Project Manager
Siemens Ltd.
مجموع سنوات الخبرة :20 years, 4 أشهر
Project Management
Responsibilities:
o Activities and resource planning.
o Organizing and motivating a project team.
o Controlling time management by
o Define activity, Sequence activity,
o Estimate the duration of activity,
o Develop a schedule and Maintain a schedule.
o Re-cost estimating and developing the budget.
o Ensuring customer satisfaction.
o Analyzing and managing project risk.
o Monitoring progress.
o Managing reports and necessary documentation.
PROJECTS:
• EPC of new 33/13.8 KV HHR Substation at KING ABDULLAH ECONOMIC CITY (33 million SR)
• EPC of new 33/13.8 KV LAJWAN Substation at LAJWAN City for SEC - SOA (27.5 million SR).
• EPC of 33/13.8 KV MASNAH substation at Abha City for the SEC - SOA (42 million SR), successfully started and executed for 4 months as PM (A), ensuring effective execution of design and procurement milestones.
• EPC of 33-13.8kV Mobile substations 2 nos. for SEC - NG - COA and EOA.
TENDERING:
RESPONSIBILITIES
o Reviewing of information about demands and derivation of supply and proposal preparations.
o Attending Job explanation meeting.
o Site visit with customer.
o Identification of all risk.
o Preparation of Bid / No Bid decision.
o Preparation of RFQs and collection of offers.
o Offers review and negotiation with suppliers.
o Preparation of cost and price calculations and offer letter.
o Offer Submission.
o Post bid clarifications.
o Handing over to execution.
Projects
• Electrical Substations for Saudi electricity company and national Grid.
• Electrical distribution networks for the industries.
• Solar Project
Review project requirements, specifications, Scope of work and IFB and IFC Drawing packages
Preparation of the project execution plan. Planning, scheduling and execution of EI&C jobs.
Surveillance of the construction activities according to the IFC drawings, SAES, Specification and applicable industrial code practices in coordination with Saudi ARAMCO PMT.
Implementation of the control philosophy by coordinating with clients, study and verification of P&IDs and IO Lists, selection and procurement of components.
Designing and preparation ILDs.
Designing and preparation of Equipments interconnection diagrams for the LV, MV switch gears and transformers.
Preparation of Material Take off request (MTO).
Quotations, vendor drawing and NMR review.
Preparation of the TQ (Technical quires) if design have some conflict with SARMCO standard or side conditions
Installation, calibration and commissioning of PLC, IBMS, DDC, Fire alarm System, sensors, Transducers, MOVs, FCVs, VFDs, dry sprinkler system, Motors (LV/MV), chillers (MV), Switch Gears(MV/LV), MCCs (MV/LV), Transformers (MV/LV) with protection panels, UPS, Battery charger, cooling tower, VAVs and Lighting control system
Installation of cable tray and conduit network.
Instrument, control, telecommunication and LV/MV power cable pulling and testing.
Conduct Factory Acceptance Test (FAT) with clients.
Site Acceptance Tests (SAT) for control systems
Pre-commissioning and commissioning
Project hand over with completion of Punch list and red line drawings.
Industrial Electronics Engineering