MAHMOUD MOUSTAFA AHMED, Architecture Engineer

MAHMOUD MOUSTAFA AHMED

Architecture Engineer

ECG - Engineering consultant group

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, architectural engineering
Expérience
12 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :12 years, 1 Mois

Architecture Engineer à ECG - Engineering consultant group
  • Egypte - Le Caire
  • Je travaille ici depuis janvier 2020

-First project : AEON full finished luxury towers.
Owner : MARAKEZ Company (Mall of Arabia
owner).
Project contractor : Hassan Allam Sons .
Named job : Architecture engineer
Project cost : 750 Million Egyptian pound.
Project summary : project on plot area 12000
m2, and total built up area
115000 m2, the project scope
was concrete skeleton
and finishing phase; project is
consist of three towers
high raise building and each
tower have 20 floors.

Senior architecture engineer - Coordination engineer à Mahfouz for foundation and architecture company
  • Egypte - Le Caire
  • janvier 2019 à janvier 2020

-First project : Banque Du Caire - Sohag branch
Owner : Banque Du Caire
Consultant : Ace-Arab consulting
engineers-Moharram-Bakhoum
Named job : Senior architecture engineer
(Coordination engineer).
Project cost : 5 Million Egyptian pound.
Project summary : project on
plot area 500m2, the
project scope was
Finishing phase only; project
cost was five million
Egyptian Pound; consist of three
tellers, three customer Service
offices and back of house area.
-Second project : Banque Du Caire - Assuit Branch
Owner : Banque Du Caire
Consultant : ASSAF Group - Egypt
Named job : Senior architecture engineer
(Coordination engineer).
Project cost : 5 Million Egyptian pound.
Project summary : on plot area 600m2, the project
scope was finishing
Phase only; project cost was five
million Egyptian pound;
consist of five tellers, three
customer service offices
and back of house area.
-Third project : Development and renovation for
the administrative building of the
holding company for metallurgical
Industries - Cairo
Owner : Holding Company for Metallurgical
Industries
Consultant : Scientific center for design and
engineering consultancy.
Named job : Senior architecture engineer
(Coordination engineer).
Project cost : 15 Million Egyptian pound.
Project summary : project area 450 m2 for ground
floor and area for another four
typical floors is 525 m2, project
cost is fifteen million Egyptian
pound and project
Scope was repair slabs, beams,
and finishing work for all
Building and outer landscape

Site manager à Alkifah holding company
  • Arabie Saoudite - Riyad
  • mai 2017 à décembre 2018

First project : School Project - Area 4500M2.
Owner : Saudi Government.
Consultant : AECOM office for consultation .
Named job : Site manager .
Project cost : 14 Million S.R .
Project summary : Assim bin Thabit school, Riyadh,
Saudi Arabia. school project in
Riyadh on plot area 1500 m2 for
building, 3000 m2 for landscape,
main building consist of four
typical floors, the project consist
of 4 ancillary building,
the main fence for all project area
and the project cost was
fourteen million S.R.

Construction Site Manager à Topmobile company
  • Egypte - Le Caire
  • mai 2016 à mai 2017

First project : Arab Bank (Agouza Branch)
Owner : Arab Bank.
Consultant : Ashraf Sadiq consultant office for
design and supervision.
Named job : Site manager.
Project cost : 4 Million Egyptian pound.
Project summary : project on plot area 500 m2,
project scope was finishing
phase only; project cost was four
million Egyptian pound;
consist of three tellers, four
customer service offices and back
of house area.

Architecture site engineer (Owner) à Saudi Arabia - Riyadh - Prof. Khalid Bin Saeed(Shaqraa university director)
  • Arabie Saoudite - Riyad
  • décembre 2013 à avril 2016

First project : Auris towers hotel (300Rooms).
Owner : Prof. Khalid Bin Saeed(Shaqraa
university director)
Named job : Architecture site engineer (Owner)
Project cost : 60 Million S.R .
Project summary :A high raise building project in
Riyadh on plot area3600 m2, the
main tower is 2200 m2, consist of 3
floors underground and twelve
typical floors, the cost was 60
million S.R and it is five stars hotel.

Architecture engineer (technical office and site supervision) à Topmobile company
  • Egypte - Le Caire
  • octobre 2010 à mai 2012

-First project : Arab Bank (Mansora branch)
Owner : Arab Bank.
Consultant : Engineering consultant group (ECG).
Named job : Architecture engineer
(technical office and site supervision).
Project cost : 3 Million Egyptian pound.
Project summary : project on plot area 500 m2,
the project scope was finishing
phase only; project cost was
three million Egyptian pound;
consist of three tellers, four
customer service offices and
back of house area

-Second projec : Arab Bank (New Cairo branch).
Owner : Arab Bank.
Consultant : Engineering consultant group (ECG).
Named job : Architecture engineer (technical
office and site supervision).
Project cost : 4 Million Egyptian pound.
Project summary : project on plot area 600 m2,
two floors, the project scope
was Finishing phase only, the
project cost was four million
Egyptian pound; consist of four
tellers, five customer service
offices and back of house area.
- Third project : 8 New meeting rooms in Hilton
green plaza.
Owner : Hilton - Egypt branch.
Consultant : Look Pavilion.
Named job : Architecture engineer (technical
office and site supervision).
Project cost : 5 Million Egyptian pound.
Project summary : project on plot area 1200 m2,
the project scope was finishing
phase only, five stars hotel
finishes and the project cost
was 5 million Egyptian pound.

Architecture engineer (technical office and site supervision) à Topmobile company
  • Egypte - Le Caire
  • octobre 2010 à mai 2012

-First project : Arab Bank (Mansora branch)
Owner : Arab Bank.
Consultant : Engineering consultant group (ECG).
Named job : Architecture engineer
(technical office and site supervision).
Project cost : 3 Million Egyptian pound.
Project summary : project on plot area 500 m2,
the project scope was finishing
phase only; project cost was
three million Egyptian pound;
consist of three tellers, four
customer service offices and
back of house area

-Second projec : Arab Bank (New Cairo branch).
Owner : Arab Bank.
Consultant : Engineering consultant group (ECG).
Named job : Architecture engineer (technical
office and site supervision).
Project cost : 4 Million Egyptian pound.
Project summary : project on plot area 600 m2,
two floors, the project scope
was Finishing phase only, the
project cost was four million
Egyptian pound; consist of four
tellers, five customer service
offices and back of house area.
- Third project : 8 New meeting rooms in Hilton
green plaza.
Owner : Hilton - Egypt branch.
Consultant : Look Pavilion.
Named job : Architecture engineer (technical
office and site supervision).
Project cost : 5 Million Egyptian pound.
Project summary : project on plot area 1200 m2,
the project scope was finishing
phase only, five stars hotel
finishes and the project cost
was 5 million Egyptian pound.

Éducation

Baccalauréat, architectural engineering
  • à Cairo university
  • janvier 2010

courses: 3 – Certified license in occupational safety and healthy administration. 4 - Project management professional certified course (P.M.P)

Master, architectural engineering
  • à Cairo university
  • janvier 2010

Preliminary master degree in building technology from Cairo university.

Specialties & Skills

Project Management
bank project execution
Hotel Site Selection
Engineering
ADMINISTRATION
ADOBE PHOTOSHOP
CONSULTING
CUSTOMER SERVICE
ENGINEERING
ENGLISH
GOVERNMENT
LANGUAGES
MICROSOFT OFFICE
MICROSOFT WORKS

Langues

Anglais
Expert

Adhésions

OSHA
  • TRAINER
  • July 2013

Formation et Diplômes

Certified license in occupational safety and healthy administration (Certificat)
Date de la formation:
August 2013
Project management professional certified course (P.M.P) (Certificat)
Date de la formation:
October 2013
ICDL (Certificat)
Date de la formation:
July 2006
AutoCAD program -3D (Formation)
Institut de formation:
AMAC center
Date de la formation:
August 2007
Durée:
30 heures
AutoCAD program -2D (Formation)
Institut de formation:
AMAC center
Date de la formation:
February 2006
Durée:
30 heures
3d studio max (Formation)
Institut de formation:
Cairo university
Date de la formation:
September 2008
Durée:
35 heures
Primavera6.2 (Formation)
Institut de formation:
new horizon center
Date de la formation:
September 2013
Durée:
30 heures