTIC POWER OF NEW COMPACT AXIAL FANS" In this project, new compact axial fans with different diameters were tested at various speeds to investigate the relationship between radiated noise and the various variables.

Specialties & Skills

Water Management
Design Optimization
Organizational Excellence
Business Continuity
Capital Projects
planning management through Primavera
AutoCAD
Internet
Distribution Networks
Design Review
Auditing
Pump stations
Word, Excel, powerpoint
testing & commissioining of all type of control valves
Quality management
Hydraulic modelling through Epanet
Projects Management
Buisness Management
EFQM Assesor
Excellance
business continuity

Social Profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.


Languages

Arabic
Expert
English
Expert

Memberships

Jordanian Engineers Society
  • member
  • January 1993

Training and Certifications

15 years experience, transformation champion and excellence award (Certificate)
Date Attended:
November 2019
Best ADDC innovative employee 2019 (Certificate)
Date Attended:
March 2019
Reaching innovative employee degree (Certificate)
Date Attended:
January 2019
التفكير الابداعي والابتكار والتجديد (Training)
Training Institute:
EDRAAK
Date Attended:
April 2019
Participating in development of the company by submitting innovative ideas (Certificate)
Date Attended:
July 2018
appreciation by MD for participation in al Najma Award (Certificate)
Date Attended:
April 2017
appreciation by MD for career coaching (Certificate)
Date Attended:
March 2018
Tebodin Consulting Experience (Certificate)
Date Attended:
March 2003
Al Hamed Development and Construction Experience (Certificate)
Date Attended:
October 2002
El Concorde experience certificate iso9001 (Certificate)
Date Attended:
July 1998
El Concorde experience certificate (Certificate)
Date Attended:
July 1998
Centrifugal pumps expert (Certificate)
Date Attended:
April 1998
Data Science workshop (Training)
Training Institute:
Stanford University
Date Attended:
May 2019
introduction to artificial intelligence (Training)
Training Institute:
EDRAAK
Date Attended:
March 2019
مختبر الابتكار الحكومي لصناعة المستقبل (Training)
Training Institute:
مركز محمد بن راشد للابتكار الحكومي
Date Attended:
December 2018
المسرعات الحكومية (Training)
Training Institute:
مركز محمد بن راشد للابتكار الحكومي
Date Attended:
February 2019
الابتكار في العمل الحكومي (Training)
Training Institute:
مركز محمد بن راشد للابتكار الحطومي
Date Attended:
December 2018
مهارات النجاح وتطوير الذات (Training)
Training Institute:
EDRAAK
Date Attended:
January 2019
مهارات تحديد الهدف وادارة الذات (Training)
Training Institute:
EDRAAK
Date Attended:
January 2019
مهارات الاتصال (Training)
Training Institute:
EDRAAK
Date Attended:
January 2019
شهادة محاور النجاح الستة (Training)
Training Institute:
EDRAAK
Date Attended:
January 2019
ادارة وتنظيم الوقت (Training)
Training Institute:
edraak
Date Attended:
January 2019
tracking planned projects viewer (Training)
Training Institute:
ARCFM
Date Attended:
November 2003
Duration:
8 hours
Sustainable Leadership (Training)
Training Institute:
Green Sheikh
Date Attended:
February 2015
Duration:
8 hours
leadership by influence (Training)
Training Institute:
MEDIX
Date Attended:
February 2014
Duration:
24 hours
Jordanian engineers membership (Certificate)
Date Attended:
February 1993
ADDC Fire Warden - emergency drill (Certificate)
Date Attended:
March 2017
Design of Potable Water Network (Training)
Training Institute:
CH2M
Date Attended:
April 2017
Duration:
32 hours
Core Values (Training)
Training Institute:
Abu dhabi university Khnowledge Group
Date Attended:
December 2016
Duration:
16 hours
EFQM assessor (Certificate)
Date Attended:
April 2015
Valid Until:
April 2018
System safety training (SSR) (Training)
Training Institute:
ADDC
Date Attended:
March 2014
Duration:
24 hours
Project, planning, scheduling, and Cost Control Professional (PSP) (Training)
Training Institute:
Projacs
Date Attended:
December 2012
Duration:
28 hours
ASTRO Strategy Execution Boot camp with score 16 out o 20 in exam (Training)
Training Institute:
ASTRO
Date Attended:
November 2012
Duration:
16 hours
IMS Foundation course Based on ISO 9001:2008, ISO14001 (Training)
Training Institute:
Bureau Veritas
Date Attended:
May 2010
Duration:
24 hours
Modeling & Simulation of Electro -mechanical Systems (Training)
Training Institute:
Cranefield University
Date Attended:
February 2010
Duration:
29 hours
Variable Speed Drive Systems (Training)
Training Institute:
Cranefield University
Date Attended:
November 2009
Duration:
29 hours
First Aid and community Safety (Training)
Training Institute:
UAE RED Crescent
Date Attended:
November 2009
Duration:
8 hours
Project Management: Skills for successes (Training)
Training Institute:
University of reading
Date Attended:
March 2009
Duration:
23 hours
Chartered Financial Analyst Level 1 Course (Training)
Training Institute:
7 city learning
Date Attended:
August 2008
Duration:
106 hours
Project Management Professional (PMP) (Training)
Training Institute:
AMIDEAST
Date Attended:
July 2008
Duration:
35 hours
Essential of contracting Negotiations and Claims (Training)
Training Institute:
Euromatech
Date Attended:
May 2007
Duration:
30 hours
Project Management: A to Z Best Practices (Training)
Training Institute:
AZTech
Date Attended:
December 2005
Duration:
40 hours
Communication and Interpersonal Skills (Training)
Training Institute:
Pacific consulting services
Date Attended:
June 2004
Duration:
24 hours
Microsoft Project 2002 (Training)
Training Institute:
Compubase
Date Attended:
May 2004
Duration:
24 hours
International Computer Driving License (Certificate)
Date Attended:
March 2004
Valid Until:
April 2004
Planning and scheduling with p3 (Training)
Training Institute:
Al Manahel Computer Service Center
Date Attended:
December 1996
Duration:
24 hours