Senior Engineer for Utilities and Highways
Parsons International
Total years of experience :23 years, 9 Months
1 Following Water Supply works and all Pressure testing
2 Following Site technical co-ordination works with all subcontractors
3 Review shop drawings for Utilities works and inspection requests
4 Review the method statement for all stages of utilities
5 Review Approval material and tests results
6 Following time control of the project and contract management
7 Submit monthly report of road and utilities to R.E
8 Following and Approval all technical stages of Utilities works (Storm water, Sewer sanitary, Micro tunneling, TSE and Irrigation)
9 Follow up Land Surveyor works
10 Attend weekly, monthly meetings with Client and Sub-Contractors.
11 Ensure that the safe working procedures are followed in accordance with
the Site Safety Plan.
12 Handing over all utilities work to stockholders
13 Review As built drawings for Utilities works
1 Review and following Box Culvert & pipe Culvert works
2 Drilling, extension, welding and coating of Gas and Oil pipelines
3 Protection of Gas and Oil pipelines inside the Box Culvert
4 Following Site co-ordination with all ministers’ utilities
5 Following Quality Control &time control of the project and contract
management
6 Following Production and implementation of the necessary quality procedures.
7 Review shop drawings for Roads & Utilities works
8 Following Asphalt works and Dynamic Test
9 Following Site co-ordination with all subcontractors
10 Submit monthly report of road and utilities to R.E
11 Review and Approval Method Statement for all stages of works.
12 Following all stages of Utilities works (Storm water, Sewer
sanitary, PTT, TSE, Irrigation, HT streetlight and Water supply)
13 To attend weekly, monthly meetings with Client and Sub-Contractors.
14 Following and Approval all stages of Road works (subgrade, subbase,
base and Asphalt work)
15 Review and Approval the Design mixture for the project
16 Supervisor the site for Testing and Inspection
17 Ensure that the safe working procedures are followed in accordance with
the Site Safety Plan.
18 Analysis, Evaluate and Monitor progress of project
19 Implementation of a System of Document Control for receipt of Design Information and release of Construction Drawings.
1 Providing technical consultations for utilities and Roads works at the site.
2. Following Site co-ordination with all ministers’ utilities
3 Approval the shop drawing of manholes for storm water
4 Follow up the implementation of the storm water lines
5 Site Supervision all stages of Road works (subgrade, subbase, and base)
6 Updated the utilities program.
7 Following Production of the necessary quality procedures.
8 Review and Approval shop drawings
9 Following and Approval all stages of Utilities works
10 Review the payments for all contractors
11 Following Site co-ordination with all subcontractors for utilities works
12 Review the Approved Method Statement for all stages of utilities and
Road works
13 Ensure that the safe working procedures are followed in accordance with
the Site Safety Plan.
14 Adoption of the method of Insulation the polymer manholes
16 Preparing Draft Agreements for Sub-Contracts, follow up payments and assisting Project Manager for contracting correspondence
1 Arrange, prepare and preliminary studies for the New Projects.
2 Providing technical consultations for Construction works for all buildings
3 Site co-ordination with all contractors
4 Following up projects during construction term.
5 Review all shop drawings
6 Follow up payments for all contractors
7 Review and Approve the updated of utilities program
8 Ensure that the safe working procedures are followed in accordance with
the Site Safety Plan.
9 Approved method statement for all works. .
1 Providing technical consultations for utilities works at the site.
2 Following and Approval all stages of Utilities works (Storm water, Sewer
sanitary, PTT, ITS, Irrigation, HT and street light )
3 Site co-ordination with all ministers’ utilities and Roads
4 Following and Approval all stages of Road works (subgrade, subbase,
base and Asphalt works)
5 Ensure that the completed works are recorded regularly
6 Review and Approval shop drawings
8 Submit monthly report of road and utilities to R.E
9 Present and Following all meeting with contractor and Clint
10 Following Asphalt works and Dynamic Test
11 Following Site co-ordination with all subcontractors
12 Execution the stages of sanitary sewerage pipe laying
13 Ensure that the safe working procedures are followed in accordance with
the Site Safety Plan.
14 Review and Approval the Design mixture for the project
15 Review method statement for all stages of utilities works.
16 Drilling, extension, welding and coating of gas and oil pipelines
17 Protection of gas and oil pipelines inside the concrete seals
1. Follow up utilities works at the site.
2. Insulation the polymer manhole for sanitary sewerage works
3. Execution the stages of sanitary sewerage pipelining
4. Construction manholes for storm water
5. Execution the storm water pipe laying
6 Execution the water supply works
7 Construction the chamber of valves for water supply
8. Updated the utilities program.
9. Site co-ordination with all services.
10. Production and implementation of the necessary quality procedures.
11. Making shop drawing.
12. Preparing Method Statement for all stages of utilities works.
1. Drilling, extension, welding and coating of Gas and Oil pipelines
2. Protection of Gas and Oil pipelines inside the Box Culvert
3. Site Co-ordination of the services with the team and the remainder of the works.
4. Execution the stages of sanitary sewerage pipe laying
5. Insulation the polymer manhole for sanitary sewerage works
6. Ensure that the safe working procedures are followed in accordance with the Site Safety Plan.
7. Ensuring that progress of the works is in accordance with the Contracts Programmer of works -CROW (Master Plan).
8. Insulation the polymer manhole for sanitary sewerage works
9. Execution the storm water pipe laying
10. Production and implementation of the necessary Quality Procedures and Method Statements for the works to be carried out in their sections.
11. Ensuring that progress records are maintained in a format as required by the Planner.
12. Construction the chamber of valves for water supply
13. Execution the water supply works
14. Implementation of a System of Document Control for receipt of Design Information and release of Construction Drawings.
15. Preparing Method Statement for all stages of utilities works.
16. Preparing Draft Agreements for Sub-Contracts, follow up payments and assisting Project Manager.
1. To co-ordinate with the Sub-Contractors.
2 Consultant the Construction works for all buildings
3 Following and Approval all stages of Utilities works (Storm water, Sewer
sanitary, PTT, TSE, Irrigation, HT and street light )
4 Construction the chamber of valves for water supply
5 Execution the water supply works
6 To prepare Daily, Weekly and Monthly Work Progress Reports.
7 Following and Approval all stages of Road works (subgrade, subbase,
base and Asphalt works)
8 Construction manholes for storm water
9 To co-ordinate with the Engineers and monitor the progress of the works.
10 Review shop drawings for Roads & Utilities works
11 Follow up Land Surveyor works
12 To attend weekly, monthly meetings with Client and Sub-Contractors.
13 Follow up all activities of Construction Committee.
14 Analysis, Evaluate and Monitor progress of project
15 Complete Installations of Scaffolding and Cradles as per site requirements.
.
1. Arrange, prepare and preliminary studies for New Projects.
2. Execution the stages of sanitary sewerage pipe laying
3. Construction the chamber of valves for water supply
4. Execution the water supply works
5. Technical follow up to the Project during Design term.
6. Arrange documents due to the Tender.
7. Following up project during construction term.
8. Construction and Execution box culvert for storm water
9. Execution the telephone network pipelining
10. Project Planning, Scheduling, follow up and update CPM.
11. Arrange Technical Reports which referring to the variation order.
12. Arrange Analysis studies for Civil Contracting.
13. Apply Technical recommendation and reply all requires.
14. Follow up all activities of Construction Committee.
15. Preparing Method Statement for all stages of utilities works.
16. Drilling, extension, welding and coating of Gas and Oil pipelines
17. Protection of Gas and Oil pipelines inside the Box Culvert
1. Arrange, prepare and preliminary studies for New Projects.
2. Execution the stages of sanitary sewerage pipe laying
3. Construction the chamber of valves for water supply
4. Execution the water supply works
5. Technical follow up to the Project during Design term.
6. Arrange documents due to the Tender.
7. Following up project during construction term.
8. Construction and Execution box culvert for storm water
9. Execution the telephone network pipelining
10. Project Planning, Scheduling, follow up and update CPM.
11. Arrange Technical Reports which referring to the variation order.
12. Arrange Analysis studies for Civil Contracting.
13. Apply Technical recommendation and reply all requires.
14. Follow up all activities of Construction Committee.
15. Preparing Method Statement for all stages of utilities works
1 .B.Sc. Metallurgical Engineer. 2. Department : Civil Works ( Metal Structures 3. University : Suez Canal University