Total Years of Experience: 20 Years, 1 Months
March 2016
To Present
IT Project Manager
at MENACA
Location :
United Arab Emirates - Dubai
May 2015
To January 2016
Wireless Manager
at AsiaTech Co
Location :
Iran
- Design, install and Maintenance FULL MESH Topology Radio Microwave Network with 6Gbps Capacity
- Design, install and Maintenance PTP Radio Microwave Links (6GHz-7/8GHz-18GHz-23GHz) Over SDH/PDH Technology
- Research and Prepare Radio Microwaves
- Site Survey and Calculation Link Budget, Link distance, height, Path Profile, etc. Take Telecom Permits
- Design, install and Maintenance PTP Radio Microwave Links (6GHz-7/8GHz-18GHz-23GHz) Over SDH/PDH Technology
- Research and Prepare Radio Microwaves
- Site Survey and Calculation Link Budget, Link distance, height, Path Profile, etc. Take Telecom Permits
June 2011
To October 2012
CTO
at Keyhan Telecom Inc
Location :
Iran
Managed and expanded the network and IT infrastructures
February 2008
To November 2011
Director of ADSL Implementation and Development - Technical Maintenance - Transmission Units
at SHATEL
Location :
Iran
- Design, install and Maintenance FULL MESH Topology Radio Microwave Network with 6Gbps Capacity
- Design, install and Maintenance PTP Radio Microwave Links (6GHz-7/8GHz-18GHz-23GHz) Over SDH/PDH Technology
- Research and Prepare Radio Microwaves
- Site Survey and Calculation Link Budget, Link distance, height, Path Profile, etc. Take Telecom Permits
- Design, install and Maintenance Radio Wireless Network In Radio Frequency Range 2.4GHz, 5.8GHz, 5.4GHz, 4.9GHz
- Take Regulatory Authorizing the use of frequencies Permits
- Create a comprehensive plan with respect Of Principles and Standards For Site Installation
- Run Telecom High pair cables (200-1000-1800 etc.) For DSL Service Use
- Launch PTP SDH Devices For transition E1 Lines From Core Site To Edge Sites As Sites Uplinks
- Take Permits And Setup 8Gbps Backbone Links With Redundancy On Fiber And Microwave Structures
- Run Design Committee In order to optimize installations and Better use of space and facilities
- Run Review Committee To Review Errors and Bugs occurred and Extraction rules In order to Optimization of the maintenance
- Created Management reports and utilization them For Improve quality of service
- Using Monitoring Services Such As : Cacti, Solar winds, Smoke Ping, NMS In order to Optimization of the maintenance
- Run Shift In order to the maintenance
- Maintenance Of the Datacenter And Core Site
- Leading technical team to Run Transition Line For Internet uplinks Of DSL Sites In Scope Of All province Of Country
- Leading technical team to Install And Maintenance Of DSL Network In Scope Of All province Of Country
- Install All Of the DSL PASSIVE networks requirements Such As : Telecom Terminals ( KT, Crouse, 3Com, etc.), 25 pair telco cable, AC-DC Cables And PDB, Rack, Ladder, Fiber And E1 OCDF, POTS Splitter, etc.
- Install All Of the DSL ACTIVE networks requirements Such As : Switches, Routers, Media Convertors, DSLAM, Modems ( MPLS, G.SHDSL, E1, etc.), SDH, etc.
- Design, install and Maintenance PTP Radio Microwave Links (6GHz-7/8GHz-18GHz-23GHz) Over SDH/PDH Technology
- Research and Prepare Radio Microwaves
- Site Survey and Calculation Link Budget, Link distance, height, Path Profile, etc. Take Telecom Permits
- Design, install and Maintenance Radio Wireless Network In Radio Frequency Range 2.4GHz, 5.8GHz, 5.4GHz, 4.9GHz
- Take Regulatory Authorizing the use of frequencies Permits
- Create a comprehensive plan with respect Of Principles and Standards For Site Installation
- Run Telecom High pair cables (200-1000-1800 etc.) For DSL Service Use
- Launch PTP SDH Devices For transition E1 Lines From Core Site To Edge Sites As Sites Uplinks
- Take Permits And Setup 8Gbps Backbone Links With Redundancy On Fiber And Microwave Structures
- Run Design Committee In order to optimize installations and Better use of space and facilities
- Run Review Committee To Review Errors and Bugs occurred and Extraction rules In order to Optimization of the maintenance
- Created Management reports and utilization them For Improve quality of service
- Using Monitoring Services Such As : Cacti, Solar winds, Smoke Ping, NMS In order to Optimization of the maintenance
- Run Shift In order to the maintenance
- Maintenance Of the Datacenter And Core Site
- Leading technical team to Run Transition Line For Internet uplinks Of DSL Sites In Scope Of All province Of Country
- Leading technical team to Install And Maintenance Of DSL Network In Scope Of All province Of Country
- Install All Of the DSL PASSIVE networks requirements Such As : Telecom Terminals ( KT, Crouse, 3Com, etc.), 25 pair telco cable, AC-DC Cables And PDB, Rack, Ladder, Fiber And E1 OCDF, POTS Splitter, etc.
- Install All Of the DSL ACTIVE networks requirements Such As : Switches, Routers, Media Convertors, DSLAM, Modems ( MPLS, G.SHDSL, E1, etc.), SDH, etc.
July 2001
To January 2008
CTO
at KHONSORKH MINERALS COMMERCIAL Co
Location :
Iran
- Maintenance of the BUS Topology Network Witch it contained BNC, Coaxial Cables, 10Base - -Network Adapters and etc.
- Maintenance of the Network With Novell Netware 3.12 OS On IPX Protocol
- Upgrade Network To Star Topology Using Cat5e Technology, Switches, Patch Panels, Keystones And etc.
- Upgrade Network OS To Novell Netware 4.12 Then 5 On TCP/IP
- Launch Windows 2000 With Active Directory
- Setup Two Way Satellite For Internet Use
- Launch Point- to-Point Wireless Link Based On 2.4GHz Using 4W Amplifiers In 42Km Distance
- Transmission 8 Lines telephone On Wireless Link Using VOIP GATEWAY Devices
- Support Financial And Inventory Software
- Development VOIP Connections Between Company Branch Offices In Different Cities
- Maintenance of the Network With Novell Netware 3.12 OS On IPX Protocol
- Upgrade Network To Star Topology Using Cat5e Technology, Switches, Patch Panels, Keystones And etc.
- Upgrade Network OS To Novell Netware 4.12 Then 5 On TCP/IP
- Launch Windows 2000 With Active Directory
- Setup Two Way Satellite For Internet Use
- Launch Point- to-Point Wireless Link Based On 2.4GHz Using 4W Amplifiers In 42Km Distance
- Transmission 8 Lines telephone On Wireless Link Using VOIP GATEWAY Devices
- Support Financial And Inventory Software
- Development VOIP Connections Between Company Branch Offices In Different Cities
Share on Facebook
Share on Twitter
Share Via Email