Projects Director
DMT.contracting
Total years of experience :33 years, 4 Months
Oil &Gas infrastructure projects.
Construct new transmission Gas line in the western Area of Abu Dhabi United Arab Of Emarates.Client GASCO.cost 300, 000, 000US$.
1.Construction works associated with rehabilitation and replacement of existing sewer line in Abu Dhabi Island andMain land.Dorshe Consulting.ADSSC.cost 110, 000, 000US$.
2.Sewerage connection and replacement works fot Isolated properties in AlAinRegion UAE.60, 000, 000US$.
3.potable water Zone1.
construction& replacement of old ductile pipes soft water.client AADC.consulting Aecom.114, 000, 000US$.
4.potable water Zone2.
Construction & replacement of old DI pipes soft water.Client AADC.AECOM Consulting.220, 000, 000US$.
AlFijarah Sea Port Extention-Northern Land Reclamation &Navy piers-Infrastructure.MucCondulting.Gov.of fujarah.UAE.
Cost 160, 000, 000US$.
Ras Alkhaimah Marine Works/sea port ship lift system&maritime works new jetty phase 1AAt Aljazeera TasAl Khaimah.UAE.
Government of R.A.K.consultant China Harbor.80, 000, 000US$.
JXBStorm Water &Serage System AlMaktoom Air Port..
Construction of Biotechnology Building G+B+7.Government of Dubai.consultan MOTT.
1.Construction of power plant.Turn key project.3*400 MW Gas Turbine frame 9 E combined cycle GT supplied by GEEurope.with electro mechanical and covil works.Engineering procurment and construction procedure were planned and implemented.location Iraq south of Baghdad.
2.Rehabilitation of Abdullapower plant .Iraq.kirkuk.
Teplacement the damage x units with new units 12*25 MW..
Construct new Roads with 6 loops inter change.Owner Irqi Gov.Main Contractor Bechtel.Consultant.Irqi Roads &Highway community.
Expansion of BaghdadNorth water pump station stage 1.Cost 165, 000, 000US$.
Construction Of 1500 Residential Buildings.Iraqi Stat Gov.cost 300, 000, 000US$.
Rehabilitation power plants, high way, with bridgeslocation south of Iraq.Sewer and potable water north of Iraq.Maintian the high way between Nasyria And Basrah south of iraq.165, 000, 000US$.
1.Construction of Residential Buildings of 15000 Residential unit.-infrastructure pakage 1 with precast factory.
2.Operation&MaintenanceDivision Manager/southAreaCamp.Work Description..Reconstruction of High Way south of Iraq R3 Road.Recostruction of Hartha Power station with the substation.
3.Work D ivision Manager Eastern Area.Iraq.housing programe.