Company AL Khadda International Kuwait
Position Project Manager
Client Kuwait Oil Company, Kuwait
Project Replacement of ESDV/AOV/ Valves at BS 140 & BS 150
Period Jan 2009 to Till Date
Responsibilities
• Overall Responsibility for the Execution of Kuwait Oil Company project "Replacement of Emergency Shutdown Valves/ AOVs/Control Valves in Booster Station BS140 and BS 150.
• Construction and Expansion of Control room building in Gas Booster Station at Burgan area in Booster no: 140 and Booster No: 150.
• Co ordination and verification of Design Engineering.
• Replacement of ESDV valves SIL 3 rated in Booster Station BS 140 and BS 150 in the size up to 42 inch.
• Co ordination and Execution supervision of piping works and associated field piping modification.
• Co ordination of vendor design and execution supervision of the Fire fighting system.
• Co ordination of DCS sub contractor to execute the Up gradation of DCS for the new ESD system.
• Co ordination of HVAC sub contractor to execute the ducting and ventilation for the new control room building.
• Co ordination and follow up for the Replacement of ESD system for the new valves.
• Co ordination of piping design contractor.
• Co ordination of Sub contractor activities
• Preparation of project reports and attend client progress meeting.
• Verification of shutdown, Purging and Hydro test procedures.
Company Técnicas Reunidas, S.A. \[Kuwait\]
Position Senior Mechanical Construction Engineer
Client Kuwait Oil Company, Kuwait
Project GC 28 Capacity Expansion for Compression and Medium crude Processing.
Period Aug 2006 to Dec 2008
Responsibilities
The scope of work includes expanding Gathering Centre No 28 (GC 28) by modifying existing facilities and installing new facilities to increase production of medium crude oil 60, 000 STBOPD and associated gas and formation water.
Activities involved in project like,
• Co ordination and supervision of erecting the following new main equipments to increase productivity of GC28 - HP separator, wet crude oil storage tank, Desalter train, Feed pump, TV Compressor, HP/LP compressor, Heat exchangers, Trim cooler, Refrigeration package, LP/HP Compressor suction & Discharge scrubber, Degassing boot, MP Condensate separator and interconnecting pipes
• Co ordination and supervision of pre fabrication and erection of piping works for various services line ½"dia to 56"dia
• Co ordination and supervision of underground Piping in closed drain services
• Co ordination and supervision of tie-in activity like isolation, spading, draining, purging and flushing
• Co ordination and supervision of Hot tapping activity for various services
• Co ordination and supervision of structural platform and pipe supports
• Co ordination and supervision of hydro test activities
• Preparation of tie-in package, shutdown planning activity
• Co ordination of engineering activity as per site modification pipe line.
• Co ordination of shutdown activities to execute the job as per schedule.
• Project review meeting with client and sub contractor.
Company Mushrif Trading and contracting company ( Kuwait)
Period Aug 2002 to Jul 2006
Position Project Incharge
Client National Industries Company (Kuwait)
Project Design and Installation of 12"/6" Fuel Gas Line
Responsibilities
Supervision of
• Construction of Drip Barrel and Tie in Valve pit
• Installation of 12"/6" Carbon Steel Pipes, Valves
• Hot Tapping of 52" LP Fuel Gas from KOC Mina Abdullah to NIC Company 12" Fuel Gas Line
• Hydro Test, Road Crossing, Crash Barrier of 12"/6" Fuel Gas Line
• Nitrogen purging of 12" fuel gas line for Tie - in connection
• Erection of Drip Barrel and its piping connection.
Position Construction Engineer
Client Kuwait Oil Company, Kuwait
Project Installation of New Effluent Water Pumps and Disposal Pits
Responsibilities
Supervision of
• Installation of 8" FRP Pipes from existing Valve Pit inside GC's to new Disposal Pits in GC's # 9, 10, 20 & 22.
• Fabrication and Installation of skimmer pipes in Disposal Pits
• Fabrication and Installation of siphon pipes.
• Installation and holiday test for road crossing 14" pipes in GC's 9, 10, 20 & 22
• Hydro testing of new FRP pipes from valve pit to disposal pit.
Position Mechanical Engineer
Client Kuwait Oil Company, Kuwait
Project Installation of Controls to Maintain Fixed Split of Liquid Phase Flow to wet Tanks at GCs 1, 2, 3, 6 & 20
Responsibilities
Supervision of
• Co ordination with consultant to prepared Engg drawings.
• Preparation of shutdown, Hydro test& Hot tapping procedures.
• Supervision of piping fabrication.
• Preparation of daily progress activities
• Co ordination of manpower and equipment utilities.
• Co ordination of Hot tapping activities in GC's.
• Attend project meeting with client.
Position Mechanical Engineer
Client Saudi Arabia Texaco
Project Installation of Inline Auto Sampling System
Responsibilities
Supervision of
• Installation of Auto sampling system in 36" crude oil existing line and its facilities.
• Preparation of drawings, shutdown procedure and method statement.
• Co ordination of manpower and equipment arrangement.
• Co ordination with client inspection engr for material inspection, weld inspection and valve inspection.
Company Clough Engineering. Ltd
Position Construction Engineer
Client Kuwait National Petroleum Company (Kuwait)
Project 93% Hydrogen Transfer from Shuaiba to Mina Abdullah Refinery
Period Apr 2001 to Jul 2002
Responsibilities
Supervision of
• Piping and Equipments erection works of 10" Hydrogen Transfer Line
• Hot tapping of 48" Lean gas from PIC to Shuaiba 8" Lean Gas Line
• Prepare Field Change notification, Fabrication Erection of Piping Drawings, Project status, Material take off, update daily progress report.
• Installation of Hydrogen line, cooling water supply and return line etc.,
• Erection of Hydrogen lean gas compressor, Heat exchanger, Lube Oil skid, Gland steam condenser and receiver, catch pot etc.,
• Installation of Pipe from tie - in points to compressor, Lube oil skid etc.,
• Erection of pipe supports, fixing of anchor and Guide supports.
• Involved in GRTA shut down activities.
• Managing Sub-contractors and co-ordination with Clients & report daily activities.
Company Ramsis Contracting. Co, Bahrain
Position Mechanical Engineer
Client ALBA (Bahrain)
Project Alba Jetty Projects (Alba Trippered Belt Conveyor)
Period Apr 2000 - Sep 2000
Responsibilities
Supervision of
• Fabrication and installation of carbon steel pipes for fluidizing lines
• Installation of piping work for Desalination Plant Erection of Pipe racks and supports
• Preparing daily progress report, control site activities and attending Client's Progress meeting.
Company Cleveland Bridge and Engineering. Middle East Ltd. Dubai
Position Site Superintendent
Client ABB (Dubai)
Project DUBAL - Fume Treatment Plant
Period Jul 1998 - Jun 1999
Responsibilities
Supervision of
• Mechanical Piping works for Fume Treatment Plant
• Erection, assembly and pre assembly of storage tanks and its pipe connection.
• Prepare site modification drawings and update daily progress activities.
Company Al-Khodari Heavy Industries, Saudi Arabia
Position Mechanical Engineer
Clients
• Saudi Aramco (Saudi Arabia)
• Kvaerner Saudi Davy (Saudi Arabia)
• Adwan Chemical Industries (Saudi Arabia)
Period Nov 1994 - Oct 1997
Responsibilities
• Fabrication of cooling Water lines, Flare, Instrument Air, Nitrogen lines, Pipe Supports
• Fabrication and erection of condensate Storage tank, Solution Storage Tank, Boiler Feed Water Tanker, Fire Water Tank and its Connection Piping and Supports.
• Fabrication and installation of Sodium Silicate Tank, Caustic Soda, Crude Oil Storage Tanks and its Piping Connection and Supports.
• Fabrication of Piping Works
• Fabrication and erection of various Storage Tank
• Fabrication and erection of various Storage Tank and its Piping connection
- Job role:
-
Engineering